Monthly Operating Rept for Jan 1996 for Wnp Unit 2.W/960209 Ltr
ML17291B229
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1996
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-023, GO2-96-23, NUDOCS 9602210250
Download: ML17291B229 (8)


Text

CATEGORY j.

REGULATOR INFORMATION DISTRZBUTIONGSTEM (RIDE)

ACCESSION NRR .9602210250 DOC.DATE:,96/01/31, NOTARIZED: NO DOCKET FACIL:5G-4 /'QPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMED AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION k

SUBJECT:

Monthly operating rept for Jan 1996 for WNP Unit 2.W/960209 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR i ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES , RECIPIENT COPIES ID CODE/NAME, LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1' INTERNAL: 8R 10 10 AEOD/SPD/RRAB 1 ILE CENTER 1 1 NRR/DRPM/PECB 1 1 RG 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS: '4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL . 19

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 February 9, 1996 G02-96-023 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of January 1996 as required by Technical Specification 6.9.1.6.

Sincerely, J . Parrish anaging Director (Mail Drop 1023)

JVP:DGE CC: LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 0042 96022i0250 960i31 PDR ADGCK 050003'P7 R PDR

t

..t 4

A

$ a I

~ OPERATING STATUS REPOR'1 for WNP-2 Date: February 1, 1996 Docket: 50-397

2. Reporting Period: JANUARY 1996 Outage + On-line Hours: 744.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1145
8. Maximum Dependable Capacity - summer (Net MW, ): 1099
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): about 99% for January
11. Reasons for restrictions, if any: administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 1%

decrease in power. Revised electrical ratings in the process of being re-calculated.

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 744.0 97,592.2
13. Hours Reactor Critical 744.0 744.0 70,379.8
14. Rx Reserve Shutdown Hours 0.0 0.0 744.9
15. Hours Generator On-Line 744.0 744.0 67,994.5
16. Unit Reserve Shutdown Hours 0.0 0.0 958,8
17. Gross Thermal Energy (MWH) 2,416,449 2,416,449 202,873,999
18. Gross Electrical Energy (MWH) 827,600 827,600 68,405,080
19. Net Electrical Energy (MWH) 799,679 799,679 65,557,997
20. Unit Service Factor 100.0% 100.0% 69.7%
21. Unit Availability Factor 100.0% 100.0% 70.7%
22. Unit Capacity Factor (MDC Net) 97.8% 97.8% 61.5%
23. Unit Capacity Factor (DER Net) 93.2% 93.2% 60.7%
24. Unit Forced Outage Rate 0.0% 0.0% 10,9%
25. Forced Outage Hours 0.0 0.0 8,319.7 26, Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. Ifcurrently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC &, DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1996 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: JANUARY 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1159 16 1049 1156 17 1157 1148 18 1155 1159 19 1132 1159 20 692 1157 21 687 1156 22 1045 1158 23 1152 1157 24 1155 10 1152 25 1160 1154 26 1159 12 1083 27 1153 13 693 28 1157 14 688 29 1152 15 820 30 1155 31 1162 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

5 g r,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 ~.

DATE: February 1, 1996 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377444$

REPORT PERIOD: JANUARY 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9641 1/12/96 S 97.0 H NA ZZ ZZZZZZ Economic dispatch goal following) at the request the BPA.

of ~

9642 1/19/96 S 68.5 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch goad ~

following) at the request of the BPA for a portion of the month. The plant returned to full power operation at the end of the month, TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG4161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9- Other

~ ~

'