Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML082470286 | | | number = ML080610013 |
| | issue date = 09/02/2008 | | | issue date = 03/03/2008 |
| | title = Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001) | | | title = Calvert Cliffs, (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8 |
| | author name = Dentel G T | | | author name = Lew D C |
| | author affiliation = NRC/RGN-I/DRP/PB1 | | | author affiliation = NRC/RGN-I/DRP |
| | addressee name = Spina J A | | | addressee name = Spina J A |
| | addressee affiliation = Constellation Generation Group | | | addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc |
| | docket = 05000317, 05000318 | | | docket = 05000317, 05000318 |
| | license number = DPR-053, DPR-069 | | | license number = DPR-053, DPR-069 |
Line 12: |
Line 12: |
| | case reference number = IR-08-001 | | | case reference number = IR-08-001 |
| | document type = Inspection Plan, Letter | | | document type = Inspection Plan, Letter |
| | page count = 6 | | | page count = 7 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::September 2, 2008]] | | [[Issue date::March 3, 2008]] |
|
| |
|
| Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc. Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 | | Mr. James A. Spina, Vice President |
|
| |
|
| SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2008001 AND 05000318/2008001) | | Calvert Cliffs Nuclear Power Plant, Inc. |
| | |
| | Constellation Generation Group, LLC |
| | |
| | 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 |
| | |
| | SUBJECT: ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORTS 05000317/2008001 AND 05000318/2008001) |
|
| |
|
| ==Dear Mr. Spina:== | | ==Dear Mr. Spina:== |
| On August 6, 2008, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | | On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. |
| | |
| | This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan. |
| | |
| | Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter |
| | |
| | was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. |
|
| |
|
| This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
| | While plant performance for the most recent quarter was within the Licensee Response column of the Action Matrix, Calvert Cliffs Unit 1 was within the Regulatory Response column of the Action Matrix during the first two quarters of the assessment cycle, based on one finding of low to moderate safety significance (White) identified in September 2006. The White finding involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency diesel generator. The NRC has completed a supplemental inspection in accordance with |
|
| |
|
| Plant performance for the most recent quarter at Calvert Cliffs Units 1 and 2 was within the Licensee Response column of the NRC
| | inspection procedure 95001. The results of that inspection were provided in NRC Supplemental Inspection Report 05000317/2007006. As a result of that review, this finding was closed and no longer considered for plant assessment purposes, effective July 1, 2007. |
| =s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
| |
|
| |
|
| The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. | | The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its |
| =s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
| |
|
| |
|
| Sincerely,/RA Original Signed By:/
| | enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Glenn T. Dentel, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DRP-53, DRP-69
| |
|
| |
|
| ===Enclosure:===
| | If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233, with any questions you may have regarding this letter or the inspection plan. |
| Calvert Cliffs Nuclear Power Plant Inspection/ Activity Plan ccw/encl. M. Wallace, Vice-Chairman, Constellation Energy H. Barron, President, CEO, & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC W. Parran, President, Calvert County Board of Commissioners C. Fleming, Esquire, Sr. Counsel - Nuclear Generation Group, LLC J. Gaines, Director, Licensing, Calvert Cliffs Nuclear Power Plant S. Gray, Program Manager, Power Plant Assessment Program, Maryland Department of Natural Resources K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Coalition R. Hickok, NRC Technical Training Center L. Larragoite, Manager, Nuclear Safety and Secu rity, Calvert Cliffs Nuclear Power Plant G. Detter, Manager, Nuclear Safety and Security, Constellation Energy M. Griffen, Maryland Department of the Environment S. Pattison, SLO (2 Calvert Cliffs 2 Inspection / Activity Plan 08/01/2008
| |
| -12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2008 14:20:34 Report 22 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 08/25/2008 08/29/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 08/25/2008 08/29/2008 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 2 7112103 IP Baseline Inspections Performance Indicator Verification 08/25/2008 08/29/2008 2 71151 IP 2 TI 176-TI 176 Generic Safety Inspecti o Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 09/22/2008 09/26/2008 2 2515/176 IP 1 7111107T-HEAT SINK Baseline Inspections Heat Sink Performance 10/20/2008 10/24/2008 2 7111107T IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 11/03/2008 11/07/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 11/03/2008 11/07/2008 2 7112102 IP Baseline Inspections Performance Indicator Verification 11/03/2008 11/07/2008 2 71151 IP 1 TI 172-TI 172 RCS DISSIMILAR METAL BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 2 2515/172 IP 2 EP-EP PROGRAM INSP EP Baseline Inspection A lert and Notification System Testing 11/17/2008 11/21/2008 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 2 7111405 IP Baseline Inspections Drill/Exercise Performance 11/17/2008 11/21/2008 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 11/17/2008 11/21/2008 2 71151-EP02 IP Baseline Inspections A lert & Notification System 11/17/2008 11/21/2008 2 71151-EP03 IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 01/19/2009 01/23/2009 2 7112101 IP Baseline Inspections A LARA Planning and Controls 01/19/2009 01/23/2009 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/19/2009 01/23/2009 2 7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/19/2009 01/23/2009 2 71151-OR01 IP 1 7111108P-U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 02/23/2009 02/27/2009 2 7111108P IP Baseline Inspections Inservice Inspection Activities - PWR 03/02/2009 03/06/2009 2 7111108P IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 03/02/2009 03/06/2009 2 7112101 IP Baseline Inspections A LARA Planning and Controls 03/02/2009 03/06/2009 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 03/02/2009 03/06/2009 2 7112103 IP This report does not include INPO and OUTAGE activities.
| |
|
| |
|
| This report shows only on-site and announced inspection procedures.
| | Sincerely,/RA/ David C. Lew, Director Division of Reactor Projects |
|
| |
|
| Calvert Cliffs 2 Inspection / Activity Plan 08/01/2008
| | Region I Docket Nos. 50-317, 50-318 |
| -12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2008 14:20:34 Report 22 1 71121-OCC RAD SAFETY Baseline Inspections Occupational Exposure Control Effectiveness 03/02/2009 03/06/2009 2 71151-OR01 IP 1 TI-172-U2 TI-172 RCS DISSIMIILAR METAL WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 03/02/2009 03/06/2009 2 2515/172 IP 1 7112202-PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 06/15/2009 06/19/2009 2 7112202 IP 6 7111121-CDBI Baseline Inspections Component Design Bases Inspection 08/03/2009 08/07/2009 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/17/2009 08/21/2009 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/24/2009 08/28/2009 2 7111121 IP 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 2 7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 08/03/2009 08/07/2009 2 71151-PR01 IP 3 7111111B-BIENNIAL REQUAL INSP WITH P/F RESULTS Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 2 7111111B IP 2 EP EXER-EP EXERCISE INSPECTION EP Baseline Inspection Exercise Evaluation 10/18/2009 10/24/2009 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/18/2009 10/24/2009 2 7111404 IP Baseline Inspections Drill/Exercise Performance 10/18/2009 10/24/2009 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/18/2009 10/24/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 10/18/2009 10/24/2009 2 71151-EP03 IP 4 71152B-PI&R BIENNIAL TEAM Baseline Inspections Identification and Resolution of Problems 11/02/2009 11/06/2009 2 71152B IP Baseline Inspections Identification and Resolution of Problems 11/16/2009 11/20/2009 2 71152B IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 12/07/2009 12/11/2009 2 7112101 IP Baseline Inspections A LARA Planning and Controls 12/07/2009 12/11/2009 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/07/2009 12/11/2009 2 7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 12/07/2009 12/11/2009 2 71151-OR01 IP This report does not include INPO and OUTAGE activities.
| |
|
| |
|
| This report shows only on-site and announced inspection procedures.
| | License Nos. DPR-53, DPR-69 |
|
| |
|
| Calvert Cliffs 1 Inspection / Activity Plan 08/01/2008 | | ===Enclosure:=== |
| -12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2008 14:20:02 Report 22 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 08/25/2008 08/29/2008 1 7112101 IP Baseline Inspections A LARA Planning and Controls 08/25/2008 08/29/2008 1 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 1 7112103 IP Baseline Inspections Performance Indicator Verification 08/25/2008 08/29/2008 1 71151 IP 1 ISFSI-ISFSI - ANNUAL SAMPLE Other Routine Operation Of An ISFSI 08/25/2008 08/29/2008 1 60855 IP 2 TI 176-TI 176 Generic Safety Inspecti o Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 09/22/2008 09/26/2008 1 2515/176 IP 1 7111107T-HEAT SINK Baseline Inspections Heat Sink Performance 10/20/2008 10/24/2008 1 7111107T IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 11/03/2008 11/07/2008 1 7112101 IP Baseline Inspections A LARA Planning and Controls 11/03/2008 11/07/2008 1 7112102 IP Baseline Inspections Performance Indicator Verification 11/03/2008 11/07/2008 1 71151 IP 1 TI 172-TI 172 RCS DISSIMILAR METAL BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 1 2515/172 IP 2 EP-EP PROGRAM INSP EP Baseline Inspection A lert and Notification System Testing 11/17/2008 11/21/2008 1 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 1 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 1 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 1 7111405 IP Baseline Inspections Drill/Exercise Performance 11/17/2008 11/21/2008 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 11/17/2008 11/21/2008 1 71151-EP02 IP Baseline Inspections A lert & Notification System 11/17/2008 11/21/2008 1 71151-EP03 IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 01/19/2009 01/23/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 01/19/2009 01/23/2009 1 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/19/2009 01/23/2009 1 7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/19/2009 01/23/2009 1 71151-OR01 IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 03/02/2009 03/06/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 03/02/2009 03/06/2009 1 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 03/02/2009 03/06/2009 1 7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/02/2009 03/06/2009 1 71151-OR01 IP This report does not include INPO and OUTAGE activities.
| | Calvert Cliffs Inspection / Activity Plan |
|
| |
|
| This report shows only on-site and announced inspection procedures.
| | cc w/encl: |
| | M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer |
|
| |
|
| Calvert Cliffs 1 Inspection / Activity Plan 08/01/2008 | | President, Calvert County Board of Commissioners |
| -12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2008 14:20:02 Report 22 2 ISFSI-ISFSI INSPECTION - ANNUAL SAMPLE Other Routine Operation Of An ISFSI 04/01/2009 06/30/2009 1 60855 IP 1 7112202-PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 06/15/2009 06/19/2009 1 7112202 IP 6 7111121-CDBI Baseline Inspections Component Design Bases Inspection 08/03/2009 08/07/2009 1 7111121 IP Baseline Inspections Component Design Bases Inspection 08/17/2009 08/21/2009 1 7111121 IP Baseline Inspections Component Design Bases Inspection 08/24/2009 08/28/2009 1 7111121 IP 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/03/2009 08/07/2009 1 7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 08/03/2009 08/07/2009 1 71151-PR01 IP 3 7111111B-BIENNIAL REQUAL INSP WITH P/F RESULTS Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 1 7111111B IP 2 EP EXER-EP EXERCISE INSPECTION EP Baseline Inspection Exercise Evaluation 10/18/2009 10/24/2009 1 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/18/2009 10/24/2009 1 7111404 IP Baseline Inspections Drill/Exercise Performance 10/18/2009 10/24/2009 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/18/2009 10/24/2009 1 71151-EP02 IP Baseline Inspections A lert & Notification System 10/18/2009 10/24/2009 1 71151-EP03 IP 4 71152B-PI&R BIENNIAL TEAM Baseline Inspections Identification and Resolution of Problems 11/02/2009 11/06/2009 1 71152B IP Baseline Inspections Identification and Resolution of Problems 11/16/2009 11/20/2009 1 71152B IP 1 71121-OCC RAD SAFETY Baseline Inspections A ccess Control to Radiologically Significant Areas 12/07/2009 12/11/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 12/07/2009 12/11/2009 1 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/07/2009 12/11/2009 1 7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 12/07/2009 12/11/2009 1 71151-OR01 IP This report does not include INPO and OUTAGE activities.
| |
|
| |
|
| This report shows only on-site and announced inspection procedures.
| | C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Pattison, SLO (2) |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) ML23047A1022023-02-16016 February 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000317/2023401 and 05000318/2023401 ML23040A0102023-02-0909 February 2023 Notification of Commercial Grade Dedication Inspection (05000317/2023012 and 05000318/2023012) and Request for Information IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request IR 05000317/20200062021-03-0303 March 2021 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2020006 and 05000318/2020006) ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 IR 05000317/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000317/2020005 and 05000318/2020005) ML20154K4602020-06-0202 June 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20190062020-03-0303 March 2020 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2019006 and 05000318/2019006) IR 05000317/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000317/2019005 and 05000318/2019005) ML19141A1242019-05-21021 May 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000317/20180062019-03-0404 March 2019 Annual Assessment Letter for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2018006 and 05000318/2018006) ML18348A4812018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000317/2019403 and 05000318/2019403 IR 05000317/20180052018-08-28028 August 2018 Updated Inspection Plan: Inspection Report 05000317/2018005 and 05000318/2018005 IR 05000317/20170062018-02-28028 February 2018 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501) IR 05000317/20170052017-08-28028 August 2017 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Inspection Report 05000317/2017005 and 05000318/2017005 IR 05000317/20160062017-03-0101 March 2017 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2016006 and 05000318/2016006) IR 05000317/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Report 05000317/2016005 and 05000318/2016005 IR 05000317/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) IR 05000317/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2015005 and 05000318/2015005) IR 05000317/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, (Report 05000317/2014001 and 05000318/2014001)(w/Inspection Plan) IR 05000317/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006) ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 IR 05000317/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2013001 and 05000318/2013001) (W/Inspection Plan) ML13267A0052013-09-23023 September 2013 Requal Program Inspection 60 Day Letter IR 05000317/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-13-006 and 05000318-13-006) IR 05000317/20120012013-03-0404 March 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (Report 05000317-12-001 and 05000318-12-001) ML12244A2032012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20110012012-03-0505 March 2012 Annual Assessment Letter(Report 05000317/2011001 and 05000318/2011001) ML1124208652011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20100012011-03-0404 March 2011 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant-05000317/2010001 and 05000318/2010001 ML1031402312010-11-10010 November 2010 Pre-Inspection Cover Sheet and Inspection Plan (12/6/10 - 12/10/10) ML1024402082010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Calvert Cliffs Nuclear Power Plant ML1016600082010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/7 - 6/11/10) ML1006208092010-03-0303 March 2010 Annual Assessment Letter ML0924402772009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant, Dated 09/01/2009 IR 05000317/20090012009-03-0404 March 2009 IR 05000317-09-001 and 05000318-09-001, on 01/01/2009 - 12/31/2008, Calvert Cliffs Nuclear Power Plant Annual Assessment Report IR 05000317/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001) ML0806100132008-03-0303 March 2008 (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8 ML0734707242007-12-13013 December 2007 ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant ML0724309302007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant IR 05000317/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Calvert Cliffs Station (IR 05000317-07-001 and 05000318-07-001) ML0624304482006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant ML0606203372006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Calvert Cliffs Nuclear Power Plant (Report 05-317/2006001 and 05-318/2006001) ML0524206942005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Calvert Cliffs 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
March 3, 2008
Mr. James A. Spina, Vice President
Calvert Cliffs Nuclear Power Plant, Inc.
Constellation Generation Group, LLC
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT: ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORTS 05000317/2008001 AND 05000318/2008001)
Dear Mr. Spina:
On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.
Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter
was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
While plant performance for the most recent quarter was within the Licensee Response column of the Action Matrix, Calvert Cliffs Unit 1 was within the Regulatory Response column of the Action Matrix during the first two quarters of the assessment cycle, based on one finding of low to moderate safety significance (White) identified in September 2006. The White finding involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency diesel generator. The NRC has completed a supplemental inspection in accordance with
inspection procedure 95001. The results of that inspection were provided in NRC Supplemental Inspection Report 05000317/2007006. As a result of that review, this finding was closed and no longer considered for plant assessment purposes, effective July 1, 2007.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233, with any questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/ David C. Lew, Director Division of Reactor Projects
Region I Docket Nos. 50-317, 50-318
License Nos. DPR-53, DPR-69
Enclosure:
Calvert Cliffs Inspection / Activity Plan
cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer
President, Calvert County Board of Commissioners
C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Pattison, SLO (2)