 Issue dateTitleTopic
ML17223A94013 September 1990Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility
ML17223A93410 September 1990Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl
L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 830 August 1990Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8
ML17223A92028 August 1990Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr
ML17223A89120 August 1990Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience
ML17348A50417 August 1990Forwards fitness-for-duty Program Performance Data for Jan-June 1990Fitness for Duty
L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant16 August 1990Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant
ML17223A8759 August 1990Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor
IR 05000335/19900149 August 1990Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor
ML17348A47027 July 1990Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance TestingFitness for Duty
ML17223A86225 July 1990Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831
ML17348A42825 July 1990Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b)
ML17223A86325 July 1990Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage
L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders20 July 1990Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders
ML17223A85819 July 1990Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants
ML17223A84918 July 1990Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor
ML17223A85217 July 1990Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program
IR 05000335/19900139 July 1990Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements
ML17223A8429 July 1990Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements
ML17348A3885 July 1990Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs
ML17223A8393 July 1990Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3
ML17223A8382 July 1990Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790)
L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)2 July 1990Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
ML17223A83727 June 1990Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress
ML17308A49827 June 1990Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective ActionsScram Discharge Volume
ML17223A83419 June 1990Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs
ML17223A82418 June 1990Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988.
ML17223A82718 June 1990Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes
ML17348A29812 June 1990Forwards Rev 16 to Topical QA Rept.
ML17223A67631 May 1990Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant
ML17348A26529 May 1990Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4)Fitness for Duty
ML17223A67422 May 1990Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete
ML17223A6368 May 1990Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker
ML17223A62821 April 1990Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989.
ML17223A60813 April 1990Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded
ML17223A6075 April 1990Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage
ML17308A4912 April 1990Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety QuestionSafe Shutdown
Boric Acid
Ultimate heat sink
Coatings
Nondestructive Examination
Emergency Lighting
Turbine Missile
Fuel cladding
ML17223A59330 March 1990Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress
ML17223A59227 March 1990Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged
ML17223A58319 March 1990Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f)Safe Shutdown
ML17347B61913 March 1990Provides Listing of Property Insurance Programs
ML17223A5539 March 1990Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart
ML17223A5458 March 1990Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc
ML17308A4877 March 1990Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 GuidelinesSafe Shutdown
Fire Barrier
ML17347B5881 March 1990Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits
ML17347B60327 February 1990Requests Approval to Use Code Case N-468 at PlantsSafe Shutdown Earthquake
Earthquake
ML17223A53226 February 1990Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2.
ML20012A00126 February 1990Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request
ML17223A54126 February 1990Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 TelconsPower change
IR 05000335/198902422 February 1990Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled