ML17223A532

From kanterella
Jump to navigation Jump to search
Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2.
ML17223A532
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/26/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223A533 List:
References
L-90-73, NUDOCS 9003060138
Download: ML17223A532 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003060138 DOC.DATE: 90/02/26 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida ower & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co.

RECIP.NAME '

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) CQ uP R

SUBJECT:

Forwards CEN-396 (L)-NP, "Verification of Acceptability of 1-Pin Burnup Limit of 60 MWD/kg for St Lucie Upit 2."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 NORRIS,J 5 5 D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 D NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC L 1 0 OGC/HDS2 1 0 FIL 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I D

S A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP. US TO REDUCE WASTE! CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25

A lg I I,

g I

0 P.O. Box14000, Juno Beach, FL 33408-0420 FEBRUARY 2 6 $ 990 L-90-73 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 Fuel Pin Burnu Limit to 60 MWD k Per letter L-90-21 dated January 25, 1990, Florida Power and Light Company submitted Combustion Engineering (CE) proprietary report, CEN-396 (L) -P, "Verification of the Acceptability of a 1-Pin Burnup Limit of 60 MWD/kg for St. Lucie Unit 2." As requested by the NRC staff, attached is CE non-proprietary report, CEN-396 (L)-NP, "Verification of the Acceptability of a 1-Pin Burnup Limit of 60 MWD/kg for St. Lucie Unit 2," dated November 1989.

Should you have any further questions, please contact us.

Very truly yours, DA. S r Vice P e ident St. Luc e Plant DAS/MSD/tbj Attachment I

cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 9003060138 900226 PDR ADOCK 05000339 mr . U an FPL Group company

h-