ML17292A407

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1996 for WNP-2.W/960807 Ltr
ML17292A407
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-156, NUDOCS 9608160272
Download: ML17292A407 (12)


Text

REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS) "

ACCESSION NBR 9+508160272 o DOC DATE 96/07/3 1

~ ~ NOTARIZED i NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME -

AUTHOR AFFILIATION KASKO,B. 'ashington Public Power Supply System SMITHEG.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jul 1996 for WNP-2.W/960807 ltr.

DISTRIBUTION CODE: E24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL l SIZE:

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURNRT 1 '1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 1 NRR/DRPM/PECB 1 1 1 1 Y

EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 D

p N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(

TOTAL NUMBER OF COPIES REQUIRED:: LTTR 1'0 ENCL', '10

p I

I

1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 August 7, 1996 G02-96-156 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

1

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JULY 1996 Transmitted herewith is the Monthly Operating Report for the month of July 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 CC: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399 9608i60272 96073i 05000397 PDR ADOCK 3.8008~

C p I l'

OPERATING STATUS REPORT for WNP-2 Date: August 1, 1996 Docket: 50-397

2. Reporting Period: JULY 1996 Outage + On-line Hours: 744.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107 9, Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 5,111.0 101,959.2
13. Hours Reactor Critical 744.0 2,563.8 72,199.6
14. Rx Reserve Shutdown Hours 0.0 985.9 1,730.8
15. Hours Generator On-Line 744.0 2,326.6 69,577.1
16. Unit Reserve Shutdown Hours 0.0 997.4 1,956.2
17. Gross Thermal Energy (MWH) 1,592,405 6,139,108 206,596,658
18. Gross Electrical Energy (MWH) 507,380 2,030,650 69,608,130
19. Net Electrical Energy (MWH) 482,316 1,917,419 66,675,737
20. Unit Service Factor 100.0% 45.5% 68.2%
21. Unit Availability Factor 100.0% 65.0% 70.2%
22. Unit Capacity Factor (MDC Net) 58.6% 33.9% 59.9%
23. Unit Capacity Factor (DER Net) 56.2% 32.5% 59.0%
24. Unit Forced Outage Rate 0.0% 5.0% 10.8%
25. Forced Outage Hours 0.0 123.3 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): None
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.

t r

s,. I H>> II II.

II

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: August 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JULY 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 440 16 637 17 584 18 653 595 19 658 597 20 704 595 21 733 591 22 718 584 23 684 577 24 719 10 577 25 716 657 26 714 12 653 27 715 13 28 714 14 572 29 708 15 623 30 715 31 725 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

E f

J 1

Ir ~

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NOat 50-397 UNIT NAME: WNP-2 DATE: August I, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JULY 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

WNP-2 ramped up to 68% power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems. At the end of the month WNP-2 was operting at 68% power and-continuing with t

startup following the refueling outage.

TYPE REASON METHOD SYSTEM Sc COMPONENT P - Forced AAqu>pmeur Failure E - Operator Training & I -M~~l GQl 1E its S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G- rational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

I t'

WASHINGTON PUELIC POWER SUPPLY SYSTEM REGULATORY COMMITMENTIDENTIFICATIONFORM (FOR INTERNALDISTRIBUTION ONLY)

Regulatory Agency Licensing Engineer Document Author/Reviewer NRC B Kasko B Kasko Driving Document/Letter Document Date Related Documents G02-96-156 Drivin Document:

Driving Document Description I LTR 8/7/96 Q REGR Q INSP Q EMC Q OTHER Monthly Operating Report - July Commitment: None Cod~: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTL Number QAOR Assigned to Supvr. Name (print) Supvn Signature Commitment:

Cod~: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTL Number QA Oft Assigned to Supvr. Name (print) Supvr. Signature Commitment:

Codes: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTL Number OAQR Assigned to Supvr. Name (print) Supvr. Signature 966.25260 R3 DRAFT I06/04/96I Doc Type: CODES: PTL Number:

LTR - Letter REG - Regulatory A - Active EMC - Exit Meeting Commitment HD - Firm date given to reg agency R - Recurring REGR - Regulatory Requirement RXSU - Reactor start up issue INSP - Made during NRC Inspection OT - Specific outage, e.g., OT97 OT-F - Forced outago

0

~ ~i hi 1