ML18011A480: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/31/1994
| issue date = 05/31/1994
| title = Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant.W/940614 Ltr
| title = Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant.W/940614 Ltr
| author name = ROBINSON W R, ROGERS S
| author name = Robinson W, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 06:18, 18 June 2019

Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant.W/940614 Ltr
ML18011A480
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-049, HNP-94-49, NUDOCS 9406220003
Download: ML18011A480 (8)


Text

ACCELERATED DI TRIBUTION DEMONS"N.r TION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9406220003 DOC.DATE: 9&~NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFlLIATION ROGERS,S.Carolina Power 6 Light Co.ROBXNSON,W.R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000400

SUBJECT:

Monthly operating rept ay 1994 for Shearon Harris Nuclear Power Plant.W 940614 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL t SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS~~~I-~0 1 EXTERNAL: EGGG BRYCE, J.H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DSP/TPAB NRR/DRXL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 0'

Carolina Power&Light Company PO Box 165 New Hill NC 27562 JUN 3 4 1994 File: HO-941044 William R.Robinson Vice President Harris Nuclear Plant Serial HNP-94-049 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO-;NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1994.Sincerely, W.R.Robinson SGR:smh Enclosure c: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRR)Mr.J.E.Tedrow (NRC-SHNPP) 9406220003 940531 PDR ADOCK 05000400 R , PDR 2003.>6 State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 Enclosure to Serial HNP-94-049 Sheet 1 of 4 CP!L CO RUN DATE 06/02/94 RUN TIME 15s08s51 PLANT PERFORMANCE DATA SYSTEM OPERATZNG DATA REPORT HARRIS UNIT 1 PACE RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOTES 1.UNIT NAMEs HARRIS UNIT 1 2.REPORTING PERZODs MAY 94 3.LICENSED THERMAL POWER (MWT): 277S 4.NAMEPLATE RATING (GROSS KK)s 950.9 5.DESIGN ELECTRICAL RATING (NET MWE)s 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE)s 920.0 7.MAX DEs>BNQABLN CAP>sCZTY (NET MQE)s 860.0 8.IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS s 9.POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE)s, 10.REASONS FOR RESTRICTION ZF ANYs THIS MONTH YR TO DATE CUMUL ATZVE 11.HOURS IN REPORTZNC PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13~REACTOR RESERVE SHUTDOWN HRS 14.HOURS CENERATOR ON LIlK 1S.UNIT RESERVE SHUTDOWN HOURS 16~CROSS THERMAL ENERCY CEN.(MWH)17.CROSS ELEC.ElKRCY CEN.(MWH)18.NET ELEC.ENERGY CENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNZ'V>>ss'.I-FTY'FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 508.87.00 467.58.00 1134158.04 372461.00 338177.00 62.85 62.85 52.85 50.50.00 (TYPE>DATE, 3623 F 00 2358'0.00 2317.13.00 6202358.10 2080982.00 1926696,00 63.96 63.96 61.84 59.09.00 AND DURATION 62088.00 50661.01.00 50094.76.00 133461012.

06 44515203.00 41460093.00 80.68 80'8 77'5 74.20 3.19 OF EACH)s 25.ZF SHUTDOWN AT END OP REPORT PERIOD, ESTIMATED DATE OF START UPs 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OFR.RPT/2/084 1.16-9 1 Enclosure to Serial HNP-94-049 Sheet 2 of 4 CP4L CO PLANT PERFORMANCE DATA SYSTEM~RUN DATE 06/02/94 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 15:08)51'ARRIS UNIT 1 PAGE 1 RPD39-000 DOCEET NO.050-400 COMPLETED BY SHEILA ROGERS'ELEPHONE (919)362"2573 1994 DAY AVG.DAILY PONER LEVEL (WE-NET)DAY AVG.DAILY POMER LEVEL (WE-NET)-12 17 812-22 18 823-26 19 840 32 20 869-34 21 873-36~22 867-37 23 863-38 24 855-37 25 853 10-37 26 852-39 27 863 12 20 28 867 13 154 29 862 14 243 30 859 15 573 31 859 16 636 1.16-8 MIS/MTH-OPR.RPT/3/OS4 x CO I O y 0 CO UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1994 DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 NUMBER 94-007 DATE TYPE'40319 DURATION (HOURS)276.42 REASON'ETHOD OF SHUTTING DOWN REACTORs LICENSEE EVENT REPORT 0 N/A SYSTEM CODE 4 Zz COMPONENT CODE 5 ZZZZZZ CAUSE A CORRECTIVE ACTION TO PREVENT RECURRENCE Normal Refueling and Reactor Physics/Low Power testing required following Refueling Outage No.5.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Corrective action to prevent recurrence as per the Licensee Event Report.3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit 1-Same Source~cn lr1 CD g~, 0 CD$D~0 o Z~~'p~0 C)

~gC UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1994 DOCKET NO.: 050400 UNIT NAME: Harris DATE: June I, 1994 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 NUMBER DATE TYPE'URATION (HOURS)REASON METHOD OF SHUTTING DOWN REACTORs LICENSEE EVENT REPORT 4 SYSTEM CODE 4 COMPONENT CAUSE&CORRECTIVE CODE 5 ACTION TO PREVENT RECURRENCE 94408 940512 0.0 N/A zz Physics and Tech Spec Surveillance testing required following Refueling Outage.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Corrective action to prevent recurrence as per the Licensee Event Report.3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data-Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit I-Same Source~cn Irl CD A SO o Z~0 C)