ML17292B587

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr
ML17292B587
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-048, GO2-99-48, NUDOCS 9903190147
Download: ML17292B587 (4)


Text

CATEGORY 1 REGULAR Y INFORMATION DZSTRZBUTZOh SYSTEM (RIDS) 4' ACCESSION NBR:9903190147 FACIL:50-397 WPPSS DOC.DATE: 99/02/28 NOTARIZED: NO Nuclear Project, Unit 2, Washington Public Powe DOCKET 05000397 I

AUTH.NAME . AUTHOR AFFILIATION KASKO,B.. .. Washington Public Power Supply System SMXTH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1998 for WNP-2.With 990311 C ltr.

D1STR1BDT10N CODE: 1E24D COP1'ES RECE1'VED: LTR l ENCL l STZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECZPZENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CUSHZNG,J 1 1 INTERNAL! ACRS 1 1 AEOD/SPD/RRAB 1 1 P'ENTER 0~~. 1 1 OC/DBA/PAD 1 1 GN 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1

~p~~'(uhl3i NOTE TO ALL "RIDS " RECI P IENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 11, 1999 GO2-99-048 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1999 Transmitted herewith is the Monthly Operating Report for the month of February 1999 as required by Technical Specification 5.6.4.

Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9903i9'Oi47 9~6>~8 PDR AMCK 05000897(.l )

p PDR i'i

OPERATING STATUS REPORT for WNP-2 Date: March 1, 1999 Docket: 50-397

2. Reporting Period: FEBRUARY 1999
3. Utility

Contact:

Bernice Kasko (509) 377-4473 4 Design Electrical Rating (Net MW,): 1153

5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE Hours Reactor Critical 672.0 1,416.0 90,257.3
7. Hours Generator On-Line 672.0 1,416.0 87,290.2
8. Unit Reserve Shutdown Hours 0.0 0.0 3,037.5
9. Net Electrical Energy (MWH) 701,567 1,520,202 84,850,133
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: FEBRUARY 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence NA SUMIVIARY: The plant entered the month at 65% power. The plant operated at 100% power during the day Monday-Friday and reduced power in the evenings to 85%. During the weekends power was reduced to 65%.

~lREASON 2 METHOD A - Equipment Failure E - Operator Training & l -- Manua B - Maintenance or Test License Examination 2 Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other