ML18016A739: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9812040045 DOC.DATE: 98/11/25 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME ,, AUTHOR AFFILIATION SCAROLA,J; Carolina Power 8 Light Co.RECIP.NAME RECIPIENT AFFILIATION
ACCESSION NBR:9812040045           DOC.DATE: 98/11/25 NOTARIZED: NO                     DOCKET  I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                       05000400 AUTH.NAME       ,,   AUTHOR AFFILIATION SCAROLA,J;             Carolina Power   8 Light Co.
'ecords Management Branch (Document Control Desk)
RECIP.NAME             RECIPIENT AFFILIATION
                          'ecords Management Branch (Document             Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards rev 1 to SHNPP Cycle 9 COLR.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Forwards       rev 1 to SHNPP   Cycle   9 COLR.
General Distribution NOTES:Application for permit renewal filed.DOCKET I 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA'FLANDERS, S COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 1 1 1 1 1 1 1 1 1 0 FILE CENTER NRR DE EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1 1, 1 1 1 1 1 1 EXTERNAL: NOAC NRC PDR D N T NOTE TO ALL MRZDSM RECIPIENTS:
DISTRIBUTION CODE: A001D         COPIES RECEIVED:LTR         ENCL         SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 y+
TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed.                                             05000400 RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME          LTTR ENCL PD2-1 LA                 1     1       PD2-1   PD               1      1
Carolina Power&Ught Company PO Box 165 New Hill NC 27562 James Scarola Vice President Harris Nuclear Plant NOV 25 1998 SERIAL: HNP-98-179 United States Nuclear Regulatory Commission ATTENTION:
          'FLANDERS, S              1     1 INTERNAL: ACRS                       1      1      FILE CENTER              1      1, NRR/DE/ECGB/A             1      1      NRR DE EMCB              1      1 NRR/DRCH/HICB             1      1      NRR/DSSA/SPLB            1     1 NRR/DSSA/SRXB            1      1      NUDOCS-ABSTRACT           1     1 OGC/HDS2                  1     0 EXTERNAL: NOAC                                       NRC PDR D
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 CYCLE 9 CORE OPERATING LIMITS REPORT-REVISION 1  
N T
NOTE TO ALL MRZDSM RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13 y+
 
Carolina Power & Ught Company                                                 James Scarola PO Box 165                                                                   Vice President New Hill NC 27562                                                             Harris Nuclear Plant SERIAL:         HNP-98-179 NOV    25    1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LIMITS REPORT - REVISION                       1


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Technical Specifications (TS)6.9.1.6.4, Carolina Power Ec Light Company (CPAL)hereby submits a mid-cycle revision to the Harris Nuclear Plant (HNP)Cycle 9 Core Operating Limits Report (COLR).Revision 1 to the COLR revises the Movable Incore Detection System operability requirements to specify that at least 44 detector thimbles are required at the beginning of a fuel cycle.This change provides assurance that a potential misloaded core would either be detected or accommodated without fuel failure.Please refer any questions regarding this submittal to Mr.J.H.Eads at (919)362-2646.Sincerely, MSE/mse Attachment c: Mr.J.B.Brady, NRC Sr.Resident Inspector Mr.S.C.Flanders, NRC Project Manager Mr.L.A.Reyes, NRC Regional Administrator 9812040045 98il25 PDR ADOCK 05000400 Pr"'DR v 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095 ATTACHMENT TO HNP-98-179 HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 CYCLE 9 REVISION 1 CORE OPERATING LIMITS REPORT Attachment 9 to HNP Procedure PLP-106,"Technical Specification Equipment List Program and Core Operating Limits Report," Rev.20}}
 
In accordance with Technical Specifications (TS) 6.9.1.6.4, Carolina Power Ec Light Company (CPAL) hereby submits a mid-cycle revision to the Harris Nuclear Plant (HNP) Cycle 9 Core Operating Limits Report (COLR).
Revision 1 to the COLR revises the Movable Incore Detection System operability requirements to specify that at least 44 detector thimbles are required at the beginning of a fuel cycle. This change provides assurance that a potential misloaded core would either be detected or accommodated without fuel failure.
Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.
Sincerely, MSE/mse Attachment c:       Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. S. C. Flanders, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator PDR Pr   "'DR 9812040045 v
ADOCK 98il25 05000400 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095
 
ATTACHMENTTO HNP-98-179 HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 REVISION 1 CORE OPERATING LIMITS REPORT Attachment 9 to HNP Procedure PLP-106, "Technical Specification Equipment List Program and Core Operating Limits Report," Rev. 20}}

Latest revision as of 04:40, 22 October 2019

Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
ML18016A739
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1998
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A740 List:
References
HNP-98-179, NUDOCS 9812040045
Download: ML18016A739 (3)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9812040045 DOC.DATE: 98/11/25 NOTARIZED: NO DOCKET I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME ,, AUTHOR AFFILIATION SCAROLA,J; Carolina Power 8 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

'ecords Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 1 to SHNPP Cycle 9 COLR.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1

'FLANDERS, S 1 1 INTERNAL: ACRS 1 1 FILE CENTER 1 1, NRR/DE/ECGB/A 1 1 NRR DE EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC NRC PDR D

N T

NOTE TO ALL MRZDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 y+

Carolina Power & Ught Company James Scarola PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-98-179 NOV 25 1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LIMITS REPORT - REVISION 1

Dear Sir or Madam:

In accordance with Technical Specifications (TS) 6.9.1.6.4, Carolina Power Ec Light Company (CPAL) hereby submits a mid-cycle revision to the Harris Nuclear Plant (HNP) Cycle 9 Core Operating Limits Report (COLR).

Revision 1 to the COLR revises the Movable Incore Detection System operability requirements to specify that at least 44 detector thimbles are required at the beginning of a fuel cycle. This change provides assurance that a potential misloaded core would either be detected or accommodated without fuel failure.

Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.

Sincerely, MSE/mse Attachment c: Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. S. C. Flanders, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator PDR Pr "'DR 9812040045 v

ADOCK 98il25 05000400 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

ATTACHMENTTO HNP-98-179 HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 REVISION 1 CORE OPERATING LIMITS REPORT Attachment 9 to HNP Procedure PLP-106, "Technical Specification Equipment List Program and Core Operating Limits Report," Rev. 20