ML17291A800: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/30/1995
| issue date = 04/30/1995
| title = Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
| title = Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
| author name = EMBREE D G, PARRISH J V
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:19, 18 June 2019

Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
ML17291A800
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-092, GO2-95-92, NUDOCS 9505180272
Download: ML17291A800 (6)


Text

I~RIORITY CELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSXON NBR:9505180272 DOC.DATE: 95/04/30 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington.Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Apr 1995 for WNP-2.W/950510 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR lENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES SIZE: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AC ,F LE CENTER RRQ DOPS/OECS EXTERNAL LI TCO BRYCE I J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DIS P/PIPB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP VS TO REDUCE O'KSTE!CONTACT I'HE DOCL'ifE4TCONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELl nfl.'PATE YOUR N'Aif E I'ROif DISTRIBUTIOY LIS'I'S I:OR DOCL'5 IEN'I'S YOL'Oi'"I'LTI'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 May 10, 1995 G02-95-092 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT APRIL 1995 Transmitted herewith is the Monthly Operating Report for the month of April, 1995 as required by Technical Specification 6.9.1.6.Sincerely, J..Parrish (Mai Drop 1023)ice-President, Nuclear Operations JVP:DGE CC: LJ Callen, NRC RIV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA-(399)!9505180272 950430'DR ADQCK'05000397 R'"'"'PDR REPORT PERIOD: APRIL 1995 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:

(509)3774448~,~g'o.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-04 4/5/95 F 152.4 A 95-006 HA INSTRU Relay failure caused turbine trip and automatic scram during monthly surveillance testing.Relay replaced.95-05 4/22/95 S 206.0 C N/A RC FUELXX Plant entered annual refueling and maintenance outage (R-10)on April 22.

SUMMARY

At the beginning of the month the plant was operating at full power.Qn April 5, the plant experienced an automatic scram resulting in about'6 days of forced outage.Following the forced outage, the plant restarted and operated an additional 11 days then plant shutdown for the annual refueling outage on April 22.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG%161 Exhibits F&H AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: APRIL 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 May 1, 1995 D.G.Embree (509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe), 7 10 12 13 14 15 1079 1108 1107 1101 453-16-13-13-13 13 396 1031 960 1100 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1097 1092 1094 1095 1093 942 57-14-14-16-16-14-13*-12-12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~" r t.4

~4'I PERATING STATUS REPOR for WNP-2 Date: May 1, 1995 2.3.4.5.6.7.8.9.3323 1200.9 1120 1132 1086 N/A Docket: 50-397 Reporting Period: APRIL 1995 Outage+On-Line Hours: 719.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.Power to which restricted, if any (Net MW,): None 11.Reasons for restrictions, if any: 12.Report Period Hours 13.Hours Reactor Critical 14.Rx Reserve Shutdown Hours 15.Hours Generator On-Line 16.Unit Reserve Shutdown Hours 17.Gross Thermal Energy (MWH)18.Gross Electrical Energy (MWH)19.Net Electrical Energy (MWH)20.Unit Service Factor 21.Unit Availability Factor 22.Unit Capacity Factor (MDC Net)23.Unit Capacity Factor (DER Net)24.Unit Forced Outage Rate 25.Forced Outage Hours MONTH 719.0 392.9 0,0 360.7 0.0 1,086,196 368,200 350,163 50.2%50.2%44.8%43.5%29.7%152.4 YEAR 2,879.0 2,404.3 0.0 2,324.5 0.0 7,404,028 2,553,980 2,451,795 80.7%80.7%78.4%76.0%13.0%348.6 CUMULATIVE 90,967.2 65,104.9 340,4 62,892.1 381.7 186,666,868 62,907,480 60,276,929 69.1%69.6%60.7%60.0%11.7%8,319.7 27.If currently shutdown, estimated startup date: 26.Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling, April 22, 1995, 42 days.May 31, 1995 Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.