Virginia Electrie and Power Cowarv          NPF-4 North Anna Pc-er Station. Unit 1                      79 AFR25 A 8., 32 Decket No. 50- E8 24 Hcur Reportable Event Written Folicw-Up Event:    Transfer Bus Overloads LER/R0 79-057/01T-0 Cn 4/24/79, tra Station Personcel at North Anna Pcuer Station were informed of a potential for an overicad condition en the Station Transfer Bus. As a result of a review of the electrical require:wnts during cc.rbine unit aperation of Units 1 and 2. the 4160 volt transfer bus and transfer tus feeder breakers are not capable of continually carrying full load current for certain canditions. For example, if Unit 1 was cperating and Unit 2 was in the prccess of startira up, the additional load on the transfer bus if Unit I were to trip would result in an overload of the above mentioned ccepo-nents.    'This overicad would not result in an 1:arediate trip, but wculd result in heating up the transfer bus ctmponents.
This conditica is believed to be due to imprcper sizing of transfer bus equi rcent.
Since Unit 1 is in Cold Shutdown, this event had no effect on plant status.
Presently a ceans of limiting the transfer bus leads is being considered and analysis of a final solution is teing pursued.
                                                        'I L P. O'REltty
                                                          'N
                                                          ' a u. eramar 8 1 CNEN:EV1
: 3. s. nsu i  L L tcts
                                                            & E Appwr i
L 7. **ttwe Teleccpiad:            Date:                      ,      K. v. m
: u. m,
                  . Time:                                <-s < ~
Adp/
By:
Veri fied:            By:                                        -
                    ,
                  '
2325 132 a
b._D W L u 6 J u u cdu d \Ju Yib Q
                                                                                        %0 t
                      .
t l                                              ?9001 d oq7g}}

Revision as of 19:07, 27 October 2019

RO 79-057/01T-0 on 790424:potential Overload exists;4,160 Volt Transfer Bus & Feeder Breakers Are Not Capable of Continually Carrying Full Load Current.Caused by Improper Sizing of Transfer Bus Equipment
ML19270G653
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/25/1979
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
NUDOCS 7906140475
Download: ML19270G653 (1)


Text

.,

4

' -

l i , ? Z ... : -

Virginia Electrie and Power Cowarv NPF-4 North Anna Pc-er Station. Unit 1 79 AFR25 A 8., 32 Decket No. 50- E8 24 Hcur Reportable Event Written Folicw-Up Event: Transfer Bus Overloads LER/R0 79-057/01T-0 Cn 4/24/79, tra Station Personcel at North Anna Pcuer Station were informed of a potential for an overicad condition en the Station Transfer Bus. As a result of a review of the electrical require:wnts during cc.rbine unit aperation of Units 1 and 2. the 4160 volt transfer bus and transfer tus feeder breakers are not capable of continually carrying full load current for certain canditions. For example, if Unit 1 was cperating and Unit 2 was in the prccess of startira up, the additional load on the transfer bus if Unit I were to trip would result in an overload of the above mentioned ccepo-nents. 'This overicad would not result in an 1:arediate trip, but wculd result in heating up the transfer bus ctmponents.

This conditica is believed to be due to imprcper sizing of transfer bus equi rcent.

Since Unit 1 is in Cold Shutdown, this event had no effect on plant status.

Presently a ceans of limiting the transfer bus leads is being considered and analysis of a final solution is teing pursued.

'I L P. O'REltty

'N

' a u. eramar 8 1 CNEN:EV1

3. s. nsu i L L tcts

& E Appwr i

L 7. **ttwe Teleccpiad: Date: , K. v. m

u. m,

. Time: <-s < ~

Adp/

By:

Veri fied: By: -

,

'

2325 132 a

b._D W L u 6 J u u cdu d \Ju Yib Q

%0 t

.

t l ?9001 d oq7g