. Commonwea;th IAiwn O>mpany | |||
- Draldwx1 Generating Nation | |||
. - Route 81, llox 8 i - | |||
f)ramille.11. NH07-9619 Tel HI5-14 bull December 3,1997 BW/97-0065 United States Nuclear Regulatory Comm%sion | |||
-- Attention: Document Control Desk Washington, D.C. 20555-0001 | |||
==Subject:== | |||
Monthly Operating Report for November,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Docket Nos. 50-456 and 50-457 Ladies rad Gentlemen: | |||
In accordance with Technical Specification 6.9.1.8, enclosed you will Fnd the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period November 1,1997 through November 30,1997. | |||
Please address any comments or questions regarding this matter to Don Hildebrant at (815) 458-2801, extension 2173. | |||
Very truly yours, U. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCH/dah ! | |||
onCORREsPZCsTECif BW97 0065. Doc y ) | |||
Enclosures cc: A. B. Beach, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident Inspector - B.aidwood Office of Nuclear Facility Safety - IDNS 4 nnOd3 9712100328 97113o | |||
* h,b h l | |||
: A Unicom Cor.pany | |||
i | |||
* 1 , | |||
cc: INPO Records Center D. L. Farrar, Nuclear Regional Sersice Mgr. | |||
D.J. Chrzanowski, Nuclear Licensing Admin. | |||
D. P. Eggett, Nuclear Engineering Dept. | |||
T. Tulon, Site Vice President, Braidwood D. M Hoots, Unit i Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunceicky, Westinghouse D. R. Scavers, A.N 1. | |||
S. P. Focht, American Nuclear Insurers | |||
_ . _ .. . _ . . _ . . _ . . - - . . _ . _ ~. . _ _ _ . _ _ . _ _ | |||
lk | |||
, t | |||
. BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 I MONTHLY OPERATING REPORT L | |||
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPI-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 4 | |||
f A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 12/03/97 Completed by: Don Hildebrant Telephone: 815-458 280lx2173 REPORTING PERIOD: November 1997 | |||
: 1) Design Electrical Rating (Mwn ut) 1120 | |||
: 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Y%r To Date Cumulative | |||
: 3) Hours Reactor Critical (Hours) 720.0 6,632.7 64,658.1 | |||
: 4) Hours Generator on Line (Hours) 720.0 6,594.7 63,798.4 | |||
: 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 | |||
: 6) Not Electrical Energy (Mwh) 806,593 7,246,879 65,308,280 | |||
B. UNIT SHUTDOWNS Docket No.: 50 - 456 ' | |||
Unit Braidwood 1 Date: 12/03/97 - | |||
Completed by- Don liildebrrmt Telephone: 315-458-2801x2173 REPORT PERIOD: November 1997 Type Duration Reason Method Caure and Corrective Actions | |||
% Date Hours and Comments None | |||
==SUMMARY== | |||
Unit 1 entered the month at 100% capability and operated routinely forit i entire month. | |||
REASON METHOD TYPE A - Equipment Failure (explain) 1 - Manual F - Forced 2 - Manual Trip / Scram S - Scheduled B - Maintenance or Test l | |||
C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain) | |||
F - Administrative G - Operator Error (explain) | |||
H - Other (explain) l l | |||
1 | |||
C. SAFETY / RELIEF VAO!E OPERATIONS Docket No.: 50 - 456 " | |||
Unit: Braidwood 1 Date: 12/03/97 - | |||
Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves Nc. & Type Plant Condition Description of Event Date . Actuated c Actuation None l | |||
l 1 | |||
l | |||
. _ .. . = . -- . -_ . .. _. . | |||
A.. OPERATING DATA REPORT Docket No: 50-457 | |||
* Unit: Braidwo >d 2 Date: 12/03/97 Completed by: Don Hildeb ant - | |||
- Telephone: 815-458-280lx2173 ' | |||
REPORTING PERIOD: November 1997 | |||
!~ 1) Design Electrical Rating (Mwe Net) . 1120 | |||
: 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative | |||
: 3) Hours Reactor Critical (Hours) 393.0 6,848.0 67,637.1 | |||
: 4) Hours Generator on Line (Hours) 364.0 6,819.0 67,195.1 | |||
_5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 | |||
: 6) Net Electrical Energy (Mwh) 257,814 7,387,795 69,025,873 r! | |||
. _ _ _ _ _ _ _ _ _ = _ _ _ _ _ . _ _ _ _ . _ | |||
. . . .. .. . . .= . | |||
-~. | |||
;_ e l . | |||
D.. UNIT SHUTDOWNS . | |||
I Docket No.: 457 ~* | |||
Unit: Braidwood 2 Date: -12/03/97'- - | |||
Completed by . . Don Hildebrant REPORT PERIOD; November 1997 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments | |||
[ 1 970927 S 356 C 4 Scheduled sixth refueling outage continues | |||
*"SUMMARP" Unit 2 entered the month continuing the sixth scheduled refueling outage and returned to normal service begining on 11/14/97. . | |||
TYPE REASC,N METHOD F - Forced A - Equipment Failum (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory I?estriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Cther (explain) . | |||
F - Administrative G - Operator Error (explain) | |||
H - Other (explain) | |||
.t t | |||
C. SAFETYI REUEF VALVE OPERATIONS _ | |||
~ | |||
Docket No.: 50 - 457 | |||
* Unit: Braidwood 2 Date: '12/03/97 ~- | |||
Completed by: Don Hildebrant Telephone: 815-453-2801x2173 Valves No. & Type . Plant - | |||
Date Actuated Actuation Condition Description of Event None 1 | |||
s | |||
( | |||
i I | |||
l I | |||
[ | |||
i f | |||
* - .-}} |
Latest revision as of 11:01, 1 January 2021
ML20202H623 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 11/30/1997 |
From: | Hildebrant D, Schwartz G COMMONWEALTH EDISON CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
BW-97-0065, BW-97-65, NUDOCS 9712100328 | |
Download: ML20202H623 (9) | |
Text
__
. Commonwea;th IAiwn O>mpany
- Draldwx1 Generating Nation
. - Route 81, llox 8 i -
f)ramille.11. NH07-9619 Tel HI5-14 bull December 3,1997 BW/97-0065 United States Nuclear Regulatory Comm%sion
-- Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for November,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Docket Nos. 50-456 and 50-457 Ladies rad Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will Fnd the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period November 1,1997 through November 30,1997.
Please address any comments or questions regarding this matter to Don Hildebrant at (815) 458-2801, extension 2173.
Very truly yours, U. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCH/dah !
onCORREsPZCsTECif BW97 0065. Doc y )
Enclosures cc: A. B. Beach, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident Inspector - B.aidwood Office of Nuclear Facility Safety - IDNS 4 nnOd3 9712100328 97113o
- h,b h l
- A Unicom Cor.pany
i
- 1 ,
cc: INPO Records Center D. L. Farrar, Nuclear Regional Sersice Mgr.
D.J. Chrzanowski, Nuclear Licensing Admin.
D. P. Eggett, Nuclear Engineering Dept.
T. Tulon, Site Vice President, Braidwood D. M Hoots, Unit i Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunceicky, Westinghouse D. R. Scavers, A.N 1.
S. P. Focht, American Nuclear Insurers
_ . _ .. . _ . . _ . . _ . . - - . . _ . _ ~. . _ _ _ . _ _ . _ _
lk
, t
. BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 I MONTHLY OPERATING REPORT L
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPI-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 4
f A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 12/03/97 Completed by: Don Hildebrant Telephone: 815-458 280lx2173 REPORTING PERIOD: November 1997
- 1) Design Electrical Rating (Mwn ut) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Y%r To Date Cumulative
- 3) Hours Reactor Critical (Hours) 720.0 6,632.7 64,658.1
- 4) Hours Generator on Line (Hours) 720.0 6,594.7 63,798.4
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Not Electrical Energy (Mwh) 806,593 7,246,879 65,308,280
B. UNIT SHUTDOWNS Docket No.: 50 - 456 '
Unit Braidwood 1 Date: 12/03/97 -
Completed by- Don liildebrrmt Telephone: 315-458-2801x2173 REPORT PERIOD: November 1997 Type Duration Reason Method Caure and Corrective Actions
% Date Hours and Comments None
SUMMARY
Unit 1 entered the month at 100% capability and operated routinely forit i entire month.
REASON METHOD TYPE A - Equipment Failure (explain) 1 - Manual F - Forced 2 - Manual Trip / Scram S - Scheduled B - Maintenance or Test l
C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain) l l
1
C. SAFETY / RELIEF VAO!E OPERATIONS Docket No.: 50 - 456 "
Unit: Braidwood 1 Date: 12/03/97 -
Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves Nc. & Type Plant Condition Description of Event Date . Actuated c Actuation None l
l 1
l
. _ .. . = . -- . -_ . .. _. .
A.. OPERATING DATA REPORT Docket No: 50-457
- Unit: Braidwo >d 2 Date: 12/03/97 Completed by: Don Hildeb ant -
- Telephone: 815-458-280lx2173 '
REPORTING PERIOD: November 1997
!~ 1) Design Electrical Rating (Mwe Net) . 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative
- 3) Hours Reactor Critical (Hours) 393.0 6,848.0 67,637.1
- 4) Hours Generator on Line (Hours) 364.0 6,819.0 67,195.1
_5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Net Electrical Energy (Mwh) 257,814 7,387,795 69,025,873 r!
. _ _ _ _ _ _ _ _ _ = _ _ _ _ _ . _ _ _ _ . _
. . . .. .. . . .= .
-~.
- _ e l .
D.. UNIT SHUTDOWNS .
I Docket No.: 457 ~*
Unit: Braidwood 2 Date: -12/03/97'- -
Completed by . . Don Hildebrant REPORT PERIOD; November 1997 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments
[ 1 970927 S 356 C 4 Scheduled sixth refueling outage continues
- "SUMMARP" Unit 2 entered the month continuing the sixth scheduled refueling outage and returned to normal service begining on 11/14/97. .
TYPE REASC,N METHOD F - Forced A - Equipment Failum (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory I?estriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Cther (explain) .
F - Administrative G - Operator Error (explain)
H - Other (explain)
.t t
C. SAFETYI REUEF VALVE OPERATIONS _
~
Docket No.: 50 - 457
- Unit: Braidwood 2 Date: '12/03/97 ~-
Completed by: Don Hildebrant Telephone: 815-453-2801x2173 Valves No. & Type . Plant -
Date Actuated Actuation Condition Description of Event None 1
s
(
i I
l I
[
i f
- - .-