ML19003A191: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 5: | Line 5: | ||
| author name = Benjamin J | | author name = Benjamin J | ||
| author affiliation = NRC/RGN-III/DRS/EB2 | | author affiliation = NRC/RGN-III/DRS/EB2 | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000461 | | docket = 05000461 |
Revision as of 16:19, 12 June 2019
ML19003A191 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 01/03/2019 |
From: | Jamie Benjamin NRC/RGN-III/DRS/EB2 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2019011 | |
Download: ML19003A191 (9) | |
See also: IR 05000461/2019011
Text
January 3, 2019
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: CLINTON POWER STATION-REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION
(TEAM); INSPECTION
REPORT 05000 461/20 1 9 011 Dear Mr. Hanson: On March 11, 2019
, the U.S. Nuclear Regulatory Commission (NRC) will begin a
T riennial Baseline Design Bases Assurance Inspection (T
eam) at Clinton Power Station
. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21
M. The Design Bases Assurance Inspection focuses on the design, maintenance, and operation
of risk significant components
with low margin, or associated with
an accident scenario , or a specific system. The inspection also monitors the implementation of modifications to structures, systems, and components
as modifications to one system may also affect the design bases and functioning of interfacing systems as well as introduce the potential for common cause failures. The components and modifications to be reviewed during this baseline inspection will be
identified as part of the
preparation for the inspection and finalized during the in-office preparation week that occurs prior to the first onsite inspection
week. In addition, operating experience issues will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from you
r simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second onsite week.
The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
The inspection will include
2 weeks onsite. The inspection team will consist of six NRC inspectors wh
o will focus on engineering/maintenance
/operations
of the selected components and modifications. The current inspection schedule is as follows:
Preparation week:
March 4, 2019, through March 8, 2019
- Onsite weeks
March 11, 2019, through March 15, 2019;
and March 25, 2019, through March 29, 2019
.
B. Hanson -2- Experience with previous baseline design/modification inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors
and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection.
It is important that all of these documents are u
p-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than January 28, 2019.
By February 18, 2019, the lead inspector will communicate the initial selected set of approximately seven components
and seven modifications
. The second group of documents requested is
those items needed to support our
in-office preparation activities. This set of documents, including the calculations associated with the initia
l l y selected components
and the modification packages associated with the initially selected modifications, should be provided to the lead inspector at the Regional Office no later than February 25, 2019.
During the in
-office preparation activities, the team may identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on March 11, 2019. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Jamie Benjamin. We understand that our licensing contact for this inspection is
Nicholas Santos
of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630
-829-9747 via e-mail at Jamie.Benjamin@nrc.gov
. This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
B. Hanson -3- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html
and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely, /RA/ Jamie Benjamin
, Senior Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket No. 50
-461 License No. NPF
-62 Enclosure:
Design Bases Assurance Inspection
Document Request
cc: Distribution via LISTSERV
B. Hanson -4- Letter to Bry an C. Hans on from Jamie Benjamin dated January 3, 201 9. SUBJECT: CLINTON POWER STATION
-REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM)
- INSPECTION
REPORT 05000461/2019 011 DISTRIBUTION
- Stacey Rosenberg
RidsNrrDorlLpl3
RidsNrrPMClinton Resource
RidsNrrDirs
Irib Resource
DRSIII DRPIII ADAMS Accession Number: ML19003A191
OFFICE RIII NAME JBenjamin:jw
DATE 01/03/1 9 OFFICIAL RECORD COPY
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
Enclosure Inspection Report:
05000 461/20 1 9 011 Inspection Dates:
March 11, 2019, through
March 15, 2019;
and March 25, 2019, through March
29 , 2019. Inspection Procedure:
71111.21 M , "Design Bases Assurance Inspection (Team)
" Lead Inspector:
63 0-829-9747 Jamie.Benjamin@nrc.gov
I. Information Requested for Selection of Components/Modifications
The following information is requested by
January 28, 2019, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the lead inspector
as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats
on a CD-ROM. The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).
1. Core Damage Frequency Risk-ranking of top
500 components from your site specific probabilistic safety
analysis (PSA) sorted by Risk
-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk
-Reduction Worth, and Fussell
-Veseley (as applicable).
2. Large Early Release Frequency Risk-ranking of top 500 from your site specific PSA sorted by RAW. Include values for Birnbaum Importance, Risk
-Reduction Worth, and Fussell
-Veseley (as applicable)
. 3. Provide a list of the top 500 cut
-sets from your PSA.
4. Provide a list of the top 100 cut
-sets for each initiator modeled in the PSA that contributes more than 5
percent to the baseline plant core damage frequency.
5. Copies of PSA "system notebooks" and latest PSA summary document.
6. Provide a risk ranking of operator actions from your PSA, sorted by RAW. Include values for Birnbaum importance, Ri
sk-Reduction Worth, and Fussell-Veseley. 7. Provide a copy of the internal flooding PSA notebook
. 8. Provide copies of the emergency operating procedures.
9. Provide a list of all abnormal/off
-normal procedures.
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
2 10. If you have an External Events or Fire PSA Model, provide the
information requested in Items 1 and 2 for external events and fire. Provide narrative description of each coded event (including fire, flood zone description).
11. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal
, etc.). 12. Electronic copy of the site Individual Plant Examination of External Events , if available.
13. List of available design (setup) margins in both the open and closed direction (identify safety
-related direction) for valves in t
he Motor-Operated Valve and A ir-Operated Valve Programs. Identify the basis for how the margin was determined.
14. List of high risk Maintenance Rule systems/components based on engineering
or expert panel judgment
(i.e., those systems/components not identified high risk
in the P S A). 15. Structures, systems, and components (SSCs)
in the Maintenance Rule (a)(1) category within the last 3 years. 16. Site top 10 issues list (if applicable).
17. A list of operating experience evaluations for the last
3 years. 18. Information of any common cause failure of components experienced in the
last 5 years at your facility.
19. List of Root Cause and Common Cause Evaluations associated with component failures or design issues initiated/completed in the last
5 years. 20. List of open operability evaluations.
21. List of SSCs considered operable but degraded/nonconforming.
22. List of "permanent plant modifications" to SSCs that are field work complete
in the last 3 years. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design
changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) The list should contain the number of each document, title, revision
/date, and the affected system.
23. A list of calculation changes that have been
issued for use in the last 3 years.
24. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, and post
-modification testing.
25. A list of corrective action documents (open and closed) in the last 3 years that address permanent plant modifications issues, concerns, or processes.
These documents should also include the corrective action documents associated with the modification implementation.
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
3 26. Current management, engineering, operation, and maintenance
organizational chart.
27. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, Technical Requirements Manual, and Operational Requirements Manual
. 28. Major one line electrical drawings (ac and dc) and key diagrams (electronic and paper copies
). 29. Electronic copy of big notes/horse notes.
30. Electronic copy of Piping and Instrumentation Drawings (if available).
II. Information Requested (for the approximate 7 selected components
, 7 selected modifications, and operational experience) to be Available by
February 25, 2019.
This information
should be separated for each selected component
or modification , especially if provided electronically (e.g., folder with component or modification name that includes calculations, condition reports, maintenance history, etc
.). Items 1-1 2 are associated with
the selected components and
Item 1 3 for the selected modifications.
1. List of condition reports (both corrective
action program and non-corrective
action program) associated with each of the selected components for the last
6 years. 2. The maintenance history (corrective, preventive, predictive, and elective) associated with each of the selected components for
the last 10
years. Identify frequency of any periodic maintenance activities.
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and
vendor letters).
4. System Health Reports, System Descriptions, Design Basis Documents, System Notebooks, and/or Training Lesson Plans associated with each of the selected components. 5. A list of modifications, including equivalency evaluations and set
point changes, associated with each of the selected components. This list should include a descriptive paragraph on the purpose of the modification. Please ensure this list only includes design completed (not canceled) modifications.
6. Copies of operability evaluations (open/closed for last 3 years) associated with each of the selected components and plans for restoring operability, if applicable.
7. Copies of selected operator work
-around related evaluations associated with each of the selected components and plans for resolution, if applicable.
8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
4 9. Trend data on the selected electrical/mechanical components' performance for last
3 years (For example, pumps' performance including in
-service testing, other vibration monitoring, oil sample results, etc., for valves:
stroke time and leak rate results, diagnostic trend data, etc.). 10. Provide copies of the normal and abnormal operating
procedures associated with the selected components and selected scenarios.
11. List of completed timed time critical or risk-significant operator actions
associated the with components
for the last 5 years. Identify those actions that do not have job performance measures.
12. Copy of latest completed tests and surveillances for each component
, for example:
a. Pumps: comprehensive test, quarterly test, flow balance, etc.
b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc. c. Heat Exchangers/room coolers
- thermal performance, clean/inspect, fan flows, etc.
d. Components:
Technical Specification surveillances.
e. Acceptance criteria basis calculations should also be included. 13. For each of the selected modifications, copies of associated
documents such as modification package, engineering changes, 50.59 screening or evaluation, calculations, post
-modification test packages, corrective action documents, design drawings, preventive maintenance requirements and procedures, etc. 14. A copy of any internal/external self
-assessments and associated corrective action documents generated within the last 3 years including any assessment in response to preparation for the inspection
. 15. A copy of engineering/operations related audits completed in the last 3
years. III. Additional Information to be
Provided on March 11, 2019
, On site (for final selected components
and modifications) 1. During the in
-office preparation activities, the team will
be making final selections and may identify additional information needed to support the inspection. The team will provide a list of the additional information needed during the week of March 4, 2019.
2. Schedule of any testing/maintenance activities to be conducted on the selected components during the t
wo onsite inspection weeks.
IV. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
5 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily by 2:00 p.m. during the inspection to each team member)
. 3. One complete set of Piping and Instrumentation Drawing
s (paper copies , large enough to be easily readable
). 4. Reference materials. (make available if needed during all onsite weeks):
a. Individual Plant Examination
/Probabilistic Risk Assessment
report; b. Procurement documents for components and modifications selected; c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
d. Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.