RO 79-057/01T-0 on 790424:potential Overload exists;4,160 Volt Transfer Bus & Feeder Breakers Are Not Capable of Continually Carrying Full Load Current.Caused by Improper Sizing of Transfer Bus Equipment
ML19270G653
Person / Time
Site: North Anna 
Issue date: 04/25/1979
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
NUDOCS 7906140475
Download: ML19270G653 (1)


Text

.,

4

l i, ? Z... : -

Virginia Electrie and Power Cowarv North Anna Pc-er Station. Unit 1 NPF-4 79 AFR25 A 8., 32 Decket No. 50- E8 24 Hcur Reportable Event Written Folicw-Up Event:

Transfer Bus Overloads LER/R0 79-057/01T-0 Cn 4/24/79, tra Station Personcel at North Anna Pcuer Station were informed of a potential for an overicad condition en the Station Transfer As a result of a review of the electrical require:wnts during cc.rbine Bus.

unit aperation of Units 1 and 2. the 4160 volt transfer bus and transfer tus feeder breakers are not capable of continually carrying full load current For example, if Unit 1 was cperating and Unit 2 was for certain canditions.

in the prccess of startira up, the additional load on the transfer bus if Unit I were to trip would result in an overload of the above mentioned ccepo-

'This overicad would not result in an 1:arediate trip, but wculd result nents.

in heating up the transfer bus ctmponents.

This conditica is believed to be due to imprcper sizing of transfer bus equi rcent.

Since Unit 1 is in Cold Shutdown, this event had no effect on plant status.

Presently a ceans of limiting the transfer bus leads is being considered and analysis of a final solution is teing pursued.

'I L P. O'REltty

'N

' a u. eramar 8 1 CNEN:EV1

3. s. nsu L L tcts i & E Appwr L 7. **ttwe i

Teleccpiad:

Date:

K. v. m

u. m,

. Time:

<-s < ~

Adp/

By:

Veri fied:

By:

2325 132 a

b._D W L u 6 J u u cdu d \\Ju Yib Q %0 t

t l

?9001 d oq7g