Monthly Operating Rept for Aug 1997 for WNP-2
ML17292B051
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
G02-97-168, G2-97-168, NUDOCS 9709190193
Download: ML17292B051 (7)


Text

CATEGORY 1 REUUDRT+ INFORMATION DISTRIBUTIOllSTEM (RIDE)

'ACCESSION NBR:9709190193 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS 'Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.PAME AUTHOR AFFILIATION KASKO,B.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1997 for WNP-2.W/970911 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

(

ENCL

~

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

INTERNAL:

RECIPIENT ID CODE/NAME PD4-2 PD ILE C OC DBA/PAD COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC 1

1 D

U E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

-DESK (DCD)

ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

Jl I

~r WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ Richlamf, Washingtou 99352-0968 September 11, 1997 G02-97-168 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT AUGUST 1997 Transmitted herewith is the Monthly Operating Report for the month of August 1997 as required by. Technical Specification 5.6.4.

The Supply System is also submitting revised figures for Unit Reserve Shutdown Hours for the months of May and June.

These new figures represent economic dispatch credit received from the Bonneville Power Administration. '

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 cc:

EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N

.PD Robinson - Winston &'Strawn

,p g r~TWTVI/4 t

I::,~'~ANILibrary ~:.," - "i-

'tility Data Institute DL'illiams'-,'PA./ 399 9709k'POi93 97083%

(PDR i.'DOCK 05000397 R"

' 'DR

~i~igigltitltthiilittttll

C"

~

~

A il

/

f h

I

'g

~

V II ll

OPERATING STATUS REPORT for WNP-2 Date:

September 1, 1997 2.

3.

4, 5.

Docket:

50-397 Reporting Period: AUGUST 1997 UtilityContact:

Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

1153 1153 6.

7.

8.

9.

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 744.0 744.0 0.0 813,616 YEAR 3,443.7 3,319.9 1,081.3 2,968,804 CUMULATIVE 79,316.3 76,570.0 3,037.5 73,277,079 10.

Challenges to safety/relief valves:

None 8.

Unit Reserve Shutdown Hours (May) 8.

Unit Reserve Shutdown Hours (June)

MONTH 0.0 360.0 YEAR 504.0 864.0 CUMULATIVE 2460.2 2820.2

C J

I' r

Il h

p II (r

PI Y

I 4

UNITSHUTDOWNS REPORT PERIOD:

AUGUST 1997 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: September 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason (1)

Method (2)

Cause and Corrective Action To Prevent Recurrence None

SUMMARY

1 REASON A -

utpment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other 2 METHOD 1 - Manua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other