ML19257A343
| ML19257A343 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/12/1979 |
| From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19257A338 | List: |
| References | |
| IEB-79-14, NUDOCS 8001030786 | |
| Download: ML19257A343 (1) | |
Text
-.
... -... - - ~ _ -
Vi*britoElectric and Ebecer CcmYp'I i
N6 Anno _ Fbtaer Station u.n NPF-4.
bcct<et Mo.
j d
24 Hour Reporba.ble EQen c Wr% ten Folloca-LLp Event: Non-ConGormance in Piae Su.pport besgn LER/RO YH5'7/o" t -O buring reiteO 09 seisrrGc ono.gses 9er as-bu' so9eth Yel keCl P P ncg. sgstems (IEB '19-14)
Ii Stone L WeEster discoverecY the pipe stress on iine 1 y2-RC-105-1502-Gd to be CVer Code
~
1 Loma.oie cue to incorrect va We coetghts u.se in pipe support cohet.dations.
The 3robhern is presenMg u.nder rev'teo b g ncyneering.
There has 'oeen no emet on the piant o.s o.
-esult c6 this discrepancg.
're-evcducked c.nd o The pipe support col L bes clck*cnal_ snubber oitlh be jnstcdied on the hinc 3here ryred.
The urnt is present\\
eGu.elig shuidc<cq. g 'in Mode 5 9enotchg o.
1671 298 8001030
,/fC