L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
ML20055E751
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/02/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-239, NUDOCS 9007120303
Download: ML20055E751 (1)


Text

- . _ . -

ef  ;

P.O.B'ox 14000. Juno Be sch, FL 33400 0420  !

3 JUL 2 is jJ

  • x pg i j;

L-90-239 .

.J 10 CFR 50.54  :

l I i

'U.-S.-Nuclear Regulatory Commission  ;

Attn: Document Control ~ Desk ,

R Washington,.D. C. -20555 .I

' Gentlemen:.

Re:' St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Guard Training and Qualification Plan Revision 6 Under 10'CFR 50.54(o) .

Florida Power & Light Company has revised the Guard Training.and "

Qualification ~ Plan and has determined that the revision does not decrease the safeguards effectiveness of the plan. Pursuant to 10-CFR.' 50. 54 (p) , a report describing the revision and copies PSLTQP-R06-3'through PSLTQP-R06-6 are enclosed.

Enclosure.1: ' Summary of changes.and marked up. revised pages..

Enclosure 2: Directions for incorporating Revision 6 into the ,

- plan, a revised list of effective pages, and copies ~

of the Revision 6 replacement pages. f u Th'e- enclosed! material no longer contains safeguards information as  ?

defined by:10 CFR 73.21.

By copy of this' letter, we are forwarding copies PSLTQP-R06-1 and ,

PSLTQP-R06-2 to the Nuclear Regulatory Commission, Region II.  !

'Very;truly yours, h

D. A.

lb er

, Site. e President St. e Plant DAS/GRM/sh Enclosures  ;

< cc:' Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant (w/o attachment) 4 n! '% h f g,,w'f5##

F g, s.

, - p

% wam 3 '. g ., ,;. . -~ a f! '.

.