OPERATING STATUS. REPORT for WNP-2 Date:
June 1, 1997 2.
3.
4.
5.
Docket:
50-397 Reporting Period: MAY 1997 UtilityContact:
Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):
Maximum Dependable Capacity - summer (Gross MW,):
1153 1153 6.
7.
8.
9.
Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 0.0 0.0 48.0
-6,342
~YEA 2,049.2 2,049.2 552.0 1,707,985 CUMULATIVE 77,921.8 75,299.3 2,508.2 72,016,260 10, Challenges to safety/relief valves:
None pgQQ Q500039 Ohf90444 9706f2 ppR A
ppR
R
UNITSHUTDOWNS REPORT PERIOD:
MAY 1997 DOCKET NO.: 50-397 UNIT NAME: WNP-2
'ATE:
June 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.
Date Type F: Forced S: Scheduled Duration (Hours)
Reason (1)
Method (2)
Cause and Corrective Action To Prevent Recurrence 97%12 970419 744.0 Plant entered annual refueling and maintenance outage (R-12) on April 19, 1997.
SUMMARY
The plant entered the month in the annual planned refueling/maintenance outage which began on April 19, 1997.
1 REASON A -
qutpment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other 2 METHOD 1 -
anua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other
4 P
t.
il