ML17305A862: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 02/28/1990
| issue date = 02/28/1990
| title = Errata to Monthly Operating Rept for Feb 1990 for Palo Verde Nuclear Generating Station,Unit 2
| title = Errata to Monthly Operating Rept for Feb 1990 for Palo Verde Nuclear Generating Station,Unit 2
| author name = PORTER K F
| author name = Porter K
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 20:18, 18 June 2019

Errata to Monthly Operating Rept for Feb 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A862
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050337
Download: ML17305A862 (2)


Text

NRC MONTHLY OPERATING REPORT~~AMENDED~~DOCKET NO.50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: ebrua 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: A 11.12.13.14.15.16.17.18.19.20.21.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor This Month 6 2 551 0 0 0 551 0 0 0 2 064 631 26 800 683 616 Yr.-to-Date 1 416 1 295 0 0 0 1 295 0 0 0 480 00 1 12 500 1 614 008 Cumulative 30 216 20 546 1 0 0 0 042 2 0 0 3 499 053 23 996 820 I 66 3s 66 3 22'3.24.(Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 83 3 80 1 0 0 93 4 89 8 0 0 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A 65 0%62 5 9 9 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Ma 31 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86~06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 9006050337 9005$i PDR ADOCK 05000529 R'DC 6 C l I I