Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
ML17292B134
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-220, NUDOCS 9712150118
Download: ML17292B134 (6)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9712150118 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AU'fH.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.E. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1997 for WNP-2.W/971205 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 OC/DBA/PAD 1 1 N4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF. COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

e 0 1

'e ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.

Respectfully, pp(~) g f$ PAWICN G. O. Smith Plant General Manager Mail Drop 927M CC: EW Merschoff - NRC RIV TG Colburn - NRR C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO

+8&

NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 399 i r. ~r.~ Illlffflllfllllllllllfflllllllllllllll'

- ~97i2i50iia 9'7ii30 PDR ADQCK 05000897 R PDR

OPERATING STATUS REPORT for WNP-2 Date: December 1, 1997 Docket: 50-397

2. Reporting Period: NOVEMBER 1997
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 720.0 5,628.7 81,501.3
7. Hours Generator On-Line 720.0 5,504.9 78,755.0
8. Unit Reserve Shutdown Hours 0.0 1,081.3 3,037.5
9. Net Electrical Energy (MWH) 818,029 5,261,075 75,569,350
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: NOVEMBER 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

l REASON 2 METHOD A- u>pment Failure E - Operator Training & 1 - anua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 ~- ~