ML18192B984: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:To: 00935 US NRC DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 DETROIT EDISON -FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/26/18 PAGE 1 DTC TMTRM Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status TRM VOL I 112 1 IR 06/26/18 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
{{#Wiki_filter:DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/26/18 To: 00935 US NRC                                                         PAGE    1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt  Issue DTC     Doc. Serial Number             Page Rev Copies Lvl Date   Sec Status TMTRM  TRM VOL I                           112   1   IR 06/26/18     AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/0 Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Detroit Edison EF2, C/0 Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u18085
Ref: u18085
\ LICENSING DOCUMENT TRANSMITTAL
 
* FERMI 2 TECHNICAL REQUIREMENTS MANUAL -VOL I Revision 112 dated 06/26/2018 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
\                               LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I
Destroy the removed pages. Be sure that Revision 111 has been inserted prior to inserting these pages. SECTION In Front of TRM: Manual Immediately following Title Page 3.12 Fire Protection B3.12 Fire Protection
* Revision 112 dated 06/26/2018 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
* *
Destroy the removed pages. Be sure that Revision 111 has been inserted prior to inserting these pages.
* REMOVE and DESTROY Title Page Rev 111 05/03/2017 List of Effective Pages LEP-1 through LEP-4 Rev 111 05/03/2017 TRM 3.12-8 Rev 57 09/02 TRM B3 .12.2-1 Rev 44 05/01 END INSERT Title Page Rev 112 06/26/2018 List of Effective Pages . LEP-1 through LEP-4 Rev 112 06/26/2018 TRM 3.12-8 Rev 112 06/18 TRM B3.12.2-l Rev 112 06/18 
SECTION
.----------------------------
* REMOVE and DESTROY                          INSERT In Front of TRM: Manual   Title Page Rev 111 05/03/2017               Title Page Rev 112 06/26/2018 Immediately following      List of Effective Pages                     List of Effective Pages        .
* *
Title Page                LEP-1 through LEP-4 Rev 111                 LEP-1 through LEP-4 Rev 112 06/26/2018 05/03/2017 3.12 Fire Protection      TRM 3.12-8 Rev 57 09/02                     TRM 3.12-8 Rev 112 06/18 B3.12 Fire Protection      TRM B3 .12.2-1 Rev 44 05/01                 TRM B3.12.2-l Rev 112 06/18
* DTC: TM1RM I File: 1754 Date 06/26/2018 ARMS -INFORMATION Fermi 2 Technical Requirements Manual Volume I DTE Electric DSN: 1RMVOLI I Rev: 112 Recipient ll\1-fJ I ' _., * *
* END
* TRM i TRM ii TRM iii TRM iv TRM v TRM vi TRM 1.0-a TRM 1.0-1 TRM 2.0-1 TRM 3.0-a TRM 3.0-1 TRM 3.0-2 TRM 3.0-3 TRM 3.0-4 TRM 3.1-a TRM 3.1-1 TRM 3.2-1 TRM 3.3-a TRM 3.3-b TRM 3.3-c TRM 3.3-d TRM 3.3-1 TRM 3.3-2 TRM 3.3-3 TRM 3.3-4 TRM 3.3-5 TRM 3.3-6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-;l.O TRM 3.3-11 TRM 3.3-12 TRM 3.3-13 TRJ:,1 3.3-13a TRM 3.3-14 TRM 3.3-15 TRM 3.3-16 TRM 3.3-17 TRM 3.3-18 TRM 3.3-19 TRM 3.3-20 TRM 3.3-21 TRM 3.3-22 TRM 3.3-23 TRM 3.3-24 TRM 3.3-25 TRM 3.3-26 TRM 3.3-27 TRM 3.3-28 TRM 3.3-29 TRM 3.3-30 TRM Vol. I FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Revision 106 Revision 107 Revision 105 Revision 106 Revision 107 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 63 Revision 72 Revision 54 Revision 72 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 106 Revision 31 Revision 106 Revision 106 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 106 Revision 31 Revision 106 Revision 31 Revision 67 Revision 74 Revision 67 Revision 67 Revision 31 Revision 31 Revision 31 Revision 100 Revision 31 Revision 31 Revision 59 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 76 Revision 76 Revision 31 LEP-1 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 TRM 3.3-34a TRM 3.3-35 TRM 3.3-36 TRM 3.3-37 TRM 3.3-38 TRM 3.3-39 TRM 3.3-40 TRM 3.3-41 TRM 3.3-42 TRM 3.3-43 TRM 3.3-44 TRM 3.3-45 TRM 3.3-46 TRM 3.3-47 TRM 3 .3-48 TRM 3.3-49 *TRM 3.4-a TRM 3.4-1 TRM 3.4-la TRM 3.4-lb TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRM 3.4-5 TRM 3.4-6 TRM 3.4-7 TRM 3.4-8 TRM 3.4-9 TRM*3.4-10 TRM 3.5-1 TRM 3.6-a TRM 3.6-1 TRM 3. 6-2 TRM 3.6-3 TRM 3. 6-4 TRM 3.6-5 TRM 3.6-6 TRM 3. 6-7 TRM 3.6-8 TRM 3.6-9 TRM 3.6-10 TRM 3. 6-11 TRM 3.6-12 TRM 3.6-13 TRM 3.6-14 TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 Revision Revision 31 Revisi.on 31 Revision 31 Revision 31 Revision 106 Revision 60 Revision 104 Revision 72 Revision 31 Revision 31 R;evision 56 Revision 56 Revision 45 Revision 62 Revision 72 Revision 31 Revision 31 Revision\31 Revision 31 Revision 31 Revision 31 Revision 36 Revision 71 Revision 71 Revision 31 Revision 31' Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 70 Revision 60 Revision 67 Revision 31 Revision 109 Revision 87 Revision 33 Revision 31 Revision 31 .Revision 85 Revision 31 Rev:i.sion 31 Revision 31 Revision 71 Revision 31 Revision 31 Revision 31 Revision 31 REV 112 06/26/2018  
  *
'-*.!, FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES
* Fermi 2 Technical Requirements Manual
* Page Revision Page Revision TRM 3.6-18 Revision 31 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3. 6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3 .11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6. Revision 53
* Volume I DTE Electric
* TRM 3. 7-5* Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 98 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 77 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-a Revision 105
* DTC: TM1RM Date 06/26/2018 I File: 1754 ARMS - INFORMATION DSN: 1RMVOLI Recipient  ll\1-fJ I Rev: 112
* TRM 3.8-10 Revision 50 TRM 5.0-1 Revision 105 TRM 3.8-11 Revision 50 TRM 5.0-2 Revision 105 TRM Vol. I LEP-2 REV 112 06/26/2018 
 
*' * *
_.,
* TRM Bl. 0-1 TRM B2.0-1 TRM B3.0-1 TRM B3.0-2 TRM B3.0-2a TRM B3. 0-2b TRM B3.0-2c TRM B3. 0-3 TRM B3.0-4 TRM B3. 0-5 trRM B3.0-6 TRM B3. 0-7 TRM B3.1-1 TRM B3.2-1 TRM B3.3.1-1 TRM B3.3 .. 1-2 TRM B3.3.2-1 TRM B3.3.2-2 TRM B3.3.3-1 TRM B3.3.4-1 TRM B3.3.4-2 TRM B3.3.5-1 TRM B3.3.5-2 TRM B3.3.6-1 TRM B3.3.6-2 TRM B3.3.6-3 TRM B3.3.6-4 TRM B3.3.6-5 TRM B3.3.6-6 TRM B3.3.7-1 TRM B3.3.7-2 TRM B3.3.7-3 TRM B3.3.8-1 TRM B3.3.9-1 TRM B3.3.10-1 TRM B3.3.11-1 TRM B3.3.12-1 TRM B3.3.13-1 TRM B3.3.14-1 TRM B3.4.1-1 TRM B3.4.1-2 TRM B3.4.1-3 TRM B3.4.1-4 TRM B3.4.1-5 TRM B3.4.2-1 TRM B3.4.3-1 TRM B3.4.4-1 TRM ;83.4.5-1 TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 TRM B3.6.1-1 TRM Vol. I FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Revision 31 Revision 31 Revision 63 Revision 63 Revision 72 Revision 72 Revision 72 Revision 31 Revision 31 Revision 54 Revision 72 Revision 72 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 31 Revision 84 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 76 Revision 76 Revision 31 Revision 31 Revision 106 Revision 31 Revision 31 Revision 56 Revision 45 Revision 62 Revision 31 Revision 31 Revision 31 Revision 71 Revision 71 Revision 71 Revision 71 Revision 31 Revision 31 Revision 31 Revision 31-Revision 31 Revision 31 Revision 31 Revision 31 LEP-3 TRM B3.6.2-l TRM B3.6.3-1 TRM B3.6.4-1 TRM B3.6.5-1 TRM B3.6.6-1 TRM B3.6.7-1 TRM B3.6.8-l TRM B3.7.l-1 TRM B3.7.2-1 TRM B3.7.3-l TRM B3.7.4-l TRM B3.7.4-2 TRM B3.7.5-1 TRM B3.7.6-l TRM B3.7.7-1 TRM B3.7.8-l TRM B~.7.9-1 TRM B3.8.l-l TRM B3.8.2-1 TRM B3.8.3-1 TRM B3.8.4-1 TRM B3.8.5-l TRM B3.8.6-l TRM B3.9.l-l TRM B3.9.2-l TRM B3.9.3-l TRM B3.9.4-l TRM B3.10-1 TRM B3 .11.1-1 TRM B3.12.l-l TRM B3.12.2-1 TRM B3.12.3-l TRM B3.12.4-l TRM B3.12.5-l TRM B3.12.6-1 TRM B3.12.7-1 TRM B3.12.8-1 Revision Revision 67 Revision 87 Revision 31 Revision 31 Revision 70 Revision 31 Revision 31 Revision 31 Revision 107 Revision 73 Revision 31 Revision 31 Revision 31 Revision 31 Revision 99 Revision 31 Revision 79 Revision 31 Revision 31 Revision 96 Revision 31 Revision 31 Revision 43 Revision 31 Revision 65 Revision.
I '
31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 112 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 112 06/26/2018 1~*. .; ** *
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES
* FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 19, Revision 0 Page Notation Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TRM Vol. I Revision 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LEP-4 REV 112 06/26/2018 
* TRM TRM TRM TRM i
* *
ii iii iv Revision Revision Revision Revision Revision 106 107 105 106 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 Revision Revision 31 Revisi.on 31 Revision 31 Revision 31 TRM    v        Revision 107                TRM 3.3-34a    Revision 106 TRM    vi      Revision 31                  TRM 3.3-35    Revision 60 TRM    1.0-a   Revision 31                  TRM 3.3-36    Revision 104 TRM    1.0-1   Revision 31                  TRM 3.3-37    Revision 72 TRM    2.0-1    Revision 31                  TRM 3.3-38    Revision 31 TRM   3.0-a   Revision 31                  TRM 3.3-39    Revision 31 TRM   3.0-1   Revision 63                  TRM 3.3-40    R;evision 56 TRM   3.0-2    Revision 72                  TRM 3.3-41    Revision 56 TRM   3.0-3   Revision 54                  TRM 3.3-42    Revision 45 TRM   3.0-4    Revision 72                  TRM 3.3-43    Revision 62 TRM   3.1-a    Revision 31                  TRM 3.3-44    Revision 72 TRM   3.1-1    Revision 31                  TRM 3.3-45    Revision 31 TRM   3.2-1    Revision 31                  TRM 3.3-46    Revision 31 TRM   3.3-a    Revision 31                  TRM 3.3-47    Revision\31 TRM   3.3-b    Revision 31                  TRM 3 .3-48    Revision 31 TRM    3.3-c    Revision 106                TRM 3.3-49    Revision 31 TRM   3.3-d    Revision 31                *TRM 3.4-a      Revision 31 TRM   3.3-1    Revision 106                TRM 3.4-1      Revision 36 TRM   3.3-2    Revision 106                TRM 3.4-la    Revision 71
* Fire Suppression Water System TR 3.12.2 TR 3.12 FIRE PROTECTION TR 3.12.2 Fire Suppression Water System TRLCO 3.12.2 The fire suppression water system shall be OPERABLE with: a. Two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header; b. The general service water intake structure water level _2: 562 feet; and c. An OPERABLE flow path capable of taking suction from the general service water intake structure and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device in each sprinkler or hose standpipe and the last valve ahead of the spray system required to be OPERABLE per TRLCO 3.12.3, TRLCO 3.12.6, and TRLCO 3.12.7. APPLICABILITY:
* TRM   3.3-3    Revision 31                  TRM 3.4-lb    Revision 71 TRM   3.3-4    Revision 31                  TRM 3.4-2      Revision 31 TRM   3.3-5    Revision 31                  TRM 3.4-3      Revision 31' TRM    3.3-6    Revision 31                  TRM 3.4-4      Revision 31 TRM   3.3-7    Revision 31                  TRM 3.4-5      Revision 31 TRM   3.3-8    Revision 106                 TRM 3.4-6      Revision 31 TRM    3.3-9    Revision 31                 TRM 3.4-7      Revision 31 TRM    3.3-;l.O Revision 106                TRM 3.4-8      Revision 31 TRM    3.3-11  Revision 31                 TRM 3.4-9      Revision 31 TRM    3.3-12  Revision 67                  TRM*3.4-10    Revision 31 TRM    3.3-13  Revision 74                  TRM 3.5-1      Revision 31 TRJ:,1 3.3-13a  Revision 67                  TRM 3.6-a      Revision 70 TRM    3.3-14  Revision 67                  TRM 3.6-1      Revision 60 TRM    3.3-15  Revision 31                 TRM 3. 6-2    Revision 67 TRM    3.3-16  Revision 31                 TRM 3.6-3      Revision 31 TRM    3.3-17  Revision 31                 TRM 3. 6-4    Revision 109 TRM    3.3-18  Revision 100                 TRM 3.6-5      Revision 87 TRM    3.3-19  Revision 31                 TRM 3.6-6      Revision 33 TRM   3.3-20  Revision 31                 TRM 3. 6-7    Revision 31 TRM   3.3-21  Revision 59                  TRM 3.6-8      Revision 31 TRM   3.3-22  Revision 31                  TRM 3.6-9    .Revision 85 TRM   3.3-23  Revision 31                  TRM 3.6-10    Revision 31 TRM   3.3-24  Revision 31                  TRM 3. 6-11    Rev:i.sion 31 TRM   3.3-25  Revision 31                  TRM 3.6-12    Revision 31 TRM   3.3-26  Revision 31                  TRM 3.6-13    Revision 71
At all times. ACTIONS A. CONDITION One fire suppression pump inoperable.
* TRM   3.3-27  Revision 31                  TRM 3.6-14    Revision 31 TRM   3.3-28  Revision 76                  TRM 3.6-15    Revision 31 TRM   3.3-29  Revision 76                  TRM 3.6-16    Revision 31 TRM   3.3-30  Revision 31                  TRM 3.6-17    Revision 31 TRM Vol. I                            LEP-1              REV 112    06/26/2018
A.1 OR A.2 REQUIRED ACTION Restore the inoperable pump to OPERABLE status. Provide an alternate backup pump. COMPLETION TIME 14 days 14 days B. The fire suppression B.1 Establish backup fire suppression water system. 24 hours C. water system inoperable for reasons other than Condition A. OR Required Actions and associated Completion Time of Condition B not met. B.2 Perform evaluation to 24 hours determine extent of inoperability and C.1 AND C.2 AND C.3 establish required compensatory measures.
 
Be in MODE 2. Be in MODE 3. Be in MODE 4. 7 hours 13 hours 37 hours TRM Vol. I TRM 3.12-8 REV 112 06/18 
'-*.!,
* *
FERMI 2 -  TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES
* TR B3.12 FIRE PROTECTION TR B3.12.2 Fire Suppression Water System BASES Fire Suppression Water System TR B3.12.2 The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression systems consists of the water system, spray and/or* sprinkler systems, CO2 systems, Halon systems, and fire hose stations.
* Page TRM TRM TRM TRM 3.6-18 3.6-19 3.6-20 3.6-21 Revision Revision Revision Revision Revision 31 31 31 31 Page TRM TRM TRM TRM 3.8-12 3.8-13 3.8-14 3.8-15 Revision Revision Revision Revision Revision 31 61 46 31 TRM 3.6-22  Revision 31                TRM 3.8-16    Revision  31 TRM 3.6-23  Revision 31                TRM 3.8-17    Revision  43 TRM 3.6-24  Revision 58                TRM 3.8-18    Revision  33 TRM 3.6-25  Revision 31                TRM 3.9-a      Revision  31 TRM 3. 6-26 Revision 31                TRM 3.9-1      Revision  31 TRM 3.6-27  Revision 31                TRM 3.9-2      Revision  65 TRM 3.6-28  Revision 31                TRM 3.9-3      Revision  80 TRM 3.6-29  Revision 31                TRM 3.9-4      Revision  88 TRM 3.6-30  Revision 31                TRM 3.9-5      Revision  31 TRM 3.6-31  Revision 31                TRM  3.10-1    Revision  31 TRM 3.6-32  Revision 70                TRM 3.11-a      Revision 31 TRM 3.6-33  Revision 31                 TRM  3 .11-1    Revision 31 TRM  3.6-34  Revision 31                TRM  3.12-a    Revision 31 TRM  3.6-35  Revision 31                 TRM 3.12-1      Revision 75 TRM  3.7-a  Revision 107                TRM  3.12-2    Revision 31 TRM  3.7-1  Revision 60                TRM 3.12-3      Revision 31 TRM  3.7-2  Revision 107                TRM  3.12-4    Revision 102 TRM  3.7-3  Revision 70                TRM 3.12-5      Revision 108 TRM  3.7-4  Revision 73                TRM 3.12-6. Revision 53
The collective capability of the fire suppression systems is adequate to minimize potential damage to related equipment and is a major element in the facility fire protection program. In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to. service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.
* TRM  3. 7-5* Revision 31                 TRM  3.12-7    Revision 31 TRM  3.7-6  Revision 31                 TRM  3.12-8    Revision 112 TRM  3.7-7  Revision 31                 TRM  3.12-9    Revision 40 TRM  3.7-8  Revision 31                 TRM  3.12-10    Revision 31 TRM  3.7-9  Revision 31                 TRM 3.12-11    Revision 49 TRM  3.7-10  Revision 44                TRM  3.12-12    Revision 31 TRM  3. 7-11 Revision 31                 TRM  3.12-13    Revision  75 TRM  3.7-12  Revision 72                TRM 3.12-14    Revision 31 TRM 3.7-13  Revision 31                 TRM 3.12-15    Revision 31 TRM 3.7-14  Revision 31                TRM 3.12-16    Revision 75 TRM 3.7-15  Revision 98                TRM 3.12-17    Revision 31 TRM 3.7-16  Revision 31                 TRM 3.12-18    Revision 75 TRM 3.7-17  Revision 31                 TRM 3.12-19    Revision 31 TRM 3.7-18  Revision 77                TRM 3.12-20    Revision 75 TRM 3.7-19  Revision 31                TRM 3.12-21    Revision 31 TRM 3.7-20  Revision 79                TRM 3.12-22    Revision 31 TRM 3.8-Revision 31                 TRM 3.12-23    Revision 31 TRM 3.8-Revision 31                TRM 3.12-24    Revision 31 TRM 3.8-Revision 31                TRM 3.12-25    Revision 31 TRM 3.8-Revision 96                TRM 3.12-26    Revision 75 TRM 3.8-Revision 96                TRM 3.12-27    Revision 31 TRM 3.8-Revision 31                 TRM 3.12-28    Revision 31 TRM 3.8-Revision 50                TRM 3.12-29    Revision 78 TRM 3.8-Revision 50                TRM 3.12-30    Revision 31 TRM 3.8-Revision 50                TRM 4.0-1      Revision 31
The surveillance requirements provide assurances that the minimum OPERABILITY requirements of the fire suppression systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks . An exception is made to TRSR 3.12.2.6 and TRSR 3.12.2.11 for valves not accessible during unit operation.
* TRM 3.8-Revision 50                TRM 5.0-a     Revision 105 TRM 3.8-10  Revision 50                TRM 5.0-1     Revision 105 TRM 3.8-11  Revision 50                TRM 5.0-2     Revision 105 TRM Vol. I                        LEP-2              REV 112  06/26/2018
The valve that meets this criterion is T8000F037.
 
In the event the fire suppression water system becomes inoperable, immediate compensatory measures must be taken since this system provides the major fire suppression capability of the plant. It may be necessary to perform a fire protection engineering evaluation to determine the extent of inoperability of the fire suppression water system. The evaluation would also determine which conditions in TRLCO 3.12.3,.TRLCO 3.12.6, and TRLCO 3.12.7 are applicable based on the fire suppression water system inoperability.
*'
The evaluation may determine that required actions in these other TRLCOs are adequate compensatory measures.
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES
If the evaluation determines there are no adequate compensatory measures and no backup fire suppression water system can be established within the allowed time, then entry into Action C is required . TRM Vol. I TRM B3.12.2-l REV. 112 06/18}}
* TRM TRM TRM TRM Bl. 0-1 B2.0-1 B3.0-1 B3.0-2 Revision Revision Revision Revision Revision 31 31 63 63 TRM TRM TRM TRM B3.6.2-l B3.6.3-1 B3.6.4-1 B3.6.5-1 Revision Revision Revision Revision Revision 67 87 31 31 TRM B3.0-2a    Revision 72                TRM B3.6.6-1    Revision 70 TRM B3. 0-2b    Revision 72                TRM B3.6.7-1    Revision 31 TRM B3.0-2c    Revision 72                TRM B3.6.8-l    Revision 31 TRM B3. 0-3    Revision 31                 TRM B3.7.l-1    Revision 31 TRM B3.0-4      Revision 31                TRM B3.7.2-1    Revision 107 TRM B3. 0-5    Revision 54                TRM B3.7.3-l    Revision 73 trRM B3.0-6      Revision 72                TRM B3.7.4-l    Revision 31 TRM B3. 0-7    Revision 72                TRM B3.7.4-2    Revision 31 TRM B3.1-1      Revision 31                 TRM B3.7.5-1    Revision 31 TRM B3.2-1      Revision 31                TRM B3.7.6-l    Revision 31 TRM B3.3.1-1    Revision 31                 TRM B3.7.7-1    Revision 99 TRM B3.3 .. 1-2 Revision 31                TRM B3.7.8-l    Revision 31 TRM B3.3.2-1    Revision 31                 TRM B~.7.9-1    Revision 79 TRM B3.3.2-2    Revision 31                 TRM B3.8.l-l    Revision 31 TRM B3.3.3-1    Revision 67                TRM B3.8.2-1    Revision 31 TRM B3.3.4-1    Revision 31                 TRM B3.8.3-1     Revision 96 TRM B3.3.4-2    Revision 84                TRM B3.8.4-1    Revision 31 TRM B3.3.5-1    Revision 31                 TRM B3.8.5-l    Revision 31 TRM B3.3.5-2    Revision 31                TRM B3.8.6-l    Revision 43
* TRM B3.3.6-1    Revision 31                 TRM B3.9.l-l    Revision 31 TRM B3.3.6-2    Revision 31                 TRM B3.9.2-l    Revision 65 TRM B3.3.6-3    Revision 31                TRM B3.9.3-l    Revision. 31 TRM B3.3.6-4    Revision 31                 TRM B3.9.4-l    Revision  31 TRM  B3.3.6-5    Revision 76                TRM B3.10-1     Revision 31 TRM B3.3.6-6    Revision 76                TRM B3 .11.1-Revision 31 TRM B3.3.7-1    Revision 31                TRM B3.12.l-l    Revision 31 TRM B3.3.7-2    Revision 31                TRM B3.12.2-1    Revision 112 TRM B3.3.7-3    Revision 106                TRM B3.12.3-l    Revision  31 TRM B3.3.8-1   Revision 31                TRM B3.12.4-l    Revision  31 TRM B3.3.9-1   Revision 31                TRM B3.12.5-l    Revision  31 TRM B3.3.10-1  Revision 56                TRM B3.12.6-1    Revision  31 TRM B3.3.11-1  Revision 45                TRM B3.12.7-1    Revision  31 TRM B3.3.12-1   Revision 62                TRM B3.12.8-1   Revision  31 TRM B3.3.13-1   Revision 31 TRM B3.3.14-1   Revision 31 TRM B3.4.1-1   Revision 31 TRM B3.4.1-2   Revision 71 TRM B3.4.1-3   Revision 71 TRM B3.4.1-4   Revision 71 TRM B3.4.1-5    Revision 71 TRM B3.4.2-1   Revision 31 TRM B3.4.3-1   Revision 31 TRM B3.4.4-1    Revision 31 TRM ;83.4.5-1  Revision 31-
* TRM B3.4.6-1    Revision 31 TRM B3.4.7-1    Revision 31 TRM B3.5-1      Revision 31 TRM B3.6.1-1   Revision 31 TRM Vol. I                            LEP-3               REV 112  06/26/2018
 
1~*.
      .;
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
    **
LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 19, Revision 0 Page                  Revision Notation Page 1                         0 2                        0 3                         0 4                        0 5                        0 6                        0 7                        0 8                        0 9                        0 10                        0 11                       0 12                       0 13                       0 14                       0 15                        0 16                        0 17                        0
* 18 19 20 21 22 23 0
0 0
0 0
0 24                        0
* TRM Vol. I                            LEP-4           REV 112  06/26/2018
 
Fire Suppression Water System TR 3.12.2
* TR 3.12 TR 3.12.2 TRLCO 3.12.2 FIRE PROTECTION Fire Suppression Water System The fire suppression water system shall be OPERABLE with:
: a. Two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header;
: b. The general service water intake structure water level
_2: 562 feet; and
: c. An OPERABLE flow path capable of taking suction from the general service water intake structure and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device in each sprinkler or hose standpipe and the last valve ahead of the spray system required to be OPERABLE per TRLCO 3.12.3, TRLCO 3.12.6, and TRLCO 3.12.7.
APPLICABILITY:        At all times.
ACTIONS CONDITION                    REQUIRED ACTION            COMPLETION TIME
* A. One fire suppression pump inoperable.
A.1 OR Restore the inoperable pump to OPERABLE status.
14 days A.2      Provide an alternate    14 days backup pump.
B. The fire suppression      B.1     Establish backup fire  24 hours water system                        suppression water inoperable for reasons              system.
other than Condition A.                         OR B.2      Perform evaluation to  24 hours determine extent of inoperability and establish required compensatory measures.
C. Required Actions and      C.1     Be in MODE 2.           7 hours associated Completion Time of Condition B        AND not met.
* C.2     Be in MODE 3.           13 hours AND C.3     Be in MODE 4.          37 hours TRM Vol. I                            TRM 3.12-8                      REV 112  06/18
 
Fire Suppression Water System TR B3.12.2
* TR B3.12 TR B3.12.2 BASES FIRE PROTECTION Fire Suppression Water System The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression systems consists of the water system, spray and/or* sprinkler systems, CO2 systems, Halon systems, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.
In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to. service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.
The surveillance requirements provide assurances that the minimum OPERABILITY requirements of the fire suppression systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks .
* An exception is made to TRSR 3.12.2.6 and TRSR 3.12.2.11 for valves not accessible during unit operation.
T8000F037.
The valve that meets this criterion is In the event the fire suppression water system becomes inoperable, immediate compensatory measures must be taken since this system provides the major fire suppression capability of the plant.
It may be necessary to perform a fire protection engineering evaluation to determine the extent of inoperability of the fire suppression water system. The evaluation would also determine which conditions in TRLCO 3.12.3,.TRLCO 3.12.6, and TRLCO 3.12.7 are applicable based on the fire suppression water system inoperability. The evaluation may determine that required actions in these other TRLCOs are adequate compensatory measures. If the evaluation determines there are no adequate compensatory measures and no backup fire suppression water system can be established within the allowed time, then entry into Action C is required .
* TRM Vol. I                         TRM B3.12.2-l                   REV. 112 06/18}}

Revision as of 21:35, 20 October 2019

Technical Requirements Manual, Vol. 1, Revision 112
ML18192B984
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/26/2018
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18192B984 (9)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/26/18 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 112 1 IR 06/26/18 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/0 Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: u18085

\ LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I

  • Revision 112 dated 06/26/2018 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 111 has been inserted prior to inserting these pages.

SECTION

  • REMOVE and DESTROY INSERT In Front of TRM: Manual Title Page Rev 111 05/03/2017 Title Page Rev 112 06/26/2018 Immediately following List of Effective Pages List of Effective Pages .

Title Page LEP-1 through LEP-4 Rev 111 LEP-1 through LEP-4 Rev 112 06/26/2018 05/03/2017 3.12 Fire Protection TRM 3.12-8 Rev 57 09/02 TRM 3.12-8 Rev 112 06/18 B3.12 Fire Protection TRM B3 .12.2-1 Rev 44 05/01 TRM B3.12.2-l Rev 112 06/18

  • END
  • Fermi 2 Technical Requirements Manual
  • Volume I DTE Electric
  • DTC: TM1RM Date 06/26/2018 I File: 1754 ARMS - INFORMATION DSN: 1RMVOLI Recipient ll\1-fJ I Rev: 112

_.,

I '

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

ii iii iv Revision Revision Revision Revision Revision 106 107 105 106 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 Revision Revision 31 Revisi.on 31 Revision 31 Revision 31 TRM v Revision 107 TRM 3.3-34a Revision 106 TRM vi Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-a Revision 31 TRM 3.3-36 Revision 104 TRM 1.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 2.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-40 R;evision 56 TRM 3.0-2 Revision 72 TRM 3.3-41 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-42 Revision 45 TRM 3.0-4 Revision 72 TRM 3.3-43 Revision 62 TRM 3.1-a Revision 31 TRM 3.3-44 Revision 72 TRM 3.1-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-47 Revision\31 TRM 3.3-b Revision 31 TRM 3 .3-48 Revision 31 TRM 3.3-c Revision 106 TRM 3.3-49 Revision 31 TRM 3.3-d Revision 31 *TRM 3.4-a Revision 31 TRM 3.3-1 Revision 106 TRM 3.4-1 Revision 36 TRM 3.3-2 Revision 106 TRM 3.4-la Revision 71

  • TRM 3.3-3 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-3 Revision 31' TRM 3.3-6 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-6 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-;l.O Revision 106 TRM 3.4-8 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-12 Revision 67 TRM*3.4-10 Revision 31 TRM 3.3-13 Revision 74 TRM 3.5-1 Revision 31 TRJ:,1 3.3-13a Revision 67 TRM 3.6-a Revision 70 TRM 3.3-14 Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-15 Revision 31 TRM 3. 6-2 Revision 67 TRM 3.3-16 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-17 Revision 31 TRM 3. 6-4 Revision 109 TRM 3.3-18 Revision 100 TRM 3.6-5 Revision 87 TRM 3.3-19 Revision 31 TRM 3.6-6 Revision 33 TRM 3.3-20 Revision 31 TRM 3. 6-7 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-8 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-9 .Revision 85 TRM 3.3-23 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-24 Revision 31 TRM 3. 6-11 Rev:i.sion 31 TRM 3.3-25 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-13 Revision 71
  • TRM 3.3-27 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-15 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-17 Revision 31 TRM Vol. I LEP-1 REV 112 06/26/2018

'-*.!,

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • Page TRM TRM TRM TRM 3.6-18 3.6-19 3.6-20 3.6-21 Revision Revision Revision Revision Revision 31 31 31 31 Page TRM TRM TRM TRM 3.8-12 3.8-13 3.8-14 3.8-15 Revision Revision Revision Revision Revision 31 61 46 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3. 6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3 .11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6. Revision 53
  • TRM 3. 7-5* Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 98 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 77 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 50 TRM 4.0-1 Revision 31
  • TRM 3.8-9 Revision 50 TRM 5.0-a Revision 105 TRM 3.8-10 Revision 50 TRM 5.0-1 Revision 105 TRM 3.8-11 Revision 50 TRM 5.0-2 Revision 105 TRM Vol. I LEP-2 REV 112 06/26/2018
  • '

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • TRM TRM TRM TRM Bl. 0-1 B2.0-1 B3.0-1 B3.0-2 Revision Revision Revision Revision Revision 31 31 63 63 TRM TRM TRM TRM B3.6.2-l B3.6.3-1 B3.6.4-1 B3.6.5-1 Revision Revision Revision Revision Revision 67 87 31 31 TRM B3.0-2a Revision 72 TRM B3.6.6-1 Revision 70 TRM B3. 0-2b Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.6.8-l Revision 31 TRM B3. 0-3 Revision 31 TRM B3.7.l-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.2-1 Revision 107 TRM B3. 0-5 Revision 54 TRM B3.7.3-l Revision 73 trRM B3.0-6 Revision 72 TRM B3.7.4-l Revision 31 TRM B3. 0-7 Revision 72 TRM B3.7.4-2 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.6-l Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.7-1 Revision 99 TRM B3.3 .. 1-2 Revision 31 TRM B3.7.8-l Revision 31 TRM B3.3.2-1 Revision 31 TRM B~.7.9-1 Revision 79 TRM B3.3.2-2 Revision 31 TRM B3.8.l-l Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.2-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.3-1 Revision 96 TRM B3.3.4-2 Revision 84 TRM B3.8.4-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.5-l Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.6-l Revision 43
  • TRM B3.3.6-1 Revision 31 TRM B3.9.l-l Revision 31 TRM B3.3.6-2 Revision 31 TRM B3.9.2-l Revision 65 TRM B3.3.6-3 Revision 31 TRM B3.9.3-l Revision. 31 TRM B3.3.6-4 Revision 31 TRM B3.9.4-l Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3 .11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.l-l Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 112 TRM B3.3.7-3 Revision 106 TRM B3.12.3-l Revision 31 TRM B3.3.8-1 Revision 31 TRM B3.12.4-l Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.5-l Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.7-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.8-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM ;83.4.5-1 Revision 31-
  • TRM B3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM Vol. I LEP-3 REV 112 06/26/2018

1~*.

.;

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 19, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0

  • 18 19 20 21 22 23 0

0 0

0 0

0 24 0

  • TRM Vol. I LEP-4 REV 112 06/26/2018

Fire Suppression Water System TR 3.12.2

  • TR 3.12 TR 3.12.2 TRLCO 3.12.2 FIRE PROTECTION Fire Suppression Water System The fire suppression water system shall be OPERABLE with:
a. Two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header;
b. The general service water intake structure water level

_2: 562 feet; and

c. An OPERABLE flow path capable of taking suction from the general service water intake structure and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device in each sprinkler or hose standpipe and the last valve ahead of the spray system required to be OPERABLE per TRLCO 3.12.3, TRLCO 3.12.6, and TRLCO 3.12.7.

APPLICABILITY: At all times.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

A.1 OR Restore the inoperable pump to OPERABLE status.

14 days A.2 Provide an alternate 14 days backup pump.

B. The fire suppression B.1 Establish backup fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> water system suppression water inoperable for reasons system.

other than Condition A. OR B.2 Perform evaluation to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> determine extent of inoperability and establish required compensatory measures.

C. Required Actions and C.1 Be in MODE 2. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> associated Completion Time of Condition B AND not met.

  • C.2 Be in MODE 3. 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> AND C.3 Be in MODE 4. 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> TRM Vol. I TRM 3.12-8 REV 112 06/18

Fire Suppression Water System TR B3.12.2

  • TR B3.12 TR B3.12.2 BASES FIRE PROTECTION Fire Suppression Water System The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression systems consists of the water system, spray and/or* sprinkler systems, CO2 systems, Halon systems, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to. service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.

The surveillance requirements provide assurances that the minimum OPERABILITY requirements of the fire suppression systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks .

  • An exception is made to TRSR 3.12.2.6 and TRSR 3.12.2.11 for valves not accessible during unit operation.

T8000F037.

The valve that meets this criterion is In the event the fire suppression water system becomes inoperable, immediate compensatory measures must be taken since this system provides the major fire suppression capability of the plant.

It may be necessary to perform a fire protection engineering evaluation to determine the extent of inoperability of the fire suppression water system. The evaluation would also determine which conditions in TRLCO 3.12.3,.TRLCO 3.12.6, and TRLCO 3.12.7 are applicable based on the fire suppression water system inoperability. The evaluation may determine that required actions in these other TRLCOs are adequate compensatory measures. If the evaluation determines there are no adequate compensatory measures and no backup fire suppression water system can be established within the allowed time, then entry into Action C is required .

  • TRM Vol. I TRM B3.12.2-l REV. 112 06/18