ML17284A894
ML17284A894 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 09/30/1999 |
From: | Kasko B, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
GO2-99-180, NUDOCS 9910210212 | |
Download: ML17284A894 (48) | |
Text
CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTIO SYSTEM (RXDS)
'ACCESSION NBR:9910210212 DOC.DATE: DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Monthly operating rept for Sept 1999 for -2.With 991012 j
SUBJECT:
WN ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
L ENCL SIZE:
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL CUSHING,J 1 1 INTERNAL: ACRS 1 1 ~FILE CENTER 01 1 1 OC/DBA/PAD 1 1 ~RES/DRAA/OERAB -===:-~ 1 1 RGN4 1 1 EXTERNAL: LMITCO MARSHALL 1 NOAC 1 1 NRC PDR' 1 1 D
'E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF. COPIES REQUIRED: LTTR 9 ENCL'
$ ÃEF8FtSP'ORTH WEST PO. Box 968 a Richfand, Washington 99352-0968 October 12, 1999 G02-99-180 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT SEPTEMBER 1999 Transmitted herewith is the Monthly Operating Report for the month of September 1999 as required by Technical Specification 5.6.4.
Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 1399 qqgoggoii2 990930 08000397 POP gDOCg, R PDR
rt OPERATING STATUS REPORT for WNP-2 Date: October 1, 1999 Docket: 50-397
- 2. Reporting Period: September 1999
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 411.3 4,447.8 93,289.1
- 7. Hours Generator On-Line 408.0 4,373.0 90,247.2
- 8. Unit Reserve Shutdown Hours 0.0 237.2 3,274.7
- 9. Net Electrical Energy (MWH) 326,870 4,279,000 87,608,931
- 10. Challenges to safety/relief valves: See Table
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: October 1, 1999 COMPLETED BY: B Kayo TELEPHONE: (509) 377M73 REPORT PERIOD: September, 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 99-002 9/17/99 332.7 Plant entered refueling and maintenance outage (R14) on September 17, 1999
SUMMARY
~lREASON 2 METHOD A - Equrpment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2- Manual Scram C Refueling F - Administration 3 Auto Scram D - Regulatory Restriction G - rational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other
SRV CHALLENGES COMPONENT DATE TYPE REASON COMMENTS MS-RV-1A 9/18/99 B As found set pressure within tolerance and performed as expected MS-RV-2A 9/18/99 B C Same as above MS-RV-3A 9/18/99 B C Same as above MS-RV-4A 9/18/99 B C Same as above MS-RV-1B 9/18/99 B C Same as above MS-RV-2B 9/18/99 B C Same as above MS-RV-3B 9/18/99 B C Same as above MS-RV-4B 9/18/99 B C Same as above MS-RV-5B 9/18/99 B C Same as above MS-RV-2C 9/18/99 B C Same as above MS-RV-3C 9/18/99 B C Same as above MS-RV-5C 9/18/99 B C Same as above MS-RV-1D 9/18/99 B C Same as above MS-RV-2D 9/18/99 B C . Same as above MS-RV-4D 9/18/99 B C Same as above MS-RV-1C 9/18/99 B As-found set pressure initially not within tolerance further testing resulted in acceptable as-left set pressure test values MS-RV-3D 9/18/99 B As-found set pressure not within tolerance but stroked as expected; SRV will be replaced and later refurbished and retested MS-RV-4C 9/18/99 B Same as above T e of Actuation Reason A = Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)
E = Manual Relief There were no other SRV challenges during the month.
z/iy/~m Distri55.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:
J Gushing 1 Paper Copy Internal Recipients:
RidsRgn4MailCenter 0 OK Rids Res DraaOerab 0 OK RidsOcfoDpbaPab 0 OK Rids Manager OK RidsAcrsAcnwMailCenter 0 OK RGN4. Paper Copy RES/DRAA/OERAB Paper Copy OCFO Paper Copy C TER 01 Paper Copy ACRS Paper Copy External Recipients:
NOAC Paper Copy INEEL Marshall Paper Copy Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003694556:1
Subject:
WNP-2 Monthly Operating Report for February 2000 Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003694556.
Page 1
Distri55.txt I
lE24- Monthly Operating Report (per Tech Specs)
Docket: 05000397 Page 2
I I
ENEBQF NORTH UlfEST t
PO. Box 968 n Richland, Washington 99352-0968 March 14, 2000 G02-00-050 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen;
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 2000 Transmitted herewith is the Monthly Operating Report for the month of February 2000 as required by Technical Specification 5.6.4.
Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library
. UtilityData Institute DL" Williams - BPA / 1399
~ ', ,W Y OPERATING STATUS REPORT for WNP-2 Date: March 1, 2000 Docket: 50-397
- 2. Reporting Period: February 2000
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 696.0 1,440.0 96,415.4
- 7. Hours Generator On-Line 696.0 1,440.0 93,333.8
- 8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
- 9. Net Electrical Energy (MWH) 795,063 1,645,418 91,061,242
- 10. Challenges to safety/relief valves: None
4 4
v~
t 4 J')
I H C
L~
I II k
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 2000 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: February, 2000 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence NA
SUMMARY
1 REASON 2 METHOD A- utpment Failure E - Operator Training & 1 - anual B - Maintenance or Test License Examination 2 - Manual Scram C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -
G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other
0 1 Distri50.txt distribution Sheet Priority: Normal From: Patricia Exum Action Recipients: Copies:
J Gushing 1 Paper Copy Internal Recipients:
RidsRgn4MailCenter 0 OK Rids Res DraaOerab 0 OK RidsManager OK RidsAcrsAcnwMailCenter 0 OK RGN4 Paper Copy RES/DRAA/OERAB 1 Paper Copy OC /BPB'ILE Paper Copy CENTER 01 Paper Copy CRS Paper Copy External Recipients:
NOAC Paper Copy INEEL Marshall Paper Copy Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003685029:1
Subject:
Monthly operating report for January 2000 for WNP-2. With letter dated 2/8/00.
Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for
'ccession Number ML003685029.
Page 1
()
Distri50.txt lE24 - Monthly Operating Report (per Tech Specs)
Docket: 05000397 Page 2
SÃEBl" NORTH llVEST PO. Box 968 a Richland, Washington 99352-0968 February 8, 2000 G02-00-025 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPI'-21 MONTHLYOPERATING REPORT JANUARY 2000 Transmitted herewith is the Monthly Operating Report for the month of January 2000 as required by Technical Specification 5.6.4.
Respectfully, G. O. ith Vice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399
OPERATING STATUS REPORT for WNP-2 f e Date: February 1, 2000 Docket: 50-397
- 2. Reporting Period: January 2000
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473 4 Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 744.0 744.0 95,719.4
- 7. Hours Generator On-Line 744.0 744.0 92,637.8
- 8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
- 9. Net Electrical Energy (MWH) 850,355 850,355 90,266,179
- 10. Challenges to safety/relief valves: None
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 2000 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: January, 2000 F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence, NA SMIMARY:
~IREAS ON 2 METHOD A - Equ>pment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2- Manua Scram C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -
G Operational Error 4 - Continued H - 01her 5 - Reduced Load 9 - Other.
Distri-8.txt Distribution Sheet Priority: Normal From: Elaine Walker Action Recipients: Copies:
J Gushing 1 Not Found Internal Recipients:
RGN 4 Not Found RES/DRAA/OERAB 1 Not Found OCFO/D 1 Not Found ILE CE@TgR~O+ 1 Not Found ACRS Not Found External Recipients:
NOAC Not Found INEEL Marshall Not Foun'd Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003677878
Subject:
Monthly operating report for December 1999 for WNP-2. Witli 000112 letter.
Body:
Docket: 05000397, Notes: N/A Page 1
NORTH WEST PO. Box 968 a Richland, Washington 99352-0968 January 12, 2000 G02-00-008 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT DECEMBER 1999 Transmitted herewith is the Monthly Operating Report for the month of December 1999 as required by Technical Specification 5.6.4.
Respectfully," '
P G. O. Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute
-" '""'"DL'".Williams-BPA / 1399
A ~ ~
~ 4 e
OPERATING STATUS REPORT for WNP-2 Date: January 1, 2000 Docket: 50-397
- 2. Reporting Period: December 1999
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW.): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 744.0 6,134.1 94,975.4
- 7. Hours Generator On-Line 744.0 6,019.6 91,893.8
- 8. Unit Reserve Shutdown Hours 0.0 237.2 3,274.7
- 9. Net Electrical Energy (MWH) 852,055 6,085,893 89,415,824
- 10. Challenges to safety/relief valves: None
~ (
~ S I I 1I I
t-~ II
UNIT SHUTDOWNS DOCKET NO.: 50-397'NIT NAME: WNP-2 DATE: January 1, 2000 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: December, 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence NA
SUMMARY
- The Plant down powered to 80% at 20:13 on December 31 for Y2K readiness. The Plant resumed 100%
power at 05:09 on January 1, 2000
~lREASON 2 METHOD A - Equipment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2 - Manual Scram C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other
U
)~ g5 89 gT 1g
~-317 z+c/FP Distri85.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:
J Cushing 1 Not Found Internal Recipients:
RGN 4 Not Found RES/DRAA/OERAB Not Found OC/DBA/PAD Not Found Not Found Not Found External Recipients:
NRC PDR 1 Not Found NOAC 1 Not Found INEEL Marshall "1 Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993500101
Subject:
Monthly operating report for November 1999 for WNP-2.With 991206 lette r.
Body:
PDR ADOCK 05000397 R Docket: 05000397, Notes: N/A Page 1
EÃEPQÃ NORTH WEST PO. Box 968 a Richtand, Washington 99352-0968 December 6, 1999 G02-99-209 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1999 Transmitted herewith is the Monthly Operating Report for the month of November 1999 as required by Technical Specification 5.6.4.
Respectfully, G. O.
Sm'ice President, Generation Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 1399
~
,~
OPERATING STATUS REPORT for WNP-2 Date; December 1, 1999 Docket: 50-397
- 2. Reporting Period: November 1999
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE Hours Reactor Critical 720.0 5,389.1 94,230.4
- 7. Hours Generator On-Line 720.0 5,274.6 91,148.8
- 8. Unit Reserve Shutdown Hours 0.0 237.2 3,274.7
- 9. Net Electrical Energy (MWH) 822,540 5,233,838 88,563,769 10, Challenges to safety/relief valves: None
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: December 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: November, 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence NA SKVIMARY:
fll- REAsoN 2 METHOD A Equipment Failure E - Operator Training & 1 - anua B - Maintenance or Test License Examination 2- Manua Scram' C Refueling F - Administration 3-Auto Scram D - Regulatory Restriction G - Operational Error - Continued H - Other 5 - Reduced Load 9 - Other
Illi 58 V
/
Distri-2.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:
J Gushing 1 Not Found Internal Recipients:
RGN 4. , NotFound RES/DRAA/OERAB Not Found OC/DBA/P D Not Found
~F LE CENT~ER 01 Not Found Not Found ACRS External Recipients:
NRC PDR Not Found NOAC Not Found INEEL Marshall Not Found Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993240437
Subject:
Monthly Operating Report for October 1999 for WNP-2.With November 10, 1999 Letter.
.Body:
PDR ADOCK 05000397 R Docket: 05000397, Notes: N/A Page 1
t NORTH WEST PO. Box 968 o Richland, Washington 99352-0968 November 10, 1999 G02-99-197 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT OCTOBER 1999 Transmitted herewith is the Monthly Operating Report for the month of October 1999 as required by Technical Specification 5.6.4.
Respectfully, G. O. Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston & Strawn INPO ANI Library
'tilityData Institute DL Williams - BPA / 1399 I
R~'f0LI37 OSQQ ~~1
, f OPERATING STATUS REPORT for WNP-2 Date: November 1, 1999 Docket: 50-397
- 2. Reporting Period: October 1999
- 3. Utility
Contact:
Bernice Kasko (509) 377-4473
- 4. Design Electrical Rating (Net MW,): 1153
- 5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
- 6. Hours Reactor Critical 221.3 4,669.1 93,510.4
- 7. Hours Generator On-Line 181.6 4,554.6 90,428.8
- 8. Unit Reserve Shutdown Hours 0.0 237.2 3,274.7
- 9. Net Electrical Energy (MWH) 132,298 4,411,298 87,741,229
- 10. Challenges to safety/relief valves: See Table
1 r',
1 1 i C C
I~ 1~
"I n,D I
I f 1
'I P
II 1,
C' ~ 1 C
1
\
~
l 1
I 1
e I (1 I jj I
~ e(IIP W ~ Ij P
II
- I Pr 1 I
~
~
I II
'I 1
SRV CHALLENGES COMPONENT DATE TYPE REASON COMMENTS C
MS-RV-1A 10/12/99 B Valve was opened for operator operability testing to satisfy post-maintenance and IST program test requirements.
MS-RV-2A 10/12/99 B C Same as above MS-RV-3A 10/12/99 B C Same as above MS-RV-4A 10/12/99 B C Same as above MS-RV-1B 10/12/99 B C Same as above MS-RV-2B 10/12/99 B C Same as above MS-RV-3B 10/12/99 B C Same as above MS-RV-4B 10/12/99 B C Same as above MS-RU-SB 10/12/99 B C Same as above MS-RV-1C 10/12/99 B C Same as above MS-RV-2C 10/12/99 B C Same as above MS-RV-3C 10/12/99 B C Same as above MS-RV-4C 10/12/99 B C Same as above MS-RV-5C 10/12/99 B C Same as above MS-RV-1D 10/12/99 B C Same as above MS-RU-2D 10/12/99 B C Same as above MS-RV-3D 10/12/99 B C Same as above MS-RV-4D 10/12/99 B C Same as above MS-RV-1A 10/23/99 B Valve was partially opened for valve set pressure testing to satisfy post-maintenance and IST program test requirements, MS-RV-4A 10/23/99 B C Same as above MS-RV-1B 10/23/99 B C Same as above MS-RV-2B 10/23/99 B C Same as above MS-RV-38 10/23/99 B C Same as above MS-RV-1C 10/23/99 B C Same as above MS-RV-4C 10/23/99 B C Same as above MS-RU-2D 10/23/99 B C Same as above MS-RV-3D 10/23/99 B C Same as above MS-RV-4D 10/23/99 B C Same as above MS-RV-1C 10/23/99 Ualve was partially opened for valve set pressure testing. Set pressure was not within the required tolerance and was declared inoperable for safety setpoint MS-RV-4C 10/23/99 B Same as above
li 'll
/Hi II' f g
>I
" lit ,
W g
S L
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: October, 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 99-002 9/17/99 562.4 Plant entered refueling and maintenance outage (R14) on September 17, 1999. The R14 refueling and maintenance outage ended on October 24, 1999.
SUMMARY
fllREAsoN A - Equipment Failure 2 METHOD
- Manua E - Operator Training & 1 B - Maintenance or Test License Examination 2- Manual Scram C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -
G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other
f'>>fY 4<<>>ll
>>>>g> fy>> - g ppgg t~g>t>>4> +
g
~ ~4
'I44 II l '>>
I>>
f ff If I <<fl foal' r
f 4
I4<< 'III,'
<<>>I 4 "i -.Pe4
~ 4 4>><<
4 I I,'4
SRV CHALLENGES MS-RV-1A 10/23/99 8 Valve was fully opened for operability
.testing to satisfy post-maintenance and IST program test requirements MS-RV-2A 10/23/99 8 C Same as above MS-RV-3A 10/23/99 8 C Same as above MS-RV-18 10/23/99 8 C Same as above MS-RV-28 10/23/99 8 C Same as above MS-RV-38 10/23/99 8 C Same as above MS-RV-1C 10/23/99 8 C Same as above MS-RV-2C 10/23/99 8 C Same as above MS-RV-3C 10/23/99 8 C Same as above MS-RV-1D 10/23/99 8 C Same as above MS-RV-2D 10/23/99 8 C Same as above MS-RV-4D 10/23/99 8 C Same as above MS-RV-3D 10/23/99 8 Valve was fully opened for operability testing to satisfy post-maintenance and IST program test requirements MS-RV-4A 10/23/99 8 C Same as above MS-RU-48 10/23/99 8 C Same as above MS-RV-4C 10I23/99 8 C Same as above MS-RV-58 10/23/99 8 C Same as above MS-RV-SC 10/23/99 8 C Same as above T e of Actuation Reason A = Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)
E = Manual Relief There were no other SRV challenges during the month.
~ ~
gQi l 1 g~
~'
d' p