{{#Wiki_filter:gcCELEBRATED D1BUTlONDEMONSTIONSYSTEMREGULATINFORMATION DISTRIBUTIO STEM(RIDS)ACCESSION NBR:9004230251 DOC.DATE:
{{#Wiki_filter:gc CELEBRATED D1 BUTlON DEMONS TION SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)ACCESSION NBR:9004230251 DOC.DATE: 90/04/06 NOTARIZED:
90/04/06NOTARIZED:
NO DOCKET N FACIL:50-24$
NODOCKETNFACIL:50-24$
Robert Emmet Ginna Nuclear Plant, Unit I, Rocheeter G 05000244, AUTH.NAME'UTHOR AFFILIATION MECREDY,B..C.
RobertEmmetGinnaNuclearPlant,UnitI,Rocheeter G05000244, AUTH.NAME'UTHORAFFILIATION MECREDY,B..C.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3  
ProjectDirectorate I-3


==SUBJECT:==
==SUBJECT:==
Discusses impactofSERissuanceforinservice insp&inservice testingprograms.
Discusses impact of SER issuance for inservice insp&inservice testing programs.R DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR i ENCL 0.SIZE: I TITLE: OR Submittal:
RDISTRIBUTION CODE:A047DCOPIESRECEIVED:LTR iENCL0.SIZE:ITITLE:ORSubmittal:
Inservice Inspection/Testing/Relief from ASME Code D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Inservice Inspection/Testing/Relief fromASMECodeDNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244 8 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DSP/TPAB NRR/DET/EMEB 9H 0+C+gliB EG FILE 01 EXTERNAL: EGGG BROWNFB LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EGGG RANSOME,C NRC PDR COPIES LTTR ENCL h gS/as/>~~/h NOIR K)ALL"RIDS" KXIPIENIS'IZASE HELP US K)REDOCE KATE CGHIACI IHE DOCUME&#xc3;Z COHIBOL DESK F RQCN Pl-37'(EXT.20079)KO EL'ZKQCLTB RKR MME PBOM DZPI%GH7ZZQN LXSTS PQR IXXMQRG'8 KRJ DCSERT NEEDt D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL h 1 f ZiMW~//~/ill'~<Owl>+zi zi zzzrzzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N K 14649 0001 April 6, 1990 TELEPHONE AREA CODE Tld 546.2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555  
050002448RECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERNAL:
AEOD/DSP/TPAB NRR/DET/EMEB 9H0+C+gliBEGFILE01EXTERNAL:
EGGGBROWNFBLPDRNSICCOPIESLTTRENCLRECIPIENT IDCODE/NAME PD1-3PDNRR/DET/ECMB 9HNUDOCS-ABSTRACT OGC/HDS2RES/DSIR/EIB EGGGRANSOME,C NRCPDRCOPIESLTTRENCLhgS/as/>~~/hNOIRK)ALL"RIDS"KXIPIENIS'IZASE HELPUSK)REDOCEKATECGHIACIIHEDOCUME&#xc3;ZCOHIBOLDESKFRQCNPl-37'(EXT.20079)KOEL'ZKQCLTB RKRMMEPBOMDZPI%GH7ZZQN LXSTSPQRIXXMQRG'8 KRJDCSERTNEEDtDSTOTALNUMBEROFCOPIESREQUIRED:
LTTR20ENCL h1 fZiMW~//~/ill'~<Owl>+zizizzzrzzzROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, NK146490001April6,1990TELEPHONE AREACODETld546.2700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555


==Subject:==
==Subject:==
ImpactofSERIssuanceforInservice Inspection andInservice TestingProgramsR.E.GinnaNuclearPowerPlantDocketNo.50-244
Impact of SER Issuance for Inservice Inspection and Inservice Testing Programs R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Johnson:==
==Dear Mr.Johnson:==
RG&EandtheNRChavebeendiscussing severalreliefrequestsassociated withoursubmittal ofthe1990-1999 Inservice Inspection andInservice TestingProgramintervals.
RG&E and the NRC have been discussing several relief requests associated with our submittal of the 1990-1999 Inservice Inspection and Inservice Testing Program intervals.
Ourunderstanding isthattheNRC'sSafetyEvaluation Reportsonthesesubmittals arescheduled forthelatterportionofApril1990.ThistimingwillnotaffectRG&E'simplementation plansfortheseprograms, exceptintwoinstances, asexplained below:1.PumandValve(IST)ProramRG&Esubmitted reliefrequestsVR-8andVR-9.byletterdatedFebruary15,1990inordertoextendthetimebetweendisassembly inspections.
Our understanding is that the NRC's Safety Evaluation Reports on these submittals are scheduled for the latter portion of April 1990.This timing will not affect RG&E's implementation plans for these programs, except in two instances, as explained below: 1.Pum and Valve (IST)Pro ram RG&E submitted relief requests VR-8 and VR-9.by letter dated February 15, 1990 in order to extend the time between disassembly inspections.
BasedonNRC/contractor reviews,ithasbeendetermined thatanextendedintervalisreasonable, althoughtheexactdurationhasnotyetbeenagreedupon.Therefore, RG&Ewillnotperformanydisassembly ofcheckvalves842AandB,or867AandB,duringthe1990refueling outage.2.Inservice Insection(ISI)ProramRG&Esubmitted reliefrequestNo.4regarding ReactorCoolantPumpvolumetric andvisualexaminations.
Based on NRC/contractor reviews, it has been determined that an extended interval is reasonable, although the exact duration has not yet been agreed upon.Therefore, RG&E will not perform any disassembly of check valves 842A and B, or 867 A and B, during the 1990 refueling outage.2.Inservice Ins ection (ISI)Pro ram RG&E submitted relief request No.4 regarding Reactor Coolant Pump volumetric and visual examinations.
Conversations todatewiththeNRCandcontractors hasindicated substantial agreement withthealternative examination methodsprovided, inthereliefrequest.Thesealternative methodswillbeimplemented duringthe1990refueling outage.Verytrulyyours,pppb'DOCK p500p~psp251gppp>+<PGJW~097Attachment RobertC.MereDivisionManagern/0.NuclearProduction I'I()gA>(OA1stP k11\AVK xc:Mr.AllenR.Johnson(MailStop14Dl)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector}}
Conversations to date with the NRC and contractors has indicated substantial agreement with the alternative examination methods provided, in the relief request.These alternative methods will be implemented during the 1990 refueling outage.Very truly yours, pppb'DOCK p500 p~psp251 gp pp>+<P GJW~097 Attachment Robert C.Me re Division Manager n/0.Nuclear Production I'I ()g A>(OA1 stP k 1 1\A V K xc: Mr.Allen R.Johnson (Mail Stop 14Dl)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector}}

Revision as of 15:52, 7 July 2018

Discusses Impact of SER Issuance for Inservice Insp & Inservice Testing Programs & Advises That Timing Will Not Affect Util Implementation Plans for Programs,Except as Listed
ML17250B145
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/06/1990
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
Office of Nuclear Reactor Regulation
References
NUDOCS 9004230251
Download: ML17250B145 (5)


Text

gc CELEBRATED D1 BUTlON DEMONS TION SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)ACCESSION NBR:9004230251 DOC.DATE: 90/04/06 NOTARIZED:

NO DOCKET N FACIL:50-24$

Robert Emmet Ginna Nuclear Plant, Unit I, Rocheeter G 05000244, AUTH.NAME'UTHOR AFFILIATION MECREDY,B..C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Discusses impact of SER issuance for inservice insp&inservice testing programs.R DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR i ENCL 0.SIZE: I TITLE: OR Submittal:

Inservice Inspection/Testing/Relief from ASME Code D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 8 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DSP/TPAB NRR/DET/EMEB 9H 0+C+gliB EG FILE 01 EXTERNAL: EGGG BROWNFB LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EGGG RANSOME,C NRC PDR COPIES LTTR ENCL h gS/as/>~~/h NOIR K)ALL"RIDS" KXIPIENIS'IZASE HELP US K)REDOCE KATE CGHIACI IHE DOCUMEÃZ COHIBOL DESK F RQCN Pl-37'(EXT.20079)KO EL'ZKQCLTB RKR MME PBOM DZPI%GH7ZZQN LXSTS PQR IXXMQRG'8 KRJ DCSERT NEEDt D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL h 1 f ZiMW~//~/ill'~<Owl>+zi zi zzzrzzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N K 14649 0001 April 6, 1990 TELEPHONE AREA CODE Tld 546.2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555

Subject:

Impact of SER Issuance for Inservice Inspection and Inservice Testing Programs R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Johnson:

RG&E and the NRC have been discussing several relief requests associated with our submittal of the 1990-1999 Inservice Inspection and Inservice Testing Program intervals.

Our understanding is that the NRC's Safety Evaluation Reports on these submittals are scheduled for the latter portion of April 1990.This timing will not affect RG&E's implementation plans for these programs, except in two instances, as explained below: 1.Pum and Valve (IST)Pro ram RG&E submitted relief requests VR-8 and VR-9.by letter dated February 15, 1990 in order to extend the time between disassembly inspections.

Based on NRC/contractor reviews, it has been determined that an extended interval is reasonable, although the exact duration has not yet been agreed upon.Therefore, RG&E will not perform any disassembly of check valves 842A and B, or 867 A and B, during the 1990 refueling outage.2.Inservice Ins ection (ISI)Pro ram RG&E submitted relief request No.4 regarding Reactor Coolant Pump volumetric and visual examinations.

Conversations to date with the NRC and contractors has indicated substantial agreement with the alternative examination methods provided, in the relief request.These alternative methods will be implemented during the 1990 refueling outage.Very truly yours, pppb'DOCK p500 p~psp251 gp pp>+

(OA1 stP k 1 1\A V K xc: Mr.Allen R.Johnson (Mail Stop 14Dl)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector