GO2-96-223, Monthly Operating Rept for Oct 1996 for WNP-2

From kanterella
(Redirected from ML17292A592)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for WNP-2
ML17292A592
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-223, NUDOCS 9611190191
Download: ML17292A592 (9)


Text

CATEGORY 1 REGULAT(

INFORMATION DISTRIBUTIONOCSTEM (RIDE)

ACCESSION NBR:9611190191 DOC.DATE: 96/10/31 NOTARIZED: NO DOCKET ¹ FACII;:5p-,.397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.IAIAME AUTHOR AFFILIATION KASKO,B.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly, operating rept for Oct 1996 for WNP-2 Operating License NPF-21.W/961011 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:

FILE CENTER 1

08/DBA/PAD EXTERNAL LITCO BRYCE IJ H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 0

R D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

~

~

l

WASHINGTONPUBLIC POWER SUPPLY SYSTEM I'.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352-0968

~ (509) 372-5000 October 11, 1996 G02-96-223 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1996 Transmitted herewith is the Monthly Operating Report for the month of October 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 cc:

LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DL Williams - BPA / 399 9biii90i9i 9b103i PDR ADOCK 05000397, R

PDR

IO 1

4 h I

h;

~ 4 'J

OPERATING STATUS REPORT for WNP-2 Date:

November 1, 1996 2.'.

4.

6.

7.

8.

9.

10.

11.

Outage + On-line Hours:

745.0 3486 1199 1153 1153 1107 none none Docket:

50-397 Reporting Period: OCTOBER 1996 UtilityContact:

Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW,):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

Maximum Dependable Capacity - summer (Net MW, ):

Ifchanges occur above since last report, give reasons:

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 745.0 745.0 0.0 745.0 0.0 2,432,864 822,140 793,218 100.0%

100.0%

96.2%

92.3%

0.0%

0.0 YEAR 7,320.0 4,772.8 985.9 4,535.6 997.4 12,400,967 4,103,520 3,907,623 62.0%

75.6%

48.3%

46.3%

2.6%

123.3 CUMULATIVE 104,168.2 74,408.6 1,730.8 71,786.1 1,956.2 212,858,517 71,681,000 68,665,941

,68.9%

70.8%

60.3%

59.4%

10.5%

8,443.0 26.

Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/12/97, duration is 42 days 27.

Ifcurrently shutdown, estimated startup date; Note:

Cumulative Unit Capacity Factors (MDC&DER) are calculated with weighted averages.

t t

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

OCTOBER 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: November 1, 1996 COMPLETED BY: B Knsko TELEPHONE: (509) 377M73 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1140 1143 1139 1131 1112 1137 1134 1133 1060 1006 892 639 890 1136 1142 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1143 1138 1123 1137 1130 1139 1145 1101 1042 1036 779 1024 1042 1049 1059 1087 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~ I

~

fQ 4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

OCTOBER 1996 DOCKET NOut 50-397 UNlT NAME.'NP-2 DATE: November 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96-12 10/11/96 S

Zero 96-13 10/26/96 F

Zero N/A N/A N/A N/A CH PUMPXX Reduced power to perform scram time testing, turbine valve testing and digital feedwater testing.

CB MOTORX Reduced power to perform maintenance on ASD channel 1A2.

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration 6 - Operational Error H - Other METHOD

~1-Menue 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT G41 1

ttsF&,

I p I A

II'