ML18011A480: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:DI TRIBUTION DEMONS TION SYSTEM ACCELERATED "N.r REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFlLIATION ROGERS,S.Carolina Power 6 Light Co.ROBXNSON,W.R. | ACCESSION NBR:9406220003 DOC.DATE: 9&~ NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET g 05000400 AUTH. NAME AUTHOR AFFlLIATION ROGERS,S. Carolina Power 6 Light Co. | ||
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION | ROBXNSON,W.R. Carolina Power 6 Light Co. | ||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS | Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr. | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE: | ||
Carolina Power&Light Company PO Box 165 New Hill NC 27562 JUN 3 4 1994 File: HO-941044 | TITLE: Monthly Operating Report (per Tech Specs) | ||
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO-;NPF-63 MONTHLY OPERATIONS REPORT Gentlemen: | NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DSP/TPAB 1 1 | ||
In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.Sincerely, W.R.Robinson SGR:smh Enclosure c: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRR)Mr.J.E.Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR | ~~~I-~ 01 1 | ||
1 1 | |||
( | 1 NRR/DRXL/RPEB RGN2 1 | ||
1 1 | |||
1 EXTERNAL: EGGG BRYCE, J. H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 | |||
0' Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 3 4 1994 File: HO-941044 Serial HNP-94-049 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO-; NPF-63 MONTHLY OPERATIONS REPORT Gentlemen: | |||
In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994. | |||
Sincerely, W. R. Robinson SGR:smh Enclosure c: Mr. S. D. Ebneter (NRC-RII) | |||
Mr. N. B. Le (NRR) | |||
Mr. J. E. Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 2003.> 6 | |||
Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO PLANT PERFORMANCE DATA SYSTEM PACE RUN DATE 06/02/94 OPERATZNG DATA REPORT RPD36-000 RUN TIME 15s08s51 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573 | |||
: 1. UNIT NAMEs HARRIS UNIT 1 NOTES | |||
: 2. REPORTING PERZODs MAY 94 | |||
: 3. LICENSED THERMAL POWER (MWT): 277S | |||
: 4. NAMEPLATE RATING (GROSS KK) s 950.9 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) s 900.0 | |||
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE) s 920.0 | |||
: 7. MAX DEs>BNQABLN CAP>sCZTY (NET MQE) s 860.0 | |||
: 8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS s | |||
: 9. POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE) s, | |||
: 10. REASONS FOR RESTRICTION ZF ANYs THIS YR TO CUMUL MONTH DATE ATZVE | |||
: 11. HOURS IN REPORTZNC PERIOD 744.00 3623 00 F 62088.00 | |||
: 12. NUMBER OF HOURS REACTOR CRITICAL 508.87 2358 '0 50661.01 13 ~ REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 | |||
: 14. HOURS CENERATOR ON LIlK 467.58 2317. 13 50094.76 1S. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 16 ~ CROSS THERMAL ENERCY CEN. (MWH) 1134158. 04 6202358.10 133461012. 06 | |||
: 17. CROSS ELEC. ElKRCY CEN. (MWH) 372461. 00 2080982.00 44515203.00 | |||
: 18. NET ELEC. ENERGY CENERATED (MWH) 338177. 00 1926696,00 41460093. 00 | |||
: 19. UNIT SERVICE FACTOR 62.85 63.96 80.68 | |||
: 20. UNZ 'V > > ss'.I- FTY'FACTOR 62.85 63.96 80 '8 | |||
: 21. UNIT CAP. FACTOR (USING MDC NET) 52.85 61. 84 77 '5 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) 50.50 59. 09 74.20 | |||
: 23. UNIT FORCED OUTAGE RATE .00 .00 3.19 | |||
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH) s | |||
: 25. ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16 - 9 | |||
1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM ~ PAGE 1 | |||
- | |||
RUN DATE RUN 06/02/94 TIME 15:08)51 'ARRIS APPENDIX B AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573 'ELEPHONE 1994 DAY AVG. DAILY PONER LEVEL DAY AVG. DAILY POMER LEVEL (WE-NET) (WE-NET) | |||
-12 17 812 | |||
-22 18 823 | |||
-26 19 840 32 20 869 | |||
-34 21 873 | |||
-36 ~ | |||
22 867 | |||
-37 23 863 | |||
-38 24 855 | |||
-37 25 853 10 -37 26 852 | |||
-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16 - 8 MIS/MTH-OPR.RPT/3/OS4 | |||
x CO UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 I | |||
O UNIT NAME: Harris y DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 0 | |||
CO REPORT MONTH: MAY 1994 NUMBER DATE DURATION REASON'ETHOD OF LICENSEE SYSTEM COMPONENT CAUSE A CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO TYPE'40319 DOWN REPORT 0 PREVENT REACTORs RECURRENCE 94-007 276.42 N/A Zz ZZZZZZ Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No. 5. | |||
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161) | |||
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 | |||
~ cn lr1 CD G-Operational Error (Explain) Exhibit 1 - Same Source g ~, 0 H-Other (Explain) | |||
CD | |||
~ | |||
$ D 0 o Z~ | |||
~'p~ | |||
Corrective action to prevent recurrence as per the Licensee Event Report. 0 C) | |||
~ gC UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: MAY 1994 NUMBER DATE TYPE'URATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO DOWN REPORT 4 PREVENT REACTORs RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage. | |||
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161) | |||
~ cn CD Irl E-Operator Training & License Examination 5-Reduced Load A SO F-Administrative 6-Other 5 G-Operational Error (Explain) | |||
H-Other (Explain) | |||
Exhibit I - Same Source o Z~ | |||
0 Corrective action to prevent recurrence as per the Licensee Event Report. C)}} |
Revision as of 05:15, 22 October 2019
ML18011A480 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 05/31/1994 |
From: | Robinson W, Shannon Rogers CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HNP-94-049, HNP-94-49, NUDOCS 9406220003 | |
Download: ML18011A480 (8) | |
Text
DI TRIBUTION DEMONS TION SYSTEM ACCELERATED "N.r REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9406220003 DOC.DATE: 9&~ NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET g 05000400 AUTH. NAME AUTHOR AFFlLIATION ROGERS,S. Carolina Power 6 Light Co.
ROBXNSON,W.R. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DSP/TPAB 1 1
~~~I-~ 01 1
1 1
1 NRR/DRXL/RPEB RGN2 1
1 1
1 EXTERNAL: EGGG BRYCE, J. H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
0' Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 3 4 1994 File: HO-941044 Serial HNP-94-049 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO-; NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.
Sincerely, W. R. Robinson SGR:smh Enclosure c: Mr. S. D. Ebneter (NRC-RII)
Mr. N. B. Le (NRR)
Mr. J. E. Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 2003.> 6
Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO PLANT PERFORMANCE DATA SYSTEM PACE RUN DATE 06/02/94 OPERATZNG DATA REPORT RPD36-000 RUN TIME 15s08s51 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573
- 1. UNIT NAMEs HARRIS UNIT 1 NOTES
- 2. REPORTING PERZODs MAY 94
- 3. LICENSED THERMAL POWER (MWT): 277S
- 4. NAMEPLATE RATING (GROSS KK) s 950.9
- 5. DESIGN ELECTRICAL RATING (NET MWE) s 900.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) s 920.0
- 7. MAX DEs>BNQABLN CAP>sCZTY (NET MQE) s 860.0
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS s
- 9. POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE) s,
- 10. REASONS FOR RESTRICTION ZF ANYs THIS YR TO CUMUL MONTH DATE ATZVE
- 11. HOURS IN REPORTZNC PERIOD 744.00 3623 00 F 62088.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 508.87 2358 '0 50661.01 13 ~ REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS CENERATOR ON LIlK 467.58 2317. 13 50094.76 1S. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 16 ~ CROSS THERMAL ENERCY CEN. (MWH) 1134158. 04 6202358.10 133461012. 06
- 17. CROSS ELEC. ElKRCY CEN. (MWH) 372461. 00 2080982.00 44515203.00
- 18. NET ELEC. ENERGY CENERATED (MWH) 338177. 00 1926696,00 41460093. 00
- 19. UNIT SERVICE FACTOR 62.85 63.96 80.68
- 20. UNZ 'V > > ss'.I- FTY'FACTOR 62.85 63.96 80 '8
- 22. UNIT CAP. FACTOR (USING DER NET) 50.50 59. 09 74.20
- 23. UNIT FORCED OUTAGE RATE .00 .00 3.19
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH) s
- 25. ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16 - 9
1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM ~ PAGE 1
-
RUN DATE RUN 06/02/94 TIME 15:08)51 'ARRIS APPENDIX B AVERAGE DAILY POWER LEVEL UNIT 1 RPD39-000 DOCEET NO. 050-400 COMPLETED BY SHEILA ROGERS (919) 362"2573 'ELEPHONE 1994 DAY AVG. DAILY PONER LEVEL DAY AVG. DAILY POMER LEVEL (WE-NET) (WE-NET)
-12 17 812
-22 18 823
-26 19 840 32 20 869
-34 21 873
-36 ~
22 867
-37 23 863
-38 24 855
-37 25 853 10 -37 26 852
-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16 - 8 MIS/MTH-OPR.RPT/3/OS4
x CO UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 I
O UNIT NAME: Harris y DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 0
CO REPORT MONTH: MAY 1994 NUMBER DATE DURATION REASON'ETHOD OF LICENSEE SYSTEM COMPONENT CAUSE A CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO TYPE'40319 DOWN REPORT 0 PREVENT REACTORs RECURRENCE 94-007 276.42 N/A Zz ZZZZZZ Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No. 5.
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5
~ cn lr1 CD G-Operational Error (Explain) Exhibit 1 - Same Source g ~, 0 H-Other (Explain)
CD
~
$ D 0 o Z~
~'p~
Corrective action to prevent recurrence as per the Licensee Event Report. 0 C)
~ gC UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: MAY 1994 NUMBER DATE TYPE'URATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE (HOURS) SHUTTING EVENT CODE 4 CODE 5 ACTION TO DOWN REPORT 4 PREVENT REACTORs RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage.
1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)
~ cn CD Irl E-Operator Training & License Examination 5-Reduced Load A SO F-Administrative 6-Other 5 G-Operational Error (Explain)
H-Other (Explain)
Exhibit I - Same Source o Z~
0 Corrective action to prevent recurrence as per the Licensee Event Report. C)