Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17223A940 | 13 September 1990 | Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility | |
ML17223A934 | 10 September 1990 | Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl | |
L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 | 30 August 1990 | Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 | |
ML17223A920 | 28 August 1990 | Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr | |
ML17223A891 | 20 August 1990 | Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience | |
ML17348A504 | 17 August 1990 | Forwards fitness-for-duty Program Performance Data for Jan-June 1990 | Fitness for Duty |
L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant | 16 August 1990 | Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant | |
ML17223A875 | 9 August 1990 | Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor | |
IR 05000335/1990014 | 9 August 1990 | Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor | |
ML17348A470 | 27 July 1990 | Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing | Fitness for Duty |
ML17223A862 | 25 July 1990 | Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 | |
ML17348A428 | 25 July 1990 | Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) | |
ML17223A863 | 25 July 1990 | Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage | |
L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders | 20 July 1990 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders | |
ML17223A858 | 19 July 1990 | Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants | |
ML17223A849 | 18 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor | |
ML17223A852 | 17 July 1990 | Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program | |
IR 05000335/1990013 | 9 July 1990 | Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements | |
ML17223A842 | 9 July 1990 | Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements | |
ML17348A388 | 5 July 1990 | Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs | |
ML17223A839 | 3 July 1990 | Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 | |
ML17223A838 | 2 July 1990 | Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) | |
L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) | 2 July 1990 | Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) | |
ML17223A837 | 27 June 1990 | Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress | |
ML17308A498 | 27 June 1990 | Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions | Scram Discharge Volume |
ML17223A834 | 19 June 1990 | Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs | |
ML17223A824 | 18 June 1990 | Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. | |
ML17223A827 | 18 June 1990 | Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes | |
ML17348A298 | 12 June 1990 | Forwards Rev 16 to Topical QA Rept. | |
ML17223A676 | 31 May 1990 | Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant | |
ML17348A265 | 29 May 1990 | Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) | Fitness for Duty |
ML17223A674 | 22 May 1990 | Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete | |
ML17223A636 | 8 May 1990 | Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker | |
ML17223A628 | 21 April 1990 | Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. | |
ML17223A608 | 13 April 1990 | Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded | |
ML17223A607 | 5 April 1990 | Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage | |
ML17308A491 | 2 April 1990 | Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question | Safe Shutdown Boric Acid Ultimate heat sink Coatings Nondestructive Examination Emergency Lighting Turbine Missile Fuel cladding |
ML17223A593 | 30 March 1990 | Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress | |
ML17223A592 | 27 March 1990 | Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged | |
ML17223A583 | 19 March 1990 | Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) | Safe Shutdown |
ML17347B619 | 13 March 1990 | Provides Listing of Property Insurance Programs | |
ML17223A553 | 9 March 1990 | Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart | |
ML17223A545 | 8 March 1990 | Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc | |
ML17308A487 | 7 March 1990 | Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines | Safe Shutdown Fire Barrier |
ML17347B588 | 1 March 1990 | Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits | |
ML17347B603 | 27 February 1990 | Requests Approval to Use Code Case N-468 at Plants | Safe Shutdown Earthquake Earthquake |
ML17223A532 | 26 February 1990 | Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. | |
ML20012A001 | 26 February 1990 | Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request | |
ML17223A541 | 26 February 1990 | Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons | Power change |
IR 05000335/1989024 | 22 February 1990 | Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled |