Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress
ML17223A837
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/27/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, L-90-202, NUDOCS 9007050051
Download: ML17223A837 (3)


Text

,P.C+ELERATED DISIBUTION DEMONSTlION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007050051 DOC.DATE: 90/06/27 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit, 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides details of implementation plan re recommendations

& schedular requirements in GL 89-10,per 891228 ltr. D DISTRIBUTION CODE: A064D COPIES RECEIVED:LTR g ENCL 0 SIZE:

TITLE: Response to Generic Ltr 89-10, "Safety-Related MOV Testing & Surveill 8

/ NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD D NORRIS,J INTERNAL: ACRS BAER, B RES D

R~~

REG FILE MEB 9H NRR/LPEB/BC RES/DSIR/EIB/B EXTERNAL: LPDR NRC PDR NSIC D

A D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI .

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL

P

~$

P.O. Box14000, Juno Beach, FL 33408-0420 UH 27 l990 L-90-202 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Safety-Related Motor-Operated Valve Testing and Surveillance Generic Letter 89-10 By letter L-89-467 dated December 28, 1989, Florida Power and Light (FPL) provided its initial response to Generic Letter 89-10, and its acceptance of the recommendations and schedular requirements provided in the Generic Letter (GL).

A commitment was made to provide details of our implementation plans by June 1990.

Prior to the June 13, 1990 issuance of Supplement 1 to GL 89-10, all MOVs subject to the expanded requirements had been identified for both St. Lucie units. This list is currently under review to ensure compliance with the guidance provided in Supplement 1 and will be amended as necessary. Completion of this review is scheduled for December, 1990.

Design basis review of the subject valves and the determination of the switch settings for these valves in accordance with the recommendations made in GL 89-10 are in progress. Completion of these activities is scheduled for December, 1991, pending resolution of related industry research and initiatives currently underway.

FPL intends to begin implementation of GL 89-10 recommendations during the upcoming St. Lucie Unit 2 Fall refueling outage. All other recommendations promulgated in the Generic Letter are currently under review, and programs which implement these recommendations will be in place in accordance with the specified schedular guidance.

Should you have any questions on this information, please contact us.

Very truly yours, D. A. er Vice r sident St. Lu e Plant DAS:JMP:kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC DAS/PSL 8195 9007050051 900627 on Fpl Group company PDR ADOCK 05000335 P PDC