OPERATING STATUS. REPORT for WNP-2 Date:

June 1, 1997 2.

3.

4.

5.

Docket:

50-397 Reporting Period: MAY 1997 UtilityContact:

Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

1153 1153 6.

7.

8.

9.

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 0.0 0.0 48.0

-6,342

~YEA 2,049.2 2,049.2 552.0 1,707,985 CUMULATIVE 77,921.8 75,299.3 2,508.2 72,016,260 10, Challenges to safety/relief valves:

None pgQQ Q500039 Ohf90444 9706f2 ppR A

ppR

R

UNITSHUTDOWNS REPORT PERIOD:

MAY 1997 DOCKET NO.: 50-397 UNIT NAME: WNP-2

'ATE:

June 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason (1)

Method (2)

Cause and Corrective Action To Prevent Recurrence 97%12 970419 744.0 Plant entered annual refueling and maintenance outage (R-12) on April 19, 1997.

SUMMARY

The plant entered the month in the annual planned refueling/maintenance outage which began on April 19, 1997.

1 REASON A -

qutpment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other 2 METHOD 1 -

anua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other