CATEGORY 1 REGUDRTOO INFORMATION DISTRIBUTION OSTEM (RIDE)

ACCESSION NBR:9704240101 . DOC.DATE: 97/03/31 NOTARIZED: NO , DOCKET I FACIL:50-,397 -WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AU'1%6.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System

'RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1997 for WNP-2.W/970411 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 ER 0 1 1 NRR/DRPM/PECB 1 1 OC/DB'A/PAD 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N',

T NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Wnshington 99352-0968 April 11, 1997 G02-97-070 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT 1997 'ARCH Transmitted herewith is the Monthly Operating Report for the month of March 1997 as required by Technical Specification 5.6.4.

Respectfully, Plant General Manager Mail Drop'9270 CC: EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams '- BPA / 399 9704240%0% 'F7033i PDR ADQCK 05000397 R PDR

Illlllllllllllllll IIIIIIIIIIIIIIIIIIIIII

OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997

1. Docket: 50-397
2. Reporting Period: MARCH 1997 Outage + On-line Hours: 633.2
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW, ): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, ifany (Net MW,): none
11. Reasons for restrictions, ifany:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 2,160.0 107,792.2
13. Hours Reactor Critical 633.2 2,049,2 77,921.8
14. Rx Reserve Shutdown Hours 0.0 0.0 1,730.8
15. Hours Generator On-Line 633.2 2,049.2 75,299.3
16. Unit Reserve Shutdown Hours 110.8 110.8 2,067.0
17. Gross Thermal Energy (MWH) 1,813,573 5,421,553 223,267,583
18. Gross Electrical Energy (MWH) 602,390 1,793,744 75,178,534
19. Net Electrical Energy (MWH) 578,015 1,723,807 72,032,082
20. Unit Service Factor 85.1% 94.9% 69.9%
21. Unit Availability Factor 100.0% 100.0% 71.8%
22. Unit Capacity Factor (MDC Net) 70.2% 72.1% 61. 1%
23. Unit Capacity Factor (DER Net) 67.4% 69.2% 60.1%
24. Unit Forced Outage Rate 0.0% 0.0% 10. 1%
25. Forced Outage Hours 0.0 0.0 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days
27. Ifcurrently shutdown, estimated startup date: 6/19/97
28. Challenges to safety/relief valves: See Table Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: April 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: MARCH 1997 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 613 16 1005 606 17 1008 1046 18 897 1056 19 877 1017 20 898 1040 21 565 1125 22 595 1139 23 589 1123 24 590 10 1138 25 631 1140 26 12 1137 27 13 1137 28 1025 29 -15 15 INSTRUCTIONS 1020 30 -14

-14 On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be u'sed to plot a graph for each reporting mo'nth. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line {or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: MARCH 1997 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 97-08 3/21/97 F 0 D 1 97-003 IB INSTRU Entered TS Action Statement 3.0.3 due to TS surveillance response time requirement not met for certain instrumentation.

97-09 3/27/97 S 0 N/Z CH PUMP RFW pump trip test followed by RRC automatic runback to 28 Hz.97-010 3/27/97 F 14.83 D 97-004 CB INSTRU Plant manually scrammed during RFW system testing due to a RRC pump cavitation interlock resulting in a runback to 15 Hz and entry into Region A.

97%11 3/28/97 S 96 H N/A ZZ ZZZZZZ Economic dispatch

SUMMARY

WNP-2 entered economic dispatch on 3/28/97 and will remain in economic dispatch until the start of the refueling outage.

TYPE REASON METHOD SYSTEM & COMPONENT F7orced

- A - Equipment Failure E - Operator Training & I - M~uM1 G%1 1E its &

S Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - 'Other 5 - Reduced Load 9 - Other

SRV CHALLENGES DATE TYPE REA N MS-RV-4D 3/27/97 B E MS-RV-1A 3/27/97 C C MS-RV-1B 3/27/97 C C MS-RV-1C 3/27/97 C C MS-RV-1D 3/27/97 C C MS-RV-2A 3/27/97 C C MS-RV-2B 3/27/97 C C MS-RV-2C 3/27/97 C C MS-RV-2D 3/27/97 C C MS-RV-3A 3/27/97 C C MS-RV-3B 3/27/97 C C MS-RV-3C 3/27/97 C C MS-RV-3D 3/27/97 C C MS-RV-4A 3/27/97 C C MS-RV-4B 3/27/97 C C MS-RV-4C 3/27/97 C C MS-RV-4D 3/27/97 C C MS-RV-5B 3/27/97 C C MS-RV-SC 3/27/97 C C MS-RV-4C* 3/27/97 C C MS-RV-4A* 3/27/97 C C e of Actuation R~ea on A = Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)

E = Manual Relief

  • MS-RV-4C and MS-RV-4A were partially opened an additional 4 times each on 3/27/97 for spring set pressure testing for information.