ML18011A480: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI TRIBUTION DEMONS"N.r TION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9406220003 DOC.DATE: 9&~NOTARIZED:
{{#Wiki_filter:DI TRIBUTION DEMONS                       TION SYSTEM ACCELERATED "N.r REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFlLIATION ROGERS,S.Carolina Power 6 Light Co.ROBXNSON,W.R.
ACCESSION NBR:9406220003               DOC.DATE:   9&~       NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET g 05000400 AUTH. NAME             AUTHOR AFFlLIATION ROGERS,S.             Carolina Power         6   Light Co.
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000400
ROBXNSON,W.R.         Carolina Power         6   Light Co.
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS~~~I-~0 1 EXTERNAL: EGGG BRYCE, J.H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DSP/TPAB NRR/DRXL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept                   ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 0'
DISTRIBUTION CODE: IE24D             COPIES RECEIVED:LTR       l ENCL   t SIZE:
Carolina Power&Light Company PO Box 165 New Hill NC 27562 JUN 3 4 1994 File: HO-941044 William R.Robinson Vice President Harris Nuclear Plant Serial HNP-94-049 United States Nuclear Regulatory Commission Attention:
TITLE: Monthly Operating Report (per Tech Specs)
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO-;NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:
NOTES:Application for permit renewal filed.                                         05000400 RECIPIENT               COPIES            RECIPIENT        COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL PD2-1 PD                     1      1      LE,N                  1    1 INTERNAL: ACRS                           10    10      AEOD/DSP/TPAB        1    1
In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.Sincerely, W.R.Robinson SGR:smh Enclosure c: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRR)Mr.J.E.Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR 2003.>6 State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO RUN DATE 06/02/94 RUN TIME 15s08s51 PLANT PERFORMANCE DATA SYSTEM OPERATZNG DATA REPORT HARRIS UNIT 1 PACE RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOTES 1.UNIT NAMEs HARRIS UNIT 1 2.REPORTING PERZODs MAY 94 3.LICENSED THERMAL POWER (MWT): 277S 4.NAMEPLATE RATING (GROSS KK)s 950.9 5.DESIGN ELECTRICAL RATING (NET MWE)s 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE)s 920.0 7.MAX DEs>BNQABLN CAP>sCZTY (NET MQE)s 860.0 8.IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS s 9.POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE)s, 10.REASONS FOR RESTRICTION ZF ANYs THIS MONTH YR TO DATE CUMUL ATZVE 11.HOURS IN REPORTZNC PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13~REACTOR RESERVE SHUTDOWN HRS 14.HOURS CENERATOR ON LIlK 1S.UNIT RESERVE SHUTDOWN HOURS 16~CROSS THERMAL ENERCY CEN.(MWH)17.CROSS ELEC.ElKRCY CEN.(MWH)18.NET ELEC.ENERGY CENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNZ'V>>ss'.I-FTY'FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 508.87.00 467.58.00 1134158.04 372461.00 338177.00 62.85 62.85 52.85 50.50.00 (TYPE>DATE, 3623 F 00 2358'0.00 2317.13.00 6202358.10 2080982.00 1926696,00 63.96 63.96 61.84 59.09.00 AND DURATION 62088.00 50661.01.00 50094.76.00 133461012.
        ~~~I-~               01 1
06 44515203.00 41460093.00 80.68 80'8 77'5 74.20 3.19 OF EACH)s 25.ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16-9 1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM~RUN DATE 06/02/94 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 15:08)51'ARRIS UNIT 1 PAGE 1 RPD39-000 DOCEET NO.050-400 COMPLETED BY SHEILA ROGERS'ELEPHONE (919)362"2573 1994 DAY AVG.DAILY PONER LEVEL (WE-NET)DAY AVG.DAILY POMER LEVEL (WE-NET)-12 17 812-22 18 823-26 19 840 32 20 869-34 21 873-36~22 867-37 23 863-38 24 855-37 25 853 10-37 26 852-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16-8 MIS/MTH-OPR.RPT/3/OS4 x CO I O y 0 CO UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1994 DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S.G.Rogers TELEPHONE:
1 1
(919)362-2573 NUMBER 94-007 DATE TYPE'40319 DURATION (HOURS)276.42 REASON'ETHOD OF SHUTTING DOWN REACTORs LICENSEE EVENT REPORT 0 N/A SYSTEM CODE 4 Zz COMPONENT CODE 5 ZZZZZZ CAUSE A CORRECTIVE ACTION TO PREVENT RECURRENCE Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No.5.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Corrective action to prevent recurrence as per the Licensee Event Report.3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit 1-Same Source~cn lr1 CD g~, 0 CD$D~0 o Z~~'p~0 C)  
1 NRR/DRXL/RPEB RGN2 1
~gC UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1994 DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S.G.Rogers TELEPHONE:
1 1
(919)362-2573 NUMBER DATE TYPE'URATION (HOURS)REASON METHOD OF SHUTTING DOWN REACTORs LICENSEE EVENT REPORT 4 SYSTEM CODE 4 COMPONENT CAUSE&CORRECTIVE CODE 5 ACTION TO PREVENT RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Corrective action to prevent recurrence as per the Licensee Event Report.3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data-Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit I-Same Source~cn Irl CD A SO o Z~0 C)}}
1 EXTERNAL: EGGG BRYCE, J. H                1     1     NRC PDR              1     1 NSIC                          1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 20   ENCL   20
 
0' Carolina Power & Light Company                                             William R. Robinson PO Box 165                                                                 Vice President New Hill NC 27562                                                         Harris Nuclear Plant JUN   3   4 1994 File: HO-941044                                                               Serial HNP-94-049 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO-; NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:
In accordance     with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.
Sincerely, W. R. Robinson SGR:smh Enclosure c:       Mr. S. D. Ebneter (NRC-RII)
Mr. N. B. Le (NRR)
Mr. J. E. Tedrow (NRC-SHNPP) 9406220003 940531 PDR     ADOCK 05000400 R             ,         PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 2003.> 6
 
Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO                         PLANT PERFORMANCE DATA SYSTEM                      PACE RUN DATE    06/02/94                 OPERATZNG DATA REPORT                          RPD36-000 RUN TIME   15s08s51                   HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                            TELEPHONE   (919)362-2573
: 1. UNIT NAMEs     HARRIS UNIT 1                         NOTES
: 2. REPORTING PERZODs MAY             94
: 3. LICENSED THERMAL POWER (MWT): 277S
: 4. NAMEPLATE RATING (GROSS KK) s 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE) s 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE) s 920.0
: 7. MAX DEs>BNQABLN CAP>sCZTY (NET MQE) s 860.0
: 8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS           3 THRU   7) SINCE LAST   REPORT, GIVE REASONS   s
: 9. POWER LEVEL TO WHICH RESTRICTED       IP ANY (NET MWE) s,
: 10. REASONS FOR RESTRICTION ZF ANYs THIS         YR TO         CUMUL MONTH            DATE         ATZVE
: 11. HOURS IN REPORTZNC PERIOD                       744.00          3623 00 F        62088.00
: 12. NUMBER OF HOURS REACTOR       CRITICAL           508.87          2358 '0        50661.01 13 ~ REACTOR RESERVE SHUTDOWN HRS                         .00              .00            .00
: 14. HOURS CENERATOR ON      LIlK                    467.58          2317. 13      50094.76 1S. UNIT RESERVE       SHUTDOWN HOURS                     .00              .00            .00 16 ~ CROSS THERMAL ENERCY CEN. (MWH)             1134158. 04      6202358.10    133461012. 06
: 17. CROSS ELEC. ElKRCY CEN. (MWH)                 372461. 00    2080982.00      44515203.00
: 18. NET ELEC. ENERGY CENERATED (MWH)               338177. 00    1926696,00      41460093. 00
: 19. UNIT SERVICE FACTOR                               62.85            63.96          80.68
: 20. UNZ 'V > > ss'.I- FTY'FACTOR                     62.85            63.96          80 '8
: 21. UNIT CAP. FACTOR (USING MDC NET)                   52.85            61. 84          77 '5
: 22. UNIT CAP. FACTOR (USING DER NET)                   50.50            59. 09          74.20
: 23. UNIT FORCED OUTAGE RATE                               .00              .00            3.19
: 24. SHUTDOWNS SCHED.     OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH) s
: 25. ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16  -  9
 
1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO                    PLANT PERFORMANCE DATA SYSTEM        ~          PAGE          1
                                            -
RUN DATE RUN 06/02/94 TIME 15:08)51    'ARRIS APPENDIX B    AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573    'ELEPHONE 1994 DAY  AVG. DAILY PONER LEVEL        DAY    AVG. DAILY POMER LEVEL (WE-NET)                              (WE-NET)
                          -12                    17              812
                          -22                  18              823
                          -26                  19              840 32                  20               869
                          -34                  21              873
                          -36            ~
22              867
                          -37                  23              863
                          -38                  24              855
                          -37                  25              853 10              -37                  26               852
                          -39                  27              863 12                20                  28              867 13              154                  29              862 14              243                  30              859 15              573                  31              859 16              636 1.16 - 8 MIS/MTH-OPR.RPT/3/OS4
 
x CO UNIT SHUTDOWNS AND POWER REDUCTION                    DOCKET NO.:                   050400 I
O                                                                                                                    UNIT NAME:                      Harris y                                                                                                                    DATE:                    June I, 1994 COMPLETED BY:            S. G. Rogers TELEPHONE:            (919) 362-2573 0
CO REPORT MONTH: MAY 1994 NUMBER          DATE                      DURATION        REASON'ETHOD OF          LICENSEE      SYSTEM  COMPONENT      CAUSE A CORRECTIVE (HOURS)                     SHUTTING    EVENT        CODE 4  CODE 5              ACTION TO TYPE'40319 DOWN    REPORT 0                                      PREVENT REACTORs                                              RECURRENCE 94-007                                    276.42                                    N/A          Zz    ZZZZZZ      Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No. 5.
1                              2                                                        3                            4 F: Forced                      Reason:                                                Method:                      Exhibit G-Instructions S: Scheduled                    A-Equipment Failure (Explain)                          1-Manual                    for Preparation of Data B-Maintenance or Test                                  2-Manual Scram              Entry Sheets for Licensee Event C-Refueling                                            3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                4-Continued                  (NUREG4161)
E-Operator Training & License Examination              5-Reduced Load F-Administrative                                        6-Other                      5
                                                                                                                                                            ~  cn lr1 CD G-Operational Error (Explain)                                                       Exhibit 1 - Same Source              g ~,  0 H-Other (Explain)
CD
                                                                                                                                                                ~
                                                                                                                                                                $ D 0 o  Z~
                                                                                                                                                            ~'p~
Corrective action to prevent recurrence as per the Licensee Event Report.                                                                                0 C)
 
~ gC UNIT SHUTDOWNS AND POWER REDUCTION                    DOCKET NO.:                    050400 UNIT NAME:                      Harris DATE:                      June I, 1994 COMPLETED BY:            S. G. Rogers TELEPHONE:             (919) 362-2573 REPORT MONTH: MAY 1994 NUMBER          DATE          TYPE'URATION              REASON        METHOD OF  LICENSEE      SYSTEM  COMPONENT      CAUSE & CORRECTIVE (HOURS)                     SHUTTING    EVENT        CODE 4  CODE 5              ACTION TO DOWN    REPORT 4                                      PREVENT REACTORs                                              RECURRENCE 94408        940512                        0.0                                    N/A          zz                  Physics and Tech Spec Surveillance testing required following Refueling Outage.
1                              2                                                      3                           4 F: Forced                      Reason:                                                Method:                      Exhibit G-Instructions S: Scheduled                    A-Equipment Failure (Explain)                          1-Manual                    for Preparation of Data B-Maintenance or Test                                  2-Manual Scram              Entry Sheets for Licensee Event C-Refueling                                            3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                4-Continued                  (NUREG4161)
                                                                                                                                                          ~ cn CD Irl E-Operator Training & License Examination              5-Reduced Load                                                    A SO F-Administrative                                        6-Other                      5 G-Operational Error (Explain)
H-Other (Explain)
Exhibit I - Same Source o Z~
0 Corrective action to prevent recurrence as per the Licensee Event Report.                                                                          C)}}

Revision as of 05:15, 22 October 2019

Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant.W/940614 Ltr
ML18011A480
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-049, HNP-94-49, NUDOCS 9406220003
Download: ML18011A480 (8)


Text

DI TRIBUTION DEMONS TION SYSTEM ACCELERATED "N.r REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406220003 DOC.DATE: 9&~ NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET g 05000400 AUTH. NAME AUTHOR AFFlLIATION ROGERS,S. Carolina Power 6 Light Co.

ROBXNSON,W.R. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DSP/TPAB 1 1

~~~I-~ 01 1

1 1

1 NRR/DRXL/RPEB RGN2 1

1 1

1 EXTERNAL: EGGG BRYCE, J. H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

0' Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 3 4 1994 File: HO-941044 Serial HNP-94-049 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO-; NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.

Sincerely, W. R. Robinson SGR:smh Enclosure c: Mr. S. D. Ebneter (NRC-RII)

Mr. N. B. Le (NRR)

Mr. J. E. Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 2003.> 6

Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO PLANT PERFORMANCE DATA SYSTEM PACE RUN DATE 06/02/94 OPERATZNG DATA REPORT RPD36-000 RUN TIME 15s08s51 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAMEs HARRIS UNIT 1 NOTES
2. REPORTING PERZODs MAY 94
3. LICENSED THERMAL POWER (MWT): 277S
4. NAMEPLATE RATING (GROSS KK) s 950.9
5. DESIGN ELECTRICAL RATING (NET MWE) s 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) s 920.0
7. MAX DEs>BNQABLN CAP>sCZTY (NET MQE) s 860.0
8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS s
9. POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE) s,
10. REASONS FOR RESTRICTION ZF ANYs THIS YR TO CUMUL MONTH DATE ATZVE
11. HOURS IN REPORTZNC PERIOD 744.00 3623 00 F 62088.00
12. NUMBER OF HOURS REACTOR CRITICAL 508.87 2358 '0 50661.01 13 ~ REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS CENERATOR ON LIlK 467.58 2317. 13 50094.76 1S. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 16 ~ CROSS THERMAL ENERCY CEN. (MWH) 1134158. 04 6202358.10 133461012. 06
17. CROSS ELEC. ElKRCY CEN. (MWH) 372461. 00 2080982.00 44515203.00
18. NET ELEC. ENERGY CENERATED (MWH) 338177. 00 1926696,00 41460093. 00
19. UNIT SERVICE FACTOR 62.85 63.96 80.68
20. UNZ 'V > > ss'.I- FTY'FACTOR 62.85 63.96 80 '8
21. UNIT CAP. FACTOR (USING MDC NET) 52.85 61. 84 77 '5
22. UNIT CAP. FACTOR (USING DER NET) 50.50 59. 09 74.20
23. UNIT FORCED OUTAGE RATE .00 .00 3.19
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH) s
25. ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16 - 9

1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM ~ PAGE 1

-

RUN DATE RUN 06/02/94 TIME 15:08)51 'ARRIS APPENDIX B AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573 'ELEPHONE 1994 DAY AVG. DAILY PONER LEVEL DAY AVG. DAILY POMER LEVEL (WE-NET) (WE-NET)

-12 17 812

-22 18 823

-26 19 840 32 20 869

-34 21 873

-36 ~

22 867

-37 23 863

-38 24 855

-37 25 853 10 -37 26 852

-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16 - 8 MIS/MTH-OPR.RPT/3/OS4

x CO UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 I

O UNIT NAME: Harris y DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 0

CO REPORT MONTH: MAY 1994 NUMBER DATE DURATION REASON'ETHOD OF LICENSEE SYSTEM COMPONENT CAUSE A CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO TYPE'40319 DOWN REPORT 0 PREVENT REACTORs RECURRENCE 94-007 276.42 N/A Zz ZZZZZZ Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No. 5.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

~ cn lr1 CD G-Operational Error (Explain) Exhibit 1 - Same Source g ~, 0 H-Other (Explain)

CD

~

$ D 0 o Z~

~'p~

Corrective action to prevent recurrence as per the Licensee Event Report. 0 C)

~ gC UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: MAY 1994 NUMBER DATE TYPE'URATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO DOWN REPORT 4 PREVENT REACTORs RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)

~ cn CD Irl E-Operator Training & License Examination 5-Reduced Load A SO F-Administrative 6-Other 5 G-Operational Error (Explain)

H-Other (Explain)

Exhibit I - Same Source o Z~

0 Corrective action to prevent recurrence as per the Licensee Event Report. C)