OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997 2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Outage + On-line Hours:
633.2 3486 1199 1153 1153 1107 none none Docket:
50-397 Reporting Period: MARCH 1997 UtilityContact:
Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW,):
Nameplate Rating (Gross MW,):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity - summer (Gross MW,):
Maximum Dependable Capacity - summer (Net MW, ):
Ifchanges occur above since last report, give reasons:
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
MONTH YEAR CUMULATIVE OO:
O'HA, OOO
'O
~IA
'O' A<
O'M Cl Ol IrI QO:
+@I O'O O'2.
13.
14.
15.
16, 17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDCNet)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours 744.0 633.2 0.0 633.2 110.8 1,813,573 602,390 578,015 85.1%
100.0%
70.2%
67.4%
1.9%
14.8 2,160.0 2,049.2 0.0 2,049.2 110.8 5,421,553 1,793,744 1,723,807 94.9%
100.0%
72.1%
.69.2%
0.6%
14.8 107,792.2 77,921.8 1,730.8 75,299.3 2,067.0 223,267,583 75,178,534 72,032,082 69.9%
71.8%
61.1%
- 60. 1%
9.8%
8,457.8 Ifcurrently shutdown, estimated startup date:
6/19/97 Challenges to safety/relief valves:
See Table Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days Note:
Cumulative Unit Capacity Factors (MDC&DER) are calculated with weighted averages.
~
~