ML17292B110

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr
ML17292B110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-205, NUDOCS 9711180204
Download: ML17292B110 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9711180204 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET FACIL:50~397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.MME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1997 for WNP-2.W/971111 ltr.

DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL " SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 0

1 AEOD/SPD/RRAB 1 1 ENTE 01 1 1 NRR/DRPM/PECB 1 1 BA' 1 1 RGN4 1 1 EZTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

t gl Cy P

4 I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 November 11, 1997 r

G02-97-205 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month of October 1997 as required. by'.Technical Specification 5.6.4.

~,

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc: EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute,

" "-"'DL"Williams -'BPA /;399 9'7iii80204 97iQSi IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR .'ADQCK 05000397 I'

PDR

I v ~

A k ll

OPERATING STATUS REPORT for WNP-2 Date: November 1, 1997 Docket: 50-397

2. Reporting Period: OCTOBER 1997,
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744,0 4,907.7 80,780.3
7. Hours Generator On-Line 744.0 4,783.9 78,034.0
8. Unit Reserve Shutdown Hours 0.0 1,081.3 3,037.5 9 Net Electrical Energy (MWH) 699,834 4,443,046 74,751,321
10. Challenges to safety/relief valves: None

E<<

I 4

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: OCTOBER 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence None SMBrIARY: At the end of the month WNP-2 was operating at 100% power.

~lREASON 2 METHOD A - Equipment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

o I) a= 4