ML20202H623: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:__
      .          Commonwea;th IAiwn O>mpany
    -            Draldwx1 Generating Nation
.              - Route 81, llox 8 i -
f)ramille.11. NH07-9619 Tel HI5-14 bull December 3,1997 BW/97-0065 United States Nuclear Regulatory Comm%sion
                -- Attention: Document Control Desk Washington, D.C. 20555-0001
 
==Subject:==
Monthly Operating Report for November,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Docket Nos. 50-456 and 50-457 Ladies rad Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will Fnd the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period November 1,1997 through November 30,1997.
Please address any comments or questions regarding this matter to Don Hildebrant at (815) 458-2801, extension 2173.
Very truly yours, U. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCH/dah                                                                            !
onCORREsPZCsTECif BW97 0065. Doc                                                y    )
Enclosures cc:      A. B. Beach, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident Inspector - B.aidwood Office of Nuclear Facility Safety - IDNS 4    nnOd3 9712100328 97113o
* h,b h    l
: A Unicom Cor.pany
 
i
* 1            ,
cc:  INPO Records Center D. L. Farrar, Nuclear Regional Sersice Mgr.
D.J. Chrzanowski, Nuclear Licensing Admin.
D. P. Eggett, Nuclear Engineering Dept.
T. Tulon, Site Vice President, Braidwood D. M Hoots, Unit i Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunceicky, Westinghouse D. R. Scavers, A.N 1.
S. P. Focht, American Nuclear Insurers
 
_    . _  ..      . _ .        . _ . . _ . . - - . . _ . _ ~. . _ _ _ . _ _ . _ _
lk
                  ,                                                                                t
.                            BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2                                            I MONTHLY OPERATING REPORT L
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPI-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 4
 
f              A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 12/03/97 Completed by: Don Hildebrant Telephone: 815-458 280lx2173 REPORTING PERIOD: November 1997
: 1) Design Electrical Rating (Mwn ut)                                      1120
: 2) Maximum Dependable Capacity (Mwe Net)                                  1100 Month                      Y%r To Date    Cumulative
: 3) Hours Reactor Critical (Hours)                                    720.0                      6,632.7        64,658.1
: 4) Hours Generator on Line (Hours)                                    720.0                      6,594.7        63,798.4
: 5) Unit Reserve Shutdown Hours (Hours)                                            0.0                0.0                        0.0
: 6) Not Electrical Energy (Mwh)                              806,593                          7,246,879      65,308,280
 
B.        UNIT SHUTDOWNS                                                                                      Docket No.:  50 - 456        '
Unit Braidwood 1 Date: 12/03/97      -
Completed by-  Don liildebrrmt Telephone:    315-458-2801x2173 REPORT PERIOD:    November 1997 Type    Duration Reason Method        Caure and Corrective Actions
                %      Date Hours                                  and Comments None
 
==SUMMARY==
Unit 1 entered the month at 100% capability and operated routinely forit i entire month.
REASON                                                METHOD TYPE A - Equipment Failure (explain)                      1 - Manual F - Forced                                                                        2 - Manual Trip / Scram S - Scheduled                B - Maintenance or Test l
C - Refueling                                        3 - Automatic Trip / Scram D - Regulatory Restriction                            4 - Continuation E - Operator Training / Licensee Examination          5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain) l l
1
 
C.      SAFETY / RELIEF VAO!E OPERATIONS                        Docket No.:    50 - 456      "
Unit:  Braidwood 1 Date: 12/03/97    -
Completed by:  Don Hildebrant Telephone:    815-458-2801x2173 Valves      Nc. & Type  Plant Condition  Description of Event Date .            Actuated c            Actuation None l
l 1
l
 
                                                          . _ ..      . = .    --    .      -_      .        ..                        _.      .
A.. OPERATING DATA REPORT Docket No: 50-457
* Unit: Braidwo >d 2 Date: 12/03/97 Completed by: Don Hildeb ant -
                                                                                                        - Telephone: 815-458-280lx2173 '
REPORTING PERIOD: November 1997
!~                                        1) Design Electrical Rating (Mwe Net) .            1120
: 2) Maximum Dependable Capacity (Mwe Net)            1100 Month            Year To Date              Cumulative
: 3) Hours Reactor Critical (Hours)                  393.0                6,848.0                67,637.1
: 4) Hours Generator on Line (Hours)                364.0                6,819.0                67,195.1
_5) Unit Reserve Shutdown Hours (Hours)                0.0                      0.0                      0.0
: 6) Net Electrical Energy (Mwh)                  257,814              7,387,795              69,025,873 r!
  . _ _ _ _ _ _ _ _ _ = _ _ _ _ _ . _ _ _ _ . _
 
                                            .  .          .      ..  ..      .          .                        .=                                        .
                                                                                                                                                              -~.
;_                                                                                                                                                          e l                                                                                                                                                              .
D.. UNIT SHUTDOWNS                                                                                                                    .
I Docket No.: 457        ~*
Unit:  Braidwood 2 Date: -12/03/97'- -
Completed by . . Don Hildebrant REPORT PERIOD;      November 1997 h        Date    Type    Duration Reason Method          Cause and Corrective Actions Hours                                  and Comments
[            1      970927      S        356        C        4      Scheduled sixth refueling outage continues
  *"SUMMARP" Unit 2 entered the month continuing the sixth scheduled refueling outage and returned to normal service begining on 11/14/97.                                      .
TYPE                        REASC,N                                              METHOD F - Forced                  A - Equipment Failum (explain)                        1 - Manual S - Scheduled                B - Maintenance or Test                              2 - Manual Trip / Scram C - Refueling                                        3 - Automatic Trip / Scram D - Regulatory I?estriction                          4 - Continuation E - Operator Training I Licensee Examination          5 - Cther (explain) .
F - Administrative G - Operator Error (explain)
H - Other (explain)
                                                                                                                                                                    .t t
 
C. SAFETYI REUEF VALVE OPERATIONS                                                            _
                                                                                                      ~
Docket No.:      50 - 457
* Unit:  Braidwood 2 Date: '12/03/97 ~-
Completed by:      Don Hildebrant Telephone:        815-453-2801x2173 Valves            No. & Type . Plant -
Date            Actuated            Actuation    Condition  Description of Event None 1
s
(
i I
l I
[
i f
                                                                          *      -              .-}}

Latest revision as of 11:01, 1 January 2021

Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2
ML20202H623
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/30/1997
From: Hildebrant D, Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-97-0065, BW-97-65, NUDOCS 9712100328
Download: ML20202H623 (9)


Text

__

. Commonwea;th IAiwn O>mpany

- Draldwx1 Generating Nation

. - Route 81, llox 8 i -

f)ramille.11. NH07-9619 Tel HI5-14 bull December 3,1997 BW/97-0065 United States Nuclear Regulatory Comm%sion

-- Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for November,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Docket Nos. 50-456 and 50-457 Ladies rad Gentlemen:

In accordance with Technical Specification 6.9.1.8, enclosed you will Fnd the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period November 1,1997 through November 30,1997.

Please address any comments or questions regarding this matter to Don Hildebrant at (815) 458-2801, extension 2173.

Very truly yours, U. K. Schwartz Station Manager Braidwood Nuclear Station GKS/DCH/dah  !

onCORREsPZCsTECif BW97 0065. Doc y )

Enclosures cc: A. B. Beach, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident Inspector - B.aidwood Office of Nuclear Facility Safety - IDNS 4 nnOd3 9712100328 97113o

  • h,b h l
A Unicom Cor.pany

i

  • 1 ,

cc: INPO Records Center D. L. Farrar, Nuclear Regional Sersice Mgr.

D.J. Chrzanowski, Nuclear Licensing Admin.

D. P. Eggett, Nuclear Engineering Dept.

T. Tulon, Site Vice President, Braidwood D. M Hoots, Unit i Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunceicky, Westinghouse D. R. Scavers, A.N 1.

S. P. Focht, American Nuclear Insurers

_ . _ .. . _ . . _ . . _ . . - - . . _ . _ ~. . _ _ _ . _ _ . _ _

lk

, t

. BRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 I MONTHLY OPERATING REPORT L

Comed NRC DOCKET NO. 050-456, LICENSE NO. NPI-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 4

f A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 12/03/97 Completed by: Don Hildebrant Telephone: 815-458 280lx2173 REPORTING PERIOD: November 1997

1) Design Electrical Rating (Mwn ut) 1120
2) Maximum Dependable Capacity (Mwe Net) 1100 Month Y%r To Date Cumulative
3) Hours Reactor Critical (Hours) 720.0 6,632.7 64,658.1
4) Hours Generator on Line (Hours) 720.0 6,594.7 63,798.4
5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
6) Not Electrical Energy (Mwh) 806,593 7,246,879 65,308,280

B. UNIT SHUTDOWNS Docket No.: 50 - 456 '

Unit Braidwood 1 Date: 12/03/97 -

Completed by- Don liildebrrmt Telephone: 315-458-2801x2173 REPORT PERIOD: November 1997 Type Duration Reason Method Caure and Corrective Actions

% Date Hours and Comments None

SUMMARY

Unit 1 entered the month at 100% capability and operated routinely forit i entire month.

REASON METHOD TYPE A - Equipment Failure (explain) 1 - Manual F - Forced 2 - Manual Trip / Scram S - Scheduled B - Maintenance or Test l

C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain) l l

1

C. SAFETY / RELIEF VAO!E OPERATIONS Docket No.: 50 - 456 "

Unit: Braidwood 1 Date: 12/03/97 -

Completed by: Don Hildebrant Telephone: 815-458-2801x2173 Valves Nc. & Type Plant Condition Description of Event Date . Actuated c Actuation None l

l 1

l

. _ .. . = . -- . -_ . .. _. .

A.. OPERATING DATA REPORT Docket No: 50-457

  • Unit: Braidwo >d 2 Date: 12/03/97 Completed by: Don Hildeb ant -

- Telephone: 815-458-280lx2173 '

REPORTING PERIOD: November 1997

!~ 1) Design Electrical Rating (Mwe Net) . 1120

2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative
3) Hours Reactor Critical (Hours) 393.0 6,848.0 67,637.1
4) Hours Generator on Line (Hours) 364.0 6,819.0 67,195.1

_5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0

6) Net Electrical Energy (Mwh) 257,814 7,387,795 69,025,873 r!

. _ _ _ _ _ _ _ _ _ = _ _ _ _ _ . _ _ _ _ . _

. . . .. .. . . .= .

-~.

_ e l .

D.. UNIT SHUTDOWNS .

I Docket No.: 457 ~*

Unit: Braidwood 2 Date: -12/03/97'- -

Completed by . . Don Hildebrant REPORT PERIOD; November 1997 h Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments

[ 1 970927 S 356 C 4 Scheduled sixth refueling outage continues

  • "SUMMARP" Unit 2 entered the month continuing the sixth scheduled refueling outage and returned to normal service begining on 11/14/97. .

TYPE REASC,N METHOD F - Forced A - Equipment Failum (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory I?estriction 4 - Continuation E - Operator Training I Licensee Examination 5 - Cther (explain) .

F - Administrative G - Operator Error (explain)

H - Other (explain)

.t t

C. SAFETYI REUEF VALVE OPERATIONS _

~

Docket No.: 50 - 457

  • Unit: Braidwood 2 Date: '12/03/97 ~-

Completed by: Don Hildebrant Telephone: 815-453-2801x2173 Valves No. & Type . Plant -

Date Actuated Actuation Condition Description of Event None 1

s

(

i I

l I

[

i f

  • - .-