Virginia Electric and Fcher Capany 1ortn Anns P:'ar Staticn, Unit 91 NFF-4 a
Decket b. EO-330 f
24 Mcur Reportable Event
[1 licitten Follt.w-Up h
3 Event:
Iccorrect f aisnic Respensa spectru Cur.e Used d
in a Pips Stress Analysis LER/60 79-15)/01T-0
$i During 'the revi(w of valve keights in cen[urcticn with the as-tuilt' reviu of IE Eulletin 79-14, it was discovered that an incorrect geisnic respcase i
specteta curva nxd been used in a pipe strass analysis.
Review of the selmic i
input to other stress prcblic.s ra,realed that sc a othar seis,.ic curve:; had ust.d the wrcng input for:.at.
.The cause of this discrepancy is r.ot knc n at this tiu.
An investigstion of tre extent of tta problen is in prcgrass.
This in w -
tigaticn has sit. n that sc a of the strass analyses for ec Eccur.t ccaling. suc...
kater, ar.d other safety related systa. s used incorrect seistiic f nput whicn eculd have yieldad ir.ccnservative pipa stresses pipe support loads, ar.d equip. ant im Ncne cf the deficier.cias founo were 1ccated in the contaire, ant tu11dico n.n e
kere any a part of the reactor ecolant pressure tcundsry.
Cr.e of the strets analyses in tt:e Auxiliary Euildir.g has tun run with the correct seliale curva and resultad in a calculated pipe stress atove the allcatie stated in the FDn.
The unit is presently in a refueling shutdt,wn r.cds.
I U
Cc O
Ii2 a s,P.01g uY C *g Ao cn a g, g. UP#GW
- t. _
3,9.CHEMDES O
. s, a, **
T d
i i
& k WG g, putMff t, suTMM
'U i
g f,, -
ll E Y C
cr:
s J
0 q
r 6
' " ~ ~ ~
d'
~-
8001030 C/6 3
.