Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARGO2-99-180, Monthly Operating Rept for Sept 1999 for WNP-2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With GO2-99-170, Monthly Operating Rept for Aug 1999 for WNP-2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr GO2-99-156, Monthly Operating Rept for July 1999 for WNP-2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With GO2-99-124, Monthly Operating Rept for June 1999 for WNP-2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr GO2-99-106, Monthly Operating Repts for May 1999 for WNP-2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With GO2-99-089, Monthly Operating Rept for Apr 1999 for WNP-2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr GO2-99-069, Monthly Operating Rept for Mar 1999 for WNP-2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With GO2-99-048, Monthly Operating Rept for Feb 1999 for WNP-2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr GO2-99-028, Monthly Operating Rept for Jan 1999 for WNP-2.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr GO2-99-006, Monthly Operating Rept for Dec 1998 for WNP-2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With GO2-98-204, Monthly Operating Rept for Nov 1998 for WNP-2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr GO2-98-188, Monthly Operating Rept for Oct 1998 for WNP-2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With GO2-98-174, Monthly Operating Rept for Sept 1998 for WNP-2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With GO2-98-166, Monthly Operating Rept for Aug 1998 for WNP-2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With GO2-98-144, Monthly Operating Rept for July 1998 for WNP-21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2 GO2-98-119, Monthly Operating Rept for June 1998 for WNP-21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for WNP-2 GO2-98-096, Monthly Operating Rept for May 1998 for WNP-21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2 GO2-98-083, Monthly Operating Rept for Apr 1998 for WNP-21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2 ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr GO2-98-069, Monthly Operating Rept for Mar 1998 for WNP-21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2 GO2-98-055, Monthly Operating Rept for Feb 1998 for WNP-21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2 GO2-98-028, Monthly Operating Rept for Jan 1998 for WNP-21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2 ML17292B2471998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2.W/980212 Ltr GO2-98-007, Monthly Operating Rept for Dec 1997 for WNP-21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for WNP-2 GO2-97-220, Monthly Operating Rept for Nov 1997 for WNP-21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2 ML17292B1341997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr GO2-97-205, Monthly Operating Rept for Oct 1997 for WNP-21997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2 ML17292B1101997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr ML17292B0851997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2.W/971010 Ltr GO2-97-188, Monthly Operating Rept for Sept 1997 for WNP-21997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2 ML17292B0511997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for WNP-2 GO2-97-152, Monthly Operating Rept for Jul 1997 for WNP-21997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2 ML17292A9611997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2.W/970807 Ltr ML17292A9331997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr GO2-97-142, Monthly Operating Rept for June 1997 for WNP-21997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2 ML17292A8971997-05-31031 May 1997 Monthly Operating Rept for May 1997 for WNP-2 ML17292A8531997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for WNP-2 GO2-97-070, Monthly Operating Rept for Mar 1997 for WNP-21997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for WNP-2 ML17292A8561997-03-31031 March 1997 Corrected MOR for Mar 1997 for WNP-2 GO2-97-048, Monthly Operating Rept for Feb 1997 for WNP-21997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for WNP-2 GO2-97-026, Monthly Operating Rept for Jan 1996 for WNP-21997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2 ML17292A7011997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With GO2-99-180, Monthly Operating Rept for Sept 1999 for WNP-2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With GO2-99-170, Monthly Operating Rept for Aug 1999 for WNP-2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With GO2-99-156, Monthly Operating Rept for July 1999 for WNP-2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17284A8331999-07-30030 July 1999 Safety Evaluation Supporting Proposed Alternative of Direct or Remote VT-1 Visual Exam of Pump Casing Welds Will Be Capable of Detecting Any Known Degradation in Carbon Steel Welds,Therefore Provides Assurance of Pressure Integrity ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr 05000397/LER-1999-001, :on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with1999-07-20020 July 1999
- on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with
ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr GO2-99-124, Monthly Operating Rept for June 1999 for WNP-2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With GO2-99-106, Monthly Operating Repts for May 1999 for WNP-2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr GO2-99-089, Monthly Operating Rept for Apr 1999 for WNP-2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr GO2-99-069, Monthly Operating Rept for Mar 1999 for WNP-2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With ML17292B6061999-03-25025 March 1999 Safety Evaluation Accepting Relief Request RV02 GO2-99-048, Monthly Operating Rept for Feb 1999 for WNP-2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr GO2-99-028, Monthly Operating Rept for Jan 1999 for WNP-2.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. LD-99-003, Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE1999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE LD-99-002, Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error1999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE GO2-99-006, Monthly Operating Rept for Dec 1998 for WNP-2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With GO2-99-041, WNP-2 1998 Annual Operating Rept. with1998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with GO2-98-211, Washington Public Power Supply Sys 1998 Annual Rept. with1998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr GO2-98-204, Monthly Operating Rept for Nov 1998 for WNP-2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr GO2-98-188, Monthly Operating Rept for Oct 1998 for WNP-2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 05000397/LER-1998-012, :on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With1998-10-27027 October 1998
- on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With
GO2-98-174, Monthly Operating Rept for Sept 1998 for WNP-2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998 ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr 05000397/LER-1998-013, :on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With1998-09-0303 September 1998
- on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With
05000397/LER-1998-014, :on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With1998-09-0202 September 1998
- on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With
ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr 05000397/LER-1998-015, :on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With1998-09-0202 September 1998
- on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With
GO2-98-166, Monthly Operating Rept for Aug 1998 for WNP-2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr GO2-98-144, Monthly Operating Rept for July 1998 for WNP-21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2 05000397/LER-1998-006, :on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes1998-07-23023 July 1998
- on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes
05000397/LER-1998-011, :on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted1998-07-17017 July 1998
- on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted
05000397/LER-1998-010, :on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP Tubing1998-07-15015 July 1998
- on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP Tubing
05000397/LER-1998-009, :on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation1998-07-0101 July 1998
- on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation
ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr GO2-98-119, Monthly Operating Rept for June 1998 for WNP-21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for WNP-2 ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULAT(
INFORMATION DISTRIBUTIONOCSTEM (RIDE)
ACCESSION NBR:9611190191 DOC.DATE: 96/10/31 NOTARIZED: NO DOCKET ¹ FACII;:5p-,.397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.IAIAME AUTHOR AFFILIATION KASKO,B.
Washington Public Power Supply System SMITH,G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly, operating rept for Oct 1996 for WNP-2 Operating License NPF-21.W/961011 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:
FILE CENTER 1
08/DBA/PAD EXTERNAL LITCO BRYCE IJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 0
R D
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
~
~
l
WASHINGTONPUBLIC POWER SUPPLY SYSTEM I'.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352-0968
~ (509) 372-5000 October 11, 1996 G02-96-223 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1996 Transmitted herewith is the Monthly Operating Report for the month of October 1996 as required by Technical Specification 6.9.1.6.
Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 cc:
LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DL Williams - BPA / 399 9biii90i9i 9b103i PDR ADOCK 05000397, R
PDR
IO 1
4 h I
h;
~ 4 'J
OPERATING STATUS REPORT for WNP-2 Date:
November 1, 1996 2.'.
4.
6.
7.
8.
9.
10.
11.
Outage + On-line Hours:
745.0 3486 1199 1153 1153 1107 none none Docket:
50-397 Reporting Period: OCTOBER 1996 UtilityContact:
Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW,):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity - summer (Gross MW,):
Maximum Dependable Capacity - summer (Net MW, ):
Ifchanges occur above since last report, give reasons:
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 745.0 745.0 0.0 745.0 0.0 2,432,864 822,140 793,218 100.0%
100.0%
96.2%
92.3%
0.0%
0.0 YEAR 7,320.0 4,772.8 985.9 4,535.6 997.4 12,400,967 4,103,520 3,907,623 62.0%
75.6%
48.3%
46.3%
2.6%
123.3 CUMULATIVE 104,168.2 74,408.6 1,730.8 71,786.1 1,956.2 212,858,517 71,681,000 68,665,941
,68.9%
70.8%
60.3%
59.4%
10.5%
8,443.0 26.
Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days 27.
Ifcurrently shutdown, estimated startup date; Note:
Cumulative Unit Capacity Factors (MDC&DER) are calculated with weighted averages.
t t
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:
OCTOBER 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: November 1, 1996 COMPLETED BY: B Knsko TELEPHONE: (509) 377M73 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)
AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1140 1143 1139 1131 1112 1137 1134 1133 1060 1006 892 639 890 1136 1142 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1143 1138 1123 1137 1130 1139 1145 1101 1042 1036 779 1024 1042 1049 1059 1087 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
~ I
~
fQ 4
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
OCTOBER 1996 DOCKET NOut 50-397 UNlT NAME.'NP-2 DATE: November 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96-12 10/11/96 S
Zero 96-13 10/26/96 F
Zero N/A N/A N/A N/A CH PUMPXX Reduced power to perform scram time testing, turbine valve testing and digital feedwater testing.
CB MOTORX Reduced power to perform maintenance on ASD channel 1A2.
SUMMARY
At the end of the month WNP-2 was operating at 100% power.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration 6 - Operational Error H - Other METHOD
~1-Menue 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT G41 1
ttsF&,
I p I A
II'