Text

ACCELERATED TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9006050158 DOC.DATE: 90/05/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that air operated safety related components will perform all design basis events,per 881227 ltr.

DISTRIBUTION CODE: ROOID COPIES RECEIVED:LTR Q ENCL 0 SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD NORRIS,J INTERNAL: ACRS NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST 8E2 NRR/DST/SELB 8D NRR/DST/SICB 7E NRR/DST/SRXB 8E NUDOCS-ABSTRACT 0 gjg3 OGC/HDS2 REG FILE 01 RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL

P.O. Box14000, Juno Beach, FL 33408-0420 MAY 31 Igp L-90-189 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Instrument Air Supply System Problems Affectin Safet -Related E ui ment Generic Letter 88-14 By letter L-88-539, dated December 27, 1988, Florida Power 6 Light Company (FPL) provided its phased schedule for responding to Generic Letter (GL) 88-14. FPL Letter L-89-98, dated March 14, 1989, provided the first set of responses to GL 88-14; FPL L-89-232, dated June 28, 1989, provided the second response to letter GL 88-14.

In accordance with the schedule provided in L-88-539, FPL has verified by test that air-operated safety-related components on St.

Lucie Unit 1 will perform as expected in accordance with all design-basis events, including a loss of normal instrument air system.

All actions required by Generic Letter 88-14 are now complete for St. Lucie Units 1 and 2.

Please contact us if you have any questions about this submittal.