Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
ML17291A800
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-092, GO2-95-92, NUDOCS 9505180272
Download: ML17291A800 (6)


Text

I ~

RIORITY CELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR:9505180272 DOC.DATE: 95/04/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington .Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1995 for WNP-2.

W/950510 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR lENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: AC 10 10 AEOD/SPD/RRAB 1 1

,F LE CENTER 1 1 NRR/DIS P/PIPB 1 1 RRQ DOPS/OECS 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP VS TO REDUCE O'KSTE! CONTACT I'HE DOCL'ifE4TCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELl nfl.'PATE YOUR N'AifE I'ROif DISTRIBUTIOYLIS'I'S I:OR DOCL'5 IEN'I'S YOL'Oi'"I'LTI'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 May 10, 1995 G02-95-092 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1995 Transmitted herewith is the Monthly Operating Report for the month of April, 1995 as required by Technical Specification 6.9.1.6.

Sincerely, J.. Parrish (Mai Drop 1023) ice-President, Nuclear Operations JVP:DGE CC: LJ Callen, NRC RIV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA- (399)

! 9505180272 ADQCK '05000397 950430'DR R ' " '"'PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS

~, ~

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1995 COMPLETED BY: D.G. Embree g'o.

TELEPHONE: (509) 3774448 REPORT PERIOD: APRIL 1995 Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-04 4/5/95 F 152.4 A 95-006 HA INSTRU Relay failure caused turbine trip and automatic scram during monthly surveillance testing. Relay replaced.

95-05 4/22/95 S 206.0 C N/A RC FUELXX Plant entered annual refueling and maintenance outage (R-10) on April 22.

SUMMARY

At the beginning of the month the plant was operating at full power. Qn April 5, the plant experienced an automatic scram resulting in about'6 days of forced outage. Following the forced outage, the plant restarted and operated an additional 11 days then plant shutdown for the annual refueling outage on April 22.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: May 1, 1995 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: APRIL 1995 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1079 16 1097 1108 17 1092 1107 18 1094 1101 19 1095 453 20 1093

-16 21 942

, 7 22 57

-13 23 -14

-13 24 -14 10 -13 25 -16 13 26 -16 12 396 27 -14 13 1031 28 -13 14 960 29 -12 15 1100 30 -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~"

r t.

4

PERATING STATUS REPOR

~ 4 'I for WNP-2 Date: May 1, 1995 Docket: 50-397

2. Reporting Period: APRIL 1995 Outage + On-Line Hours: 719.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132
8. Maximum Dependable Capacity (Net MW, ): 1086
9. If changes occur above since last report, give reasons: N/A
10. Power to which restricted, if any (Net MW,): None
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 719.0 2,879.0 90,967.2
13. Hours Reactor Critical 392.9 2,404.3 65,104.9
14. Rx Reserve Shutdown Hours 0,0 0.0 340,4
15. Hours Generator On-Line 360.7 2,324.5 62,892.1
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 1,086,196 7,404,028 186,666,868
18. Gross Electrical Energy (MWH) 368,200 2,553,980 62,907,480
19. Net Electrical Energy (MWH) 350,163 2,451,795 60,276,929
20. Unit Service Factor 50.2% 80.7% 69.1%
21. Unit Availability Factor 50.2% 80.7% 69.6%
22. Unit Capacity Factor (MDC Net) 44.8% 78.4% 60.7%
23. Unit Capacity Factor (DER Net) 43.5% 76.0% 60.0%
24. Unit Forced Outage Rate 29.7% 13.0% 11.7%
25. Forced Outage Hours 152.4 348.6 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, April 22, 1995, 42 days.
27. Ifcurrently shutdown, estimated startup date: May 31, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.