ML17305B315: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED                                     DEMONS'IIB TION SYSTEM
/ATTRIBUTION DEMONS'IIB TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9101160255 DOC.DATE: 91/01/10 NOTARIZED:
                            /ATTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
ACCESSION NBR:9101160255             DOC.DATE: 91/01/10   NOTARIZED: NO         DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME           AUTHOR AFFILIATION LEVINE,J.M.           Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME         . RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME
.RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Special Rept 2-SR-90-007:on 901212,diesel generator valid test failure.Caused by air in diesel generator fuel lines.Maint bulletins distributed to plant maint 6 work control groups.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.D NOTES:Standardized plant.05000529 RECIPIENT ID CODE/NAME PD5 LA TRMIELL, C INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DS P NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8ERES/DSIR/EIB EXTERNAL: EGGG BRYCE,J.H NRC PDR NSIC MURPHY,G.A NOTES: COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2 2 1 1 1 1 2 2 1 1 1 1 1 1 3 3 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD TRAMMELL, C.ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DLPQ/LHFB11 NRR/DOEA/OEAB NRR/DST/SELB SD NRR/DRAT SPLBSD1 RG F~L ST LOBBY WARD NSIC MAYS,G NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Special Rept 2-SR-90-007:on 901212,diesel generator valid test failure. Caused by air in diesel generator             fuel lines.
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 35 ENCL 35 il JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 192-00709-JML/TRB/RKR January 10, 1991 U.S.Nuclear Regulatory Commission Attention:
Maint bulletins distributed to plant maint 6 work control groups.                                                                           D DISTRIBUTION CODE: IE22D           COPIES RECEIVED:LTR       ENCL       SIZE:
Document Control Desk Mail Station Pl-37 Washington, DC 20555
TITLE: 50.73/50.9 Licensee Event Report (LER),             Incident Rpt, etc.
NOTES:Standardized plant.                                                         05000529 RECIPIENT               COPIES          RECIPIENT          COPIES          D ID   CODE/NAME           LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD5 LA                       1    1    PD5 PD                  1    1 TRMIELL,C                   1 D
1    TRAMMELL,C.            1    1 INTERNAL: ACNW                           2    2    ACRS                    2    2 AEOD/DOA                     1    1    AEOD/DSP/TPAB          1    1 AEOD/ROAB/DSP                2    2    NRR/DET/ECMB 9H        1    1 NRR/DET/EMEB 7E             1    1    NRR/DLPQ/LHFB11        1    1 NRR/DLPQ/LPEB10             1    1    NRR/DOEA/OEAB          1    1 NRR/DREP/PRPB11             2    2    NRR/DST/SELB SD        1    1 NRR/DST/SICB 7E             1    1    NRR/DRAT SPLBSD1        1    1 NRR/DST/SRXB 8E              1    1                            1    1 RES/DSIR/EIB                 1    1    RG      F~            1    1 EXTERNAL: EGGG BRYCE,J.H                 3     3     L ST LOBBY  WARD      1   1 NRC PDR                      1     1     NSIC MAYS,G            1   1 NSIC MURPHY,G.A              1    1    NUDOCS FULL TXT         1   1 NOTES:                                    1     1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               35   ENCL   35


==Dear Sirs:==
il Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~  PHOENIX. ARIZONA85072-2034 192-00709-JML/TRB/RKR JAMES M. LEVINE VICE PRESIDENT                                                January 10, 1991 NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington,    DC  20555
 
==Dear   Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529.(License No.NPF-51)Special Report 2-SR-90-007 File: 91-020-404 Attached please find Special Report 2-SR-90-007 prepared and submitted pursuant to Technical Specifications 4.8.1.1.3 and 6.9.2.This report discusses the Unit 2"A" diesel generator valid test failure.If you have any questions, please contact T.R.Bradish, Compliance Manager at (602)393-2521.Very truly yours, JML/TRB/RKR/dmn Attachment cc: W.F.J.B.D.H.A.C.A.H.Conway Martin Coe Gehr Gutterman (all with attachment) 9101i60255 910ii0 PDR ADOCK 05000529 PDR r~,>
Palo Verde Nuclear Generating Station (PVNGS)
PALO VERDE NUCLEAR GENERATING STATION UNIT 2 Diesel Generator Valid Test Failure December 12, 1990 License No.NPF-51 Docket No.50-529 Special Report 2-SR-90-007 Initial Conditions'n December 12, 1990 at approximately 0124 MST, Palo Verde Unit 2 was in MODE 1 (POWER OPERATION) at 100 percent power.Descri tion o Event This Special Report is being submitted pursuant to Technical Specifications (TS)4.8.1.1.3 and 6.9.2 and contains the information
Unit 2 Docket No. STN 50-529 .(License No. NPF-51)
'recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977 for a diesel generator valid test failure.At approximately 0500 MST on December 11, 1990, the Unit 2"A" diesel generator was declared inoperable and taken out of service for preplanned maintenance.
Special Report 2-SR-90-007 File: 91-020-404 Attached please find Special Report 2-SR-90-007 prepared and submitted pursuant to Technical Specifications 4.8.1.1.3 and 6.9.2. This report discusses the Unit 2 "A" diesel generator valid test failure.
This included replacement of the fuel oil line from the engine mounted fuel oil head tank to the left bank supply header to correct minor fitting leakage.At approximately 2145 MST on December ll, 1990, maintenance work was completed and preparations were made to perform the surveillance test to verify diesel generator operability.
If you have   any questions,   please contact T. R. Bradish, Compliance Manager at (602) 393-2521.
At approximately 0124 MST on December 12, 1990, the"A" diesel generator was started in accordance with an approved procedure to perform the monthly TS surveillance.
Very truly yours, JML/TRB/RKR/dmn Attachment cc:     W. F. Conway        (all with      attachment)
It took approximately 10.9 seconds after initiating the diesel start for the generator voltage to reach the minimum acceptance voltage of 3740 volts.The observed generator frequency initially approached 60 Hz, but then dropped, returning to 60 Hz within 10 seconds after initiating the start.TS 4.8.1.1~2 requires that the diesel generator be demonstrated OPERABLE by verifying that the diesel generator can start and accelerate to generator voltage and frequency at 4160+420 volts and 60+1.2 Hz in less than or equal to 10 seconds.Therefore, this was a diesel generator valid test failure.Concurrent with the diesel generator start, a loud bang was heard in the Control Room.The diesel continued to idle normally and was manually tripped approximately 5 minutes after starting.An investigation of the noise found that the relief device on the diesel generator exhaust silencer had lifted.The diesel generator was inspected for damage and rolled on starting air.The inspections included a visual inspection of valve train components, video probe examination of the turbocharger, and a visual inspection of the exhaust silencer internals.
J. B. Martin D. H. Coe A. C. Gehr A. H. Gutterman 9101i60255 910ii0 PDR       ADOCK   05000529 PDR r~,>
No abnormalities were noted during these inspections and there was no indication of  
 
PALO VERDE NUCLEAR GENERATING STATION     UNIT 2 Diesel Generator Valid Test Failure December 12, 1990 License No. NPF-51 Docket No. 50-529 Special Report 2-SR-90-007 Initial Conditions'n December 12, 1990               at approximately 0124 MST, Palo Verde Unit 2 was in MODE 1 (POWER OPERATION)               at 100 percent power.
Descri tion             o   Event This Special Report is being submitted pursuant to Technical Specifications (TS) 4.8.1.1.3 and 6.9.2 and contains the information
'recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977 for a diesel generator valid test failure.
At approximately 0500 MST on December 11, 1990, the Unit 2 "A" diesel generator was declared inoperable and taken out of service for preplanned maintenance.                 This included replacement of the fuel oil line from the engine mounted fuel oil head tank to the left bank supply header to correct minor fitting leakage. At approximately 2145 MST on December             ll,   1990, maintenance work was completed and preparations were made to perform the surveillance test to verify diesel generator operability.
At approximately 0124                 MST on December 12, 1990, the "A" diesel generator was   started in accordance with an approved procedure to perform the monthly TS surveillance. It took approximately 10.9 seconds after initiating the diesel start for the generator voltage to reach the minimum acceptance voltage of 3740 volts. The observed generator frequency initially approached 60 Hz, but then dropped, returning to 60 Hz within 10 seconds after initiating the start.                 TS 4.8.1.1 2 requires
                                                                            ~
that the diesel generator be demonstrated OPERABLE by verifying that the diesel generator can start and accelerate to generator voltage and frequency at 4160 + 420 volts and 60 + 1.2 Hz in less than or equal to 10 seconds.               Therefore, this was a diesel generator valid test failure.
Concurrent with the diesel generator start, a loud bang was heard in the Control Room. The diesel continued to idle normally and was manually tripped approximately 5 minutes after starting. An investigation of the noise found that the relief device on the diesel generator exhaust silencer had lifted. The diesel generator was inspected for damage and rolled on starting air. The inspections included a visual inspection of valve train components, video probe examination of the turbocharger, and a visual inspection of the exhaust silencer internals.                   No abnormalities were noted during these inspections and there was no indication of


damage to the diesel generator.
damage to the diesel generator. At approximately 1505 MST on Decemb'er 12, 1990 the           diesel generator was started and ran successfully during trouble shooting. At approximately 2008 MST on December 12, 1990, the diesel generator was successfully tested and returned to OPERABLE status.
At approximately 1505 MST on Decemb'er 12, 1990 the diesel generator was started and ran successfully during trouble shooting.At approximately 2008 MST on December 12, 1990, the diesel generator was successfully tested and returned to OPERABLE status.Cause o Event'preliminary investigation determined that the cause of the valid test failure was air in the diesel generator fuel lines.There were no administrative requirements to fill and vent the fuel lines after maintenance.
Cause o   Event' preliminary investigation determined that the cause of the valid test failure   was air in the diesel generator fuel lines. There were no administrative requirements to maintenance.
Initially there was sufficient fuel flow to start the diesel, then the air reached the injectors and the diesel rpm dropped.The diesel speed governor responded to the decreasing rpm by moving the fuel racks in the more fuel direction.
fill and vent the fuel lines after Initially there was sufficient fuel flow to start the diesel, then the air reached the injectors and the diesel rpm dropped.
After the fuel line had purged itself of air, excess fuel was injected into the cylinders because of the governor position.Unburned excess fuel was carried into the exhaust system and subsequently ignited.The diesel exhaust silencer relief device lifted per its intended function.Therefore, the additional time required to purge the fuel system of air adversely impaired the diesel generator's ability to achieve the required voltage in 10 seconds.This was the first valid test failure in the last 100 valid tests.The diesel generator was unavailable for approximately 39 hours and 8 minutes (including the maintenance outage).The current surveillance test interval is 31 days.This conforms with the schedule of Regulatory Position C.2.d of Regulatory Guide 1.108, Revision 1, August 1977.Corrective Actions'.Maintenance Bulletins have be'en distributed to the Units 1, 2, and 3 Maintenance and Work Control Groups to advise them to vent and refill the fuel oil system whenever work is performed whi.ch could affect the fuel oil system.2.PVNGS Engineering has advised Units 1, 2, and 3 Operations to conduct maintenance starts following significant fuel oil system or governor control maintenance activities.
The diesel speed governor responded to the decreasing rpm by moving the fuel racks in the more fuel direction. After the fuel line had purged itself of air, excess fuel was injected into the cylinders because of the governor position. Unburned excess fuel was carried into the exhaust system and subsequently ignited. The diesel exhaust silencer relief device lifted per its intended function. Therefore, the additional time required to purge the fuel system of air adversely impaired the diesel generator's             ability to achieve the required voltage in 10 seconds.
3.Diesel Generator maintenance and retest procedures will be reviewed and revised as required to implemen't corrective actions 1 and 2.Any required procedure changes will be completed by March 29, 1991.}}
This was the first valid test failure in the last 100 valid tests.             The diesel generator was unavailable for approximately 39 hours and 8 minutes (including the maintenance outage). The current surveillance test interval is 31 days. This conforms with the schedule of Regulatory Position C.2.d of Regulatory Guide 1.108, Revision 1, August 1977.
Corrective   Actions'.
Maintenance Bulletins have be'en distributed to the Units 1, 2, and 3 Maintenance and Work Control Groups to advise them to vent and refill           the fuel oil system whenever work is performed whi.ch could affect the fuel oil system.
: 2. PVNGS Engineering has advised Units 1, 2, and 3 Operations to conduct maintenance starts following significant fuel oil system or governor control maintenance activities.
: 3. Diesel Generator maintenance and retest procedures will be reviewed and revised as required to implemen't corrective actions 1 and 2.
Any required procedure changes will be completed by March 29, 1991.}}

Latest revision as of 10:21, 29 October 2019

Special Rept 2-SR-90-007:on 901212,diesel Generator Valid Test Failure Occurred.Caused by Air in Diesel Generator Fuel Lines.Maint Bulletins Distributed to Plant Maint & Work Control Groups
ML17305B315
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/10/1991
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00709-JML-T, 192-709-JML-T, 2-SR-90-007, 2-SR-90-7, NUDOCS 9101160255
Download: ML17305B315 (6)


Text

ACCELERATED DEMONS'IIB TION SYSTEM

/ATTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9101160255 DOC.DATE: 91/01/10 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME . RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 2-SR-90-007:on 901212,diesel generator valid test failure. Caused by air in diesel generator fuel lines.

Maint bulletins distributed to plant maint 6 work control groups. D DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000529 RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 TRMIELL,C 1 D

1 TRAMMELL,C. 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB11 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB SD 1 1 NRR/DST/SICB 7E 1 1 NRR/DRAT SPLBSD1 1 1 NRR/DST/SRXB 8E 1 1 1 1 RES/DSIR/EIB 1 1 RG F~ 1 1 EXTERNAL: EGGG BRYCE,J.H 3 3 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 NUDOCS FULL TXT 1 1 NOTES: 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 35 ENCL 35

il Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX. ARIZONA85072-2034 192-00709-JML/TRB/RKR JAMES M. LEVINE VICE PRESIDENT January 10, 1991 NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 .(License No. NPF-51)

Special Report 2-SR-90-007 File: 91-020-404 Attached please find Special Report 2-SR-90-007 prepared and submitted pursuant to Technical Specifications 4.8.1.1.3 and 6.9.2. This report discusses the Unit 2 "A" diesel generator valid test failure.

If you have any questions, please contact T. R. Bradish, Compliance Manager at (602) 393-2521.

Very truly yours, JML/TRB/RKR/dmn Attachment cc: W. F. Conway (all with attachment)

J. B. Martin D. H. Coe A. C. Gehr A. H. Gutterman 9101i60255 910ii0 PDR ADOCK 05000529 PDR r~,>

PALO VERDE NUCLEAR GENERATING STATION UNIT 2 Diesel Generator Valid Test Failure December 12, 1990 License No. NPF-51 Docket No. 50-529 Special Report 2-SR-90-007 Initial Conditions'n December 12, 1990 at approximately 0124 MST, Palo Verde Unit 2 was in MODE 1 (POWER OPERATION) at 100 percent power.

Descri tion o Event This Special Report is being submitted pursuant to Technical Specifications (TS) 4.8.1.1.3 and 6.9.2 and contains the information

'recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977 for a diesel generator valid test failure.

At approximately 0500 MST on December 11, 1990, the Unit 2 "A" diesel generator was declared inoperable and taken out of service for preplanned maintenance. This included replacement of the fuel oil line from the engine mounted fuel oil head tank to the left bank supply header to correct minor fitting leakage. At approximately 2145 MST on December ll, 1990, maintenance work was completed and preparations were made to perform the surveillance test to verify diesel generator operability.

At approximately 0124 MST on December 12, 1990, the "A" diesel generator was started in accordance with an approved procedure to perform the monthly TS surveillance. It took approximately 10.9 seconds after initiating the diesel start for the generator voltage to reach the minimum acceptance voltage of 3740 volts. The observed generator frequency initially approached 60 Hz, but then dropped, returning to 60 Hz within 10 seconds after initiating the start. TS 4.8.1.1 2 requires

~

that the diesel generator be demonstrated OPERABLE by verifying that the diesel generator can start and accelerate to generator voltage and frequency at 4160 + 420 volts and 60 + 1.2 Hz in less than or equal to 10 seconds. Therefore, this was a diesel generator valid test failure.

Concurrent with the diesel generator start, a loud bang was heard in the Control Room. The diesel continued to idle normally and was manually tripped approximately 5 minutes after starting. An investigation of the noise found that the relief device on the diesel generator exhaust silencer had lifted. The diesel generator was inspected for damage and rolled on starting air. The inspections included a visual inspection of valve train components, video probe examination of the turbocharger, and a visual inspection of the exhaust silencer internals. No abnormalities were noted during these inspections and there was no indication of

damage to the diesel generator. At approximately 1505 MST on Decemb'er 12, 1990 the diesel generator was started and ran successfully during trouble shooting. At approximately 2008 MST on December 12, 1990, the diesel generator was successfully tested and returned to OPERABLE status.

Cause o Event' preliminary investigation determined that the cause of the valid test failure was air in the diesel generator fuel lines. There were no administrative requirements to maintenance.

fill and vent the fuel lines after Initially there was sufficient fuel flow to start the diesel, then the air reached the injectors and the diesel rpm dropped.

The diesel speed governor responded to the decreasing rpm by moving the fuel racks in the more fuel direction. After the fuel line had purged itself of air, excess fuel was injected into the cylinders because of the governor position. Unburned excess fuel was carried into the exhaust system and subsequently ignited. The diesel exhaust silencer relief device lifted per its intended function. Therefore, the additional time required to purge the fuel system of air adversely impaired the diesel generator's ability to achieve the required voltage in 10 seconds.

This was the first valid test failure in the last 100 valid tests. The diesel generator was unavailable for approximately 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> and 8 minutes (including the maintenance outage). The current surveillance test interval is 31 days. This conforms with the schedule of Regulatory Position C.2.d of Regulatory Guide 1.108, Revision 1, August 1977.

Corrective Actions'.

Maintenance Bulletins have be'en distributed to the Units 1, 2, and 3 Maintenance and Work Control Groups to advise them to vent and refill the fuel oil system whenever work is performed whi.ch could affect the fuel oil system.

2. PVNGS Engineering has advised Units 1, 2, and 3 Operations to conduct maintenance starts following significant fuel oil system or governor control maintenance activities.
3. Diesel Generator maintenance and retest procedures will be reviewed and revised as required to implemen't corrective actions 1 and 2.

Any required procedure changes will be completed by March 29, 1991.