ML17292A933

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
ML17292A933
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, GO2-97-142, NUDOCS 9707220092
Download: ML17292A933 (7)


Text

fy CATEGORY 1 REGULRT INFORMATION DISTRIBUTIONSTEM (RIDE)

ACCESSION NBR:9707220092 DOC.DATE: 97/06/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAPE AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT. AFFILIATION

SUBJECT:

Monthly operating rept for June 1997 for WNP-2.W/970715 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL ~ SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL:~ACRS~ 1 1 AEOD/SPD/RRAB 1 1

(+FILE CENTER,O 1~ 1 1 NRR/DRPM/PECB 1 1 1 1 RGN4 1 1 OC/DBA'/PAD'XTERNAL:

LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 f

C' WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.

In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.

Respectfully, G. 0, Smith Plant General Manager Mail Drop 9270 CC: EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

~An ~

c

-4,9707220092 970630 lllilllllllllllllllll'Illllllllllll!

PDR ADQCK 0500039'7 R PDR J

OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997

1. Docket: 50-397
2. Reporting Period: JUNE 1997 3, Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153 5.. Maximum Dependable Capacity - summer (Gross MW,): 1153 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 0.0 2,049.2 77,921.8
7. Hours Generator On-Line 0.0 2,049.2 75,299.3
8. Unit Reserve Shutdown Hours 696.0 1,248.0 3,204.2
9. Net Electrical Energy (MWH) -8,485 1,699,500 72,007,775
10. Challenges to safety/relief valves; See Attached Table

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JUNE 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 97-012 970419 720.0 Plant entered annual refueling and maintenance outage (R-12) on April 19, 1997.

SUMMARY

The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.

~lREAS ON ~2METHOD A - Equipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

SRV CHALLENGES DATE TYPE REASO MS-RV-1B 6/17/97 B C MS-RV-1D 6/17/97 B C MS-RV-2A 6/17/97 B C MS-RV-2B 6/17/97 B C MS-RV-2D 6/17/97 B C

'S-RV-3A 6/17/97 B C MS-RV-4A 6/17/97 B C MS-RV-4C 6/17/97 B C MS-RV-4D 6/17/97 B C MS-RV-5C 6/17/97 B C e of Actuation Reason A = Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)

E = Manual Relief All of the MSRVs functioned normally. There were no other MSRV challenges during the period.