Monthly Operating Rept for Mar 1996 for WNP-2.W/960410 Ltr
ML17291B296
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1996
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-082, GO2-96-82, NUDOCS 9604170322
Download: ML17291B296 (8)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

'CCESSION NBR:9604170322 DOC.DATE: 96/03/31 NOTARIZED: NO 'OCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. , Washington Public Powe'r Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1996 for WNP-2.W/960410 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COP1ES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 0

INTERNAL: A 10 10 AEOD/SPD/RRAB 1 1 ILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 84 1 1 EXTERNAL: LITCO BRYCEPJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL-NUMBER OF, COPIES REQUIRED: LTTR 19 ENCL . 19

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 10, 1996 G02-96-082 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MARCH 1996 Transmitted herewith is the Monthly Operating Report for the month of March 1996 as required by Technical Specification 6.9.1.6.

S incerely,

. V. Parrish ~

Chief Executive Officer (Mail Drop 1023)

JVP:DGE CC: LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 3.70024 9604i70322 96033i PDR ADOCK 050003'P7 R PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: April 1, 1996 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: MARCH 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 716 16 -14 41 17 -14

-13 18 -14

-14 19 -13

-14 20 -13

-14 21 -13

-14 22 -14

-14 23 -14

-14 24 -14 10 -13 25 -13

-13 26 -14 12 -13 27 -13 13 -13 28 -9 14 -13 29 -10 15 -13 30 -13 31 -14 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

J, OPERATING STATUS REPORT for WNP-2 Date: April 1, 1996 Docket: 50-397

2. Reporting Period: MARCH 1996 Outage + On-line Hours: 33.6
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3486 Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, ifany (Net MW,): 0 after March 2, 1996
11. Reasons for restrictions, if any: Reserve shutdown for economic reasons MONTH YEAR CUMULATIVE
12. Report Period Hours 744.0 2,184.0 99,032.2
13. Hours Reactor Critical 45.1 1,485.1 71,120.9
14. Rx Reserve Shutdown Hours 698,9 698.9 1,443.8
15. Hours Generator On-Line 33.6 1,473.6 68,724.1
16. Unit Reserve Shutdown Hours 710.4 710.4 1,669.2
17. Gross Thermal Energy (MWH) 68,851 4,425,360 204,882,910
18. Gross Electrical Energy (MWH) 19,240 1,505,290 69,082,770
19. Net Electrical Energy (MWH) 8,898 1,441,464 66,199,782 20.- Unit Service Factor 4.5% 67.5% 69.4%
21. Unit Availability Factor 100.0% 100.0% 71.1%
22. Unit Capacity Factor (MDC Net) 1.1% 59.8% 61.2%
23. Unit Capacity Factor (DER Net) 1.0% 57.2% 60.4%
24. Unit Forced Outage Rate 0.0% 0.0% 10.8%
25. Forced Outage Hours 0.0 0.0 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. Ifcurrently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC &, DER) are calculated with weighted averages.

v, ~

II

UNIT SHUTDOWNS AND POWER REDUCTIONS L

DOCKET NO.: 50-397 UNIT NAME: IVNPg2.

DATE: April 1, 1996 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: MARCH 1996 f

No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9646 3/1/96 33.6 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request the BPA.

of 0 9647 3/2/96 S 710.4 H NA ZZ ZZZZZZ Economic dispatch (reserve shutdown) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant continued to operate at reduced power goad following) at the request of the BPA for economic reasons. On March 2 the plant was shutdown at the request of the BPA for economic reasons. The plant will remain in reserve shutdown until the beginning of the annual planned refueling/maintenance outage which is planned to begin April 13, 1996.

TYPE REASON METHOD SYSTEM 8c COMPONENT P - Forced A - Equipment Failure E - Operator Training & ~t- Menus REG%1 1E tts KH S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 /