MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
/REGULATORY FORMATION DISTRIBUTION S EM (RIOS)ACCESS IOA NBR;8505210335 DOC, DATE: 85/05/15 FACIL:50-335 St.Lucie Plantr Unit 1<Florida 50;389 St, lucio Plantr Unit 2, Florida AUTH~NAME AUTHOR AFFILIATION WILLIAMS~J.W.F l or i da Power tt Light Co, REC1P~NAME RECIPIENT AFFILIATION MILLER',R~Operating Reactors Branch NOTARIZED>>
NO Power tt Light Co Power tt light'o, 3 DOCKET 05000335 05000389
SUBJECT:
Advises that u.til will respond<<to Reg Guide 1.97 open items" by 850705rper 850425 ltd DISTRIBUTION CODE: A003D COPIES RECEIVED:LTR ENCl SIZK;TITLE!OR/Licensing Submit,tall Suppl 1 to NUREG~0737(G neric Ltr 82 33)NOTES>>Ol'2/01/76 OL;04/06/83.
05000335 05000389 RECIPIENT IO CODE/NAME NRA ORB3 BC INTERNAL;ADM/LFMB NRR PAULSONpW NRR/OHFS/PSRB NRR/DL/ORB5 NRR/DSI/I CSB NRR/DSI/RAG EXTERNAL: LPDR NSIC COPIES lTTR ENCL 2 5 1 1 RECIPIENT ID CODE/NAME NRR ORB3 BC IK/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR/DS I/CPB NRR/OS I/MKTB NRR/OS I/RSB RGN2 NRC~POR COPIES LTTR ENCL'OTAL NUMBER OF COPIES REQUIRED>>LTTR 42 ENCL
~Kg,e', ll e',~K)ef r'~K)'1 et'ehK e iK'e)f 1~)II K c'r f el e eq K I e r Fe'l~~I.h K I I e KI l)fr e))Xe>K')~l KK),'K KX, 1)f frW C)t, 1 r ee<<e ea w ea er ew"3i)I'~f 3 e.j:>f 3 r f f'er f ji))-f L)KJQ KK'.KKe,i,'
It,)I>ra)r)a>)SK YK)=frtjf, h)0 f f;KfeK": f<>f)r i,hKK, Kra h 1)i 1 fK fh,f ie ll tl ek hg I'I Xl X<<'.I c,"g)'<))f,)" X gKfI'7 I, K'it jh 1'l t,jlK~Xh I'$1 f ptKQ I tht I 4~KXt~'$IhXK X,>>i'I, X KI j I'KK I ht I lrl rr II I',.h II yak lie~~ri e~FLORIDA POWER&LIGHT COMPANY gg 1 GSN L-85-I 95 Office of Nuclear Reactor Regulation Attention:
Mr.James R.Miller, Chief Operating Reactors Branch No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Mr.Miller:
Re: St.Lucie Unit Nos.I and 2 Docket Nos.50-335 and 50-389 Conformance to Regulatory Guide l.97, Revision 2 (NRC TAC Nos.5I l35&5l l36)H Florida Power and Light Company's schedule for responding to the Regulatory Guide l.97 open items identified in your letter of April 25, l 98$, is July5, l 985.Very truly yours, J.W.Williams, Jr.Group Vice President Nuclear.Energy JWW/R JS/cab 85052i0335 850515 PDR ADOCK 05000335 F PDR o>>I D PEOPLE...SERVING PEOPLE It May 9, 1985 Docket Nos.50-335 and 50-389 Mr.J.W.Williams, Jr.Vice President Nuclear Energy Department Florida Power 8 Light Company P, 0.Box 14000 Juno Beach, Florida 33408
Dear Mr.Williams:
DISTRIBUTION:
ZgETFIEE G y Fi 1'NRC PDR L PDR HThompson OELD EJordan BGrimes JPartlow DESells PMKreutzer ACRS+10
SUBJECT:
DRAFT TECHNICAL EVALUATION REPORT (TER)FOR SALEM ATWS ITEM 1.2 (GENERIC LETTER 83-28)Re: St.Lucie Plant, Unit Nos.182 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.For the St.Lucie Plant, Unit Nos.1 8 2, your response was found to be incomplete in four of the areas evaluated..
The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.
Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the DRAFT TER.Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.OMB clearance is not required since the information needs for each plant vary.Sincerely,
Enclosure:
DRAFT TER on Salem ATWS Item 1.2 James R.Miller, Chief Operating Reactors Branch¹3 Division of Licensing cc w/enclosure See next page ORB¹3:J3L euCzer/g/85 OR¹3:DL DES lls:dd 5//85:DL Miller//85 I I t 1 h~I II M rF O W h I'll I II I SAIC-85/$525-10 REYIEW OF LICENSEE AND APPLICANT RESPONSES TO NRC GENERIC LETTER 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2,"POST-TRIP REYIEW: DATA AND INFORMATION CAPABILITIES" FOR ST.LUCIE PLANT, UNITS 1!2 (50-335, 50<<389)Technical Evaluation Report Prepared.by Science Applications International Corporation 1710 Goodridge Drive NcLean, Virginia 22102 Prepared for U.S.Nuclear Regulatory Commission Washington, D.C.20555 Contract No.NRC-03-82-096 FOREWORD This report contains the'technical evaluation of the St.Lucie Plant, Units 1S2 response to Generic Letter 83-28 (Required Actions Based on Generic Implications'f Salem ASS Events), Item 1.2"Post Trip Review: Data and Information Capabilities." For the purposes of this evaluation,.
the review criteria, presented in part 2 of this report, were divided into five separate categories.
These are: 1.'he parameters monitored by the sequence of events and the time history recorders, 2.The performance characteristics of the sequence of events recorders, 3.The performance characteristics of the time history recorders, 4.The data output format, and 5.The long-term data retention capability for post-trip review material.n All available responses to Generic Letter 83-28 were evaluated.
The plant for which this report is applicable was found to have adequately responded to, and met, category 2.~~C~~The report describes the specific methods used to determine he cate-gorization of the responses to Generic Letter 83-28.Since this valuation report was intended to apply to more than one nuclear power plan specifics regarding how each plant met (or failed to meet)the are not presented.
Instead, the evaluation presents a categorization of the responses according to which categories of are satisfied and which are not.The evaluations are based on pecific criteria (Section 2)derived from the requirements as stated in the generic letter.
TABLE OF CONTENTS Section Introduction.
Page~~~~~~~~~~~~~~~1 1.Background.
~~~~~~~~~~~~~~~2 2.Revie~Criteria.~~~~~~~~~3 3.Evaluation.
~~~~~~~~~~~~~~~8 4.Conclusion.
5.-References.
...g uP/84~/A@4.
8 oG~~~~~~~~~~vM~pate.V~~~~Co<.~~~~~~~~~r 10 (j~~~~~~~~~~~~1~~~~~~~~~9
'INTRODUCTION SAIC has reviewed thesubmittals.prepared in response to Generic Letter 83-28, item 1.2"Post-Trip Review: Data and Information Capability".
The submittalS(see references) contained, sufficient information to determine that the data and information capabilities at this plant are acceptable in the following area.o The sequence-of-events recorder(s) performance charac-teristics.
However, the data and information capabilities, as described in the submittal, either fail to meet the review criteria or provide insufficient information to allow determination of the adequacy of the data and information capabilities in the following areas.o The parameters monitored by both the sequence-of-events and time history recorders.
e The time history recorder(s) performance characteris-tics.o The output format of the recorded data.o The long-term data retention, record keeping, capa-bil i ty.
1.Background
On February 25, 1984, both of the scram circuit breakers at Un~t 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the reactor protection system.This incident occurred during the plant startup and the reactor was tripped manually by the operator about 30 seconds after.the initiation of the automatic trip signal.The failure of the circuit breakers has been determined to be related to the sticking of the under voltage trip attachment.
Prior to this incident;on February 22, 1983;at Unit 1 of the Salem Nuclear Power Plant an automatic trip signal was generated based on steam generator low-low level during plant startup.ln this case the reactor was tripped manually by the operator almost coinci-dentally with the automatic trip.At that time, because the utility did not have a requirement for the systematic evaluation of the reactor trip, no investigation was performed to determine whether the reactor was tripped automatically as expected or manually.The utilities'ritten procedures
.required only that the cause of the trip be determined and identified the responsible personnel that could authorize a restart if the cause of the trip is known.Following the second trip which"'learly indicated the problem with the trip breakers, the question was raised on whether the circuit breakers had functioned properly during the earlier incident.The most useful source of information in this case, namely the sequence of events printout which would have indicated whether the reactor was tripped automatically or manually during the February 22 incident,'as not retained after the incident.Thus, no judgment on the proper functioning of the trip system during the earlier incident could be made.Following these incidents; on February 28, 1983;the NRC Executive Director for Operations (EDO), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant.'he results of the staff's inquiry'nto the generic implications of the Salem Unit incidents is reported in NUREG-1000,"Generic Implications of ATMS Events at the Salem Nuclear Power Plant." Based on the results of this study, a set of required actions were developed and included in Generic Letter 83-28 which was issued on July 8, 1983 and sent to all licensees of operating reactors, applicants for operating license, and construction permit holders.The required actions in this generic letter consist of four categories.
These are: (1)Post-Trip Review, (2)Equipment Classification and Yender Interface, (3)Post Haintenance Testing, and (4)Reactor Trip System Reliability Improvements.
The first required action of the generic letter, Post-Trip Review, is the subject of this TER and consists of action item 1.1"Program Description and Procedure" and action item 1.2"Data and Information Capability." In the next section the review critqria used to assess the adequacy of the utilities'espon'ses to the requirements of action item 1.2 will be discussed.
2.Review Criteria The intent of the Post Trip Review requirements of Generic Letter 83-28 is to ensure that the licensee has adequate procedures and data and information sources to understand the causd knd progression of a reactor trip.This understanding should go beyond a simple identification of the course of the event.It should include the capability to determine the root cause of the reactor trip and to determine whether safety limits have been exceeded and if so to what extent.Sufficient information about the reactor trip event should be available so that a decision on the acceptability of a reactor restart can be made.The following are the review criteria developed for the requirements of Generic Letter 83-28, action item 1.2: The equipment that provides the digital sequence of events (SOE)record and the analog time history records of an unscheduled shutdown should pro-vide a reliable source of the necessary information to be used in the post trip review.Each plant variable which is necessary to determine the cause(s)and progression of the event(s)following a plant trip should be monitored by at least one recorder/such as a sequence-of-events recorder or a plant process computer for digital parameters; and strip charts, a plant process computer or analog recorder for analog (time history)variabl esp Each device used to record an analog or digital plant variable should be described in sufficient detail so that a determination can be made as to whether the following performance characteristics are met:
o Each sequence-of-events recorder should be capable of detecting and recording the sequence of events with a sufficient time discrimination capability to ensure that the time responses asso-ciated with each monitored safety-related system can be ascer-tained, and that a determination can be made as to whether the time response is within acceptable limits based on , FSAR Chapter 15 Accident Analyses.The recommended guideline for the SOE time discrimination is approxi-mately 100 msec.If current SOE recorders do not have this time discrimination capability the licensee or applicant should show that the current time discrimination capability is sufficient for~an adequate reconstruction of the course of the reactor trip.As a minimum this should include the ability to adequately recon-struct the accident scenarios presented in Chapter 15 of the plant FSAR.o Each analog time history data recorder should have a sample inter-val small enough so that the incident can be accurately reconstructed following a reactor trip.As a minimum, the licensee or applicant should be able to reconstruct the course of the accident sequences evaluated in the accident analysis of the'lant FSAR (Chapter 15).The recommended guideline for the sample interval is 10 sec.If the time history equipment does not meet this guideline, the licensee or applicant should show that the current time history capability is sufficient to accurately recon-struct the accident sequences presented in Chapter 15 of the FSAR.o To support the post trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of updating and retaining information from approximately five minutes prior to the trip until at least ten minutes after the trip.o The information gathered by the sequence-of-events and time history data collectors should be stored in a manner that will allow for retrieval and analysis.The data may be retained in either hardcopy (computer printout, strip chart output, etc.)or in an accessible memory (magnetic disc or tape).This information should be presented in a readable and meaningful format, taking into consideration good human factors practices (such as those outlined in NUREG-0700).
'o All equipment used to.record sequence of events and time history information should be powered from a reliable and non-interruptible power source.The power source used need not be safety-related.
The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the reactor trip can be reconstructed.
The parameters monitored should provide sufficient information to determine the root cause of the reactor trip, the progression of the reactor trip, and the response of the plant parameters and systems to the reactor trip.Specifically, all input parameters associated with reactor trips, safety in5ections and other safety-related systems as well as output parameters sufficient to record the proper functioning of these systems should be recorded for use in the post trip review.The parameters deemed necessary, as a minimum, to perform a post-trip review (oneSthat would determine if the plant remained within its design envelope)are presented on Tables 1.2-1 and 1.2-2.If the appli-cants'r licensees'OE recorders and time history recorders do not monitor all of the parameters suggested in these tables the applicant or licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remained within the design envelope for the appro-priate accident conditions; such as those analyzed in Chapter 15 of the plant Safety Analysis Report.Information gathered during the post trip review is required input for future post trip reviews.Data from all unscheduled shutdowns provides a valuable reference source for the determination of the acceptability of the plant vital parameter and equipment response to future unscheduled shut-downs.It is therefore necessary that information gathered during all post trip reviews be maintained in an accessible manner for the life of the plant.5 Table 1.2-1.PAR Parameter List SOE Recorder Time History Reco'rder Parameter Si nal (1)x x (1)x x (1)x x (2)(1)x (1)x (1)x (1)x (1)x (3)x x (1)x (1)x (1)x (3)x Reactor Trip Safety Infection Containment Isolation Turbine Trip Control Rod Position Neutron Flux, Power Containment Pressure Containment Radiation Containment Sump Level Primary System Pressure Primary System Temperature Pressurizer Level Reactor Coolant Pump Status Primary System Flow Safety In).;Flow, Pump/Valve Status HSIV Position Steam Generator Pressure Steam Generator Level Feedwater Flow Steam Flow Auxiliary Feedwater System;Flow, Pump/Value Status AC and DC System Status (Bus Voltage)Diesel Generator Status (Start/Stop, On/Off)PORV Position (1.): Trip parameters (2): Parameter may be monitored by either an SOE or time history recorder.(3): Acceptable recorder options are: (a)system flow recorded on an SOE recorder, (b)system flow recorded on a time history recorder, or (c)equipment status recorded on an SOE recorder.
Table 1.2-2.BMR Parameter List SOE Recorder Time History'ecorder Parameter/Signal x x (1)x (I)(2)x (1)(2)x (1)x (1)x x (1)(3)x (1)x (1)(3)(4)Reactor Trip Safety Injection Containment Isolation Turbine Trip Control Rod Position Neutron Flux, Power Hain Steam Radiation Containment (Dry Hell)Radiation Drywell Pressure (Containment Pressure)Suppression Pool Temperature Primary System Pressure Primary System Level HSIY Position Turbine Stop Valve/Control Valve Position Turbine Bypass Valve Position Feedwater Flow Steam Flow Recirculation; Flow, Pump Status Scram Discharge Level Condenser Vacuum AC and DC System Status (Bus Voltage)Safety In)ection; Flow, Pump/Valve Status Diesel Generator Status (On/Off, Start/Stop)
(1): Trip parameters.
(2): Parameter may be recorded by either an SOE or time history recorder.(3): Acceptable recorder options are: (a)system flow recorded on an SOE recorder, (b)system flow recorded on a time history recorder, or (c)equipment status recorded on an SOE recorder.(4): Includes recording of parameters for all applicable systems from the following:
MPCI, LPCI, LPCS, IC, RCIC.
3.Evaluation The parameters identified in part 2 of this report as a part of the review criteria are those deemed necessary to perform an adequate post-trip review.The recording of the'se parameters on equipment that meets the guidelines of the review criteria will result in a source of information that can be used to determine the cause of the reactor trip and the plant response to the trip, including the responses of important plant systems.The parameters identified in this submittal as being recorded by the sequence of events and time history recorders do not correspond to the parameters specified in part 2 of this report.The review criteria require that the equipment being used to record the sequence of events and time history data required for a post-trip review meet certain performance characteristics.
These characteristics are intended to ensure that, if the proper parameters are recorded, the record-ing equipment will provide an adequate source of information for an effec'-tive post-trip review.The information provided in this submittal does not indicate that the time history equipment used would meet the intent of the performance criteria outlined in part 2 of this report.Information supplied in the submittal does indicate that the SOE equipment meets the performance criteria specified in part 2 of this report.The data and information recorded for use in the post-trip review should be output in a format that allows for ease of identification and use of the data to meet the review criterion that calls for information in a readable and meaningful format.The information contained in this submittal does not indicate that this requirement is met.The data and information used during a post-trip eview should be retained as part of the plant files.This information uld prove useful during future post-trip reviews.Therefore, one is that infor-mation used during a post-trip review be maintained in an accessible manner for the life of the plant.The information contained within this submittal does not indicate that this criterion will be met.
4.Conclusion The information supplied in response to Generic Letter 83-28 in8icates that the current post-trip review data and information capabilities are adequate in the following area: 1.The sequence of events recorders meet the minimum performance requirements.
The information supplied in response to Generic Letter 83-28 does not indicate that the post-trip review data and infor~ation capabilities are adequate in the following areas.1.Based upon the information contained in the submittal, all of the parameters specified in part 2 of this report that should be recorded for use in a post-trip review are not recorded.2.Time history recorders, as described in the submittal, do not meet the minimum performance characteristics.
3.As described in the submittal, the recorded data may not be output in a readable and meaningful format.4.The data retention procedures, as described in the submittal, do not indicate that the information recorded for the post-trip review is maintained in an accessible manner for the life of the plant.It is possible that the current data and information capabil'ities.at this t pd d<<1 1<<p but were not completely described.
Under these circumstances, the licensee should provide an updated, more complete, description to show in more detail the data and information capabilities at this nuclear power plant.If the information provided accurately represents all current data and information capabil ties, then the licensee should either show that the data and informa-tion capabilities meet the intent of the criteria in part 2 of this report, or detail future modifications that would enable the licensee to meet the intent of the evaluation criteria.
~~REFERENCES NRC Generic Letter 83-28."Letter to all licensees of operating reactors, applicants for operating license, and holders of construction permits regarding Required Actions Based on Generic Implications of Salem ATHS Events.=" July 8, 1983.NUREG-1000, Generic Implications of ATMS Events at the Salem Nuclear Power Plant, April 1983.Letter from J.M.Mil 1 iams, Jr., Florida Power and Light, to D.G.Eisenhut, NRC, dated November 8, 1984, Accession Number 8311110156 in-response to Generic Letter 83-28 of July 8, 1983, with attachment.
10 SUPPORTING DOCUMENT FOR TELECON St.Lucie 1 and 2 1.Parameters recorded: Unsatisfactory 2.See attached.table for discrepancies.
SOE recorders performance characteristics:
Satisfactory Unit 1 sequence of events recorder: 2msec time discrimination with a non-interruptible power supply Unit 2 sequence of events recorder: 1msec time discrimination with a non-interruptible power supple 3-.Time hi story recorders performance characteristics:
Unsatisfactory SAS (TEC Corp.computer);
sample interval of between 1 and 60 secs for the period from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before to 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> after the trip with non-interruptible power supply Strip charts: power 1"/hr rate, continuous monitoring and non-interruptible 4.Data output format: Unsatisfactory SOE output includes time of event, sensor ID, and an event descriptor.
Time history output includes time, parameter name and value for the strip charts;the TEC computer output is not specified.
5.Data retention capability:
Unsatisfactory Strip chart data is retained sometimes for life of plant, sometimes not at all.
Required PWR Parameters for Post Trip Review (circled parameters are not recorded)SOE Recorder Time History Recorder Parameter/Si nal x (I)x x (I)x x (I)x.x (2)(I)(3)(I)x (I)x (I)x (I)x (4)x x (I)x (I)x (I)x (4)Reactor Trip Safety Injection Containment Isolation Turbine Trip Control Rod Position Neutron Flux, Power Containment Pressure Containment Radiation Containment Sump Level Primary System Pressure (Vessel Pressure, Pressurizer Pressure)Primary System Temperature Pressurizer Level Reactor Coolant Pump Status Primary System Flow Safety Inj.;Flow, Pump/Valve Status MSIV Position Steam Generator Pressure Steam Generator Level Feedwater Flow Steam Flow Auxiliary Feedwater System;Flow, Pump/Value Status AC and DC System Status Diesel Generator Status PORV Position (I): Trip parameters; pressurizer or primary pressure is a trip parameter (depending on plant).2): Parameter may be monitored by either an SOE or time history recorder.3): Acceptable recorder options are: (a)reactor vessel pressure recorded on both an SOE and time history recorder, or (b)pressurizer pressure recorded on both an SOE and time history recorder.(4): Acceptable recorder options are: (a)system flow recorded on an SOE recorder, (b)system flow recorded on a time history recorder, or (c)equipment status recorded on an SOE recorder.