ML20148C193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000443/1978012]]
{{Adams
| number = ML20148C193
| issue date = 09/12/1978
| title = Insp Repts 50-443/78-12 & 50-444/78-12 on 780726-0811.No Noncompliance Noted.Major Areas Inspected:Alleged Blasting & Other Work Being Done After CPs Suspended
| author name = Devlin J, Folsom S, Smith R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =
| addressee affiliation =
| docket = 05000443, 05000444
| license number =
| contact person =
| document report number = 50-443-78-12, 50-444-78-12, NUDOCS 7811010135
| package number = ML20148C144
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 12
}}
See also: [[see also::IR 05000444/1978012]]
 
=Text=
{{#Wiki_filter:)
  '
                                U.S. NUCLEAR REGULATORY COMMISSION                              l
    .Q '                      0FFICE OF INSPECTION AND ENFORCEMENT                            l
                  50-443/78-12
    Report No.    50-444/78-12
                  50-443                                                                        l
    Docket No.    50-444                                                                        l
                                                                                                l
                  CPPR-135                                                                      l
    License No. cppR-136                  Group      4          Category        A-2            l
    Licensee:    Public Service Company of New Hampshire
                                                                                                1
                  1000 Elm Streeti                                                              '
                                                                                                l
                  Manchester. New Hampshire 03105                                                I
    Facility Name:    Seabrook Station. Units 1 and 2                                          l
    Investigation at:      Seabrook, New Hampshire
    Investigation conducte        July 26 - August 11, 1978
    Investigators:                      ,      t hM
                      'R./H. Smithanvestigation dpecialist                '
                                                                            9              7    i
                                                                                  da    signed
                                                  9                                            )
                          e          i2 xw-                                  9    /2.72
                        S. A. 761som, Reactor Inspector                        / date ' signed
                                                                                  date signed
                                  s
                                                                                  date signed
    Approved by:    O/J'                                                    m ,/, , /yf
                    [J.W. Devlin, Chief,Securityand                        / /'dat# signed
                          Investigation Section
    Investigation Summary:
    Investigation from July 26 to August 11, 1978 (Report Nos. 50-443/78-12 and
    50-444/78-12)
    Areas Investigated: Unannounced investigation by one regional based investigator
    and one regional based inspector, of complaints concerning blasting and other
    unauthorized work being performed after the construction permits were suspended
,
    on July 21, 1978. The investigation involved 114 investigative-hours by an NRC
l  regional based investigator and a regional based inspector.
    Resul ts: The noise and earth tremor which formed the basis of a complaint about
    blasting were observed. No information or evidence was found to indicate that
    any of the complaints were related to violations of regulatory requirements or
l  violations of the Commission Order. No apparent items of noncompliance were
    identified.
  Region I Form 143
  (Rev. October 1977) E1010/ W
 
              -    ..    --          ..            ..      ..        -.  .    . - . . . _ _  - ,
  .  .
    .
I
                                                                                                      k
                                          TABLE OF CONTENTS-
        I.      BACKGROUND
                A.    Reason for Investigation
                B.    Order of the Nuclear: Regulatory Comission
                C.    Identification of Involved Organizations                                      ,
        II.      SUMMARY OF FINDINGS                                                                  ,
                A.    Complaints and Investigation Findings
                B..    Conclusions
        III'. DETAILS _
                A.    Introduction
                B.    Scope of Investigation
                C.    Persons Directly Interviewed and/or Contacted during the NRC
                          Investigation-
              - D.    NRC Coments and Findings Regarding the Complaints
                E.    Management Meetings
                                                                                                      :
                                                                                                .
                                                                                                      L
 
                                            .
.  .
  .
                                                                                I
                                  I BACXGROUND
      A. Reason for Investigation
        During the period from July 26 to July 31, 1978, the Nuclear Re-
        gulatory Commission (NRC, Region I) received several telephone
        calls from members of the public who reside in the vicinity of the
        Seabrook Station site. In each case, the individuals stated that
        blasting was continuing on the site even though the construction
        permits for the Seabrook Units i and 2 were suspended effective        ,
        6:00 p.m.-(EDT) on July 21, 1978.
                                                                                !
                                                                                ,
        An investigation regarding these complaints was initiated by the
        NRC, Region ILon July 26, 1978.
      B. Order of the Nuclear Regulatory Commission                            ,
        By Order of the NRC on June 30, 1978, the construction permits for
        the Seabrook Station, Units 1 and 2, were suspended effective 6:00
        p.m. (EDT) on July 21, 1978.
        The Order permitted, "only such actions as are necessary to protect
        the environmental integrity of the site or to protect buildings,
        material or personnel at the site."
      C. Identification of Involved Organizations
        Public Service Company of New Hampshire
        1000 Elm Street
        Manchester, New Hampshire 03105
        A utility company, the licensee, which has been issued a Construc-
        tion Permit for the construction of two nuclear fueled power stations,
        Seabrook Units 1 and 2.
          .
 
.  .
      -
  .
                              II SUMMARY OF FINDINGS
      A. Complaints and Investigation Findings
        The following complaints were obtained by telephone calls to the
        Region I office and also during interviews of individuals in and
        around Seabrook, New Hampshire. All complainants were aware that
        the construction permits for Seabrook Units 1 and 2 were suspended
        effective 6:00 p.m. (EDT) on July 21, 1978.
        1.  Complaint No. 1
              That blasting was continuing on the site after July 21, 1978.
              The NRC investigation found no information or evidence that
              any explosives were used on the site during the period from
              6:00 p.m. on July 21, 1978 through August 5,1978, which was
              the end of the onsite portion of this investigation.
        2.  Complaint No. 2
              That construction activities at the site had not ceased, for
              the following reasons:
              --    Large numbers of people entering and leaving the site on
                    all shifts.
              --    Tower cranes in different orientations from one day to
                    the next.
              --
                    Motors roaring throughout the night.
              --
                    Sounds of trucks dumping large rocks.
              --
                    Dump truck tailgates slamming.
              --    Trees being cut down.
              --    A truck loaded with crushed rock entering plant.
              The NRC investigation found that the Order of the Nuclear
              Regulatory Commission which suspended the construction permits
              was being complied with and that only those actions permitted
                by the Order were being performed.
 
    .
      .
                                      3                              l
                                                                      1
      8. Conclusions                                                  1
                                                                      I
        1.  No items of noncompliance were identified during the in- I
              vestigation.                                            l
                                                                        l
        2.  There were no violations of the NRC Order identified.
                                                                      l
  .
                                                                      i
                                                                        l
                                                                      !
                                                                      l
                                                                        .
                                                        .
                                                                      .
                                                                        1
l
 
  . _ _ _ _ _ _
                  .
                    -
                .
                                                                III DETAILS
                  A.            Introduction-
                                Pursuant to the Nuclear Regulatory Commission Order on June 30,
                                1978, the Seabrook Station Units 1 and 2 construction permits were
                                suspended effective 6:00 p.m. (EDT) on July 21, 1978.
                                An inspection lwas conducted by a NRC Region I representative on
                                July 21-27, 1978. The purpose of this inspection was to insure, by
                                observation, interviews, and examination of applicable records,
                                that the NRC Order to halt construction had been fully and correctly
                                implemented.
                                This investigation was initiated as a result of the NRC receiving
                                telephone complaints that blasting and construction activities had
                                not ceased as of July 21, 1978.
                    B.          Scope of Investigation
                                This investigation included an examination of pertinent documents
                                and records, interviews and contacts with individuals having signi-
                                ficant information, and observations by the investigators while at
                                the Seabrook Station Unit 1 and 2 sites. It also included interviews
                                and contacts with the complainants, individual members of the
                                public, Pease Air Force Base and the Federal Aviation Administration.
                                The scope of this investigation was limited to those complaints
                                relating to the suspension of the construction permits.
                    C.        ' Persons Directly Interviewed and/or Contacted during the NRC
                                Investigation
                                Yankee Atomic Electric Company
                                R. S. Faulkner, Jr., Section Leader, Field Monitoring
i                              J. H. Herrin, Site Manager
                                F. R. Kotowski, Manager, Educational Center
                                P. A. Nason, Staff Engineer
                                R. P. Pizzuti, Construction Manager
                                J. W. Singleton, Field Quality Assurance Manager
                                R. B. Staples, Civil Supervisor
                                A. J. Stewart, Site Geologist
                                I 0ffice    of Inspection and Enforcement Inspection Report Numbers
                                  50-443/78-11 and 50-444/78-11.
        . - -          _ _ _ _        . _ _ .
 
  .
    .
                                        5
                                                                                l
        United Engineers and Constructors
        R. N. Moyer, Field Superintendent Quality Assurance / Quality            l
          Control
        Pittsburgh Testing Laboratory
        H. Ruffner, Site Manager / Test Laboratory Supervisor
        Morrison - Knudsen Company, Inc.                                      -
        J. N. Allan, Project Manager
        D. Downs, Engineer
        J. Hendrix, Engineer
        J. P. Nossereau, Assistant Project Manager
        R. Obradovic, Project Engineer
        Pease Air Force Base
        E. L. Byrd, Disaster Preparedness Officer
        Federal Aviation Administration
        C. Hudnall, Planning and Appraisal Staff
        Others
        The complainants and other individual members of the public.
    D. NRC Comments and Findings Regarding the Complaints
        1.    Complaint No. 1
              (a)  Complaint
                  That blasting was continuing on the site after July 21,
                  1978.
              (b)  NRC Comments
                  The investigators interviewed several individuals re-
                  garding the blasting noise and/or ground tremors which
                    they believed to be related to blasting at the Seabrook
                    site subsequent to 6:00 p.m. on July 21, 1978. The          '
                    following information was compiled from records maintained
                  by the individuals and shows the approximate time of day
                    for the reported sounds and/or ground tremors.
l
 
                                                    _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____
  .
      -
    .
                                  6
        6:30 AM - 1 reported sound on      8-1-78
        7:10 AM - 1 reported sound on        7-29-78
        8:00 AM - 2 reported sounds on      7-22-78
                - 1 reported sound on      7-23-78
        8:10 AM -
                  1 reported sound on        7-24-78
        8:20 AM -
                  3 reported sounds on      7-20-78
                -
                  3 reported sounds on      7-21- /8
                -
                  3 reported sounds on      7-22-78
                -
                  2 reported sounds on      7-23-78
                -
                  3 reported sounds on      7-24-78
                -
                  2 reported sounds on      7-25-78
                -
                  3 reported sounds on      7-26-78
                -
                  5 reported sounds on      7-27-78
                - 5 reported sounds on      7-28-78
                -
                  3 reported sounds on      7-29-78
                - 3 reported sounds on      7-30-78
                -
                  6 reported sounds on      7-31-78
                -
                  1 reported sound each day during
l
                    the period of 8-1 thru 8-10-78
,
        8:30 AM -
                  2 reported sounds on      7-22-78
                -
                  3 reported sounds on      7-25-78
l                - 3 reported sounds on      7-26-78
l        9:30 AM - 1 reported sound on      7-22-78
        9:50 AM -
                  2 reported sounds on      7-23-78
,
                -
                  1 reported sound on      7-24-78
l
                -
                  2 reported sounds on      7-26-78
l                - 2 reported sounds on      7-27-78
                -
                  3 reported sounds on      7-29-78
                -
                  1 reported sound on      7-30-78
                - 1 reported sound on      7- 31-78
                -
                  4 reported sounds on      8-4-78
                -
                  1 reported sound on      8-5-78
        10:45 AM -
                  1 reported sound on      7- 31-78
        11:20 AM -
                  1 reported sound on      8-1-78
        12:40 AM -
                  1 reported sound on      7-29-78
        2:15 PM -
                  1 reported sound on      7-29-78
        2:45 PM -
                  1 reported sound on      7-22-78
        3:00 PM -
                  2 reported sounds on      7-22-78
                - 1 reported sound on      7-23-78
                - 1 reported sound on      7-25-78
        3:30 PM - 3 reported sounds on      7-29-78
 
                                                    _ _ _ _ _ _ _ _ _ - _ _ _ _ _
                                                                                  _ _ _ _ _ - _ _ -
.
  .
                                        7
        3:55 PM  -
                        1 reported sound on        7-27-78
                  -
                        1 reported sound on        7-28-78
        4:30 PM  -
                        1 reported sound on        7-22-78
        5:50 PM -      1 reported sound on      8-2-78
                  -
                        1 reported sound on      8-4-78
  There was general agreement that the reports from 8:20 to 8:30 AM; at
  9:50 AM; and, from 3:00 to 3:30 PM were louder than others and created
  more vibration.
                  During a discussion at one residence, at about 9:55 a.m.
                  on August 3,1978, the investigators and all present
                  heard a sound and felt a tremor similar to others that
                  those present had previously reported. An immediate
                  telephone call to neighbors confirmed that they had heard
                  and felt it also.  No other similar sounds were heard by
                  the investigators while in the Seabrook, New Hampshire
                  area during the period from August 2 through August 5,
                  1978.
                  During an inspection conducted at the Seabrook, construc-
                  tion site, the investigators examined blasting areas,
                  explosives magazines (all found to,be empty), photographed
                  dump area for blasted rock from ground level and also
                  aerial to provide a method of comparing change, inter-
                  viewed blasting personnel, and examined blasting records
                  and explosive material accounting records. The documenta-
                  tion provided to the investigators indicated that the
                  final explosive charge which was detonated prior to the
                  suspension orders occurred on July 21,1978 at 11:48 a.m.
                  in the Unit 1 foundation. Documentation also confirmed
                  that all explosive materials were removed from the site
                  on July 25, 1978.  This information was also confirmed by
                  discussions with the involved individuals.
                  The investigators contacted the Pease Air Force Base,
                  Portsmouth, New Hamphsire, and were informed that no
                  similar complaints of sounds had been received at that
                  location.
                  The investigators contacted the Federal Aviation Admin-
                istration (FAA), Burlington, Massachusetts and were in-
                  formed that they had received reports from citizens in
                  the Boston North Shore Area and southern New Hampshire of
                  sounds similar to those reported to the NRC.
 
  .                                                                            :
    *
                                                                              l
<
                                          8                                  !
                                                                              \
                    The FAA has installed a sound monitoring device in        l
                    Cambridge and is continuing an evaluation to determine    l
                    the cause of the sound.                                  i
                                                                              l
                (c) NRC Findings
                    The NRC investigation found no information or evidence    ;
                    that any explosives were used on the site during the      j
                    period from 6:00 p.m. on July 21, 1973, through August 5, !
                    1978, which was the end of the onsite portion of this    j
                    investigation.
          2.    Complaint No. 2
                (a) Complaint
                                                                              i
                                                                              ;
                    That construction activities at the site had not ceased,
                    for-the following reasons:
                    --
                          Large numbers of people entering and leaving the
                          site on all shifts.
                    --    Tower cranes in different orientations from one day
                          to the next.
                    --    Motors roaring throughout the night.
                    --    Sounds of trucks dumping large rocks.
                                                                              i
                    --    Dump truck tailgates slamming.
                    --    Trees being cut down.
                    --    A truck loaded with crushed rock entering plant.
                (b)  NRC Comments                                              l
                    An inspection l was conducted prior to initiation of this l
                    investigation to insure that, the NRC Order to halt con-
                    struction had been fully and correctly implemented.
                                                                              i
    10ffice-of Inspection and Enforcement Inspection Report Numbers
      50-443/78-11.and 50-444/78-11..
l
 
                                                              ---
      .
  .
                                                      9
              During this investigation, all plant areas were examined
              for evidence of unauthorized work being performed. Areas
              examined included the offshore jackup barge, onshore
              tunnel shaft area, reactor building excavations, cooling
            water pumphouse excavation, concrete and ironwork, con-
              crete batch plant, settling basins, storage buildings,
              rock dumps, maintenance and testing shops, laydown areas,
              office areas, and the Educational Center area.
            The investigators observed authorized activities of an
              environmental nature in progress, which included ditching
              and seeding work on the borders of the new plant access
              road, planting and seeding adjacent to the Educational
              Center, watering-down of dusty roads and parking areas,
              and removal of water from some low elevations by pumping.
              Equipment was also observed being loaded onto trucks for
              removal from the site.
              The investigators determined that the total work force at
              the site on July 21, 1978 had been reduced by 62 percent
              as of August 2,1978. There were individuals assigned on
              all shifts with the majority being on day shift.      On
              August 2, 1978, supervision and office workers accounted
i              for 75 percent of the total work force.
l              The investigators found that tower cranes did change in
              orientation which was a normal condition since they are
                free to turn in the wind when not in use. The other
                reported complaints were correlated with activities on
              site and none were found related to site activities which
              were not permissible.
                In addition to direct observation of the site, the in-
                vestigators took ground and aerial photographs to provide
                a method of comparing change.
        (c) NRC Findings
              The NRC investigation found that the Order of the Nuclear
                Regulatory Comission which suspended the construction
                permits was being complied with and that only those
                actions permitted by the Order were being performed.
L  _        _ _ _ _______    - - - - - - - - - - - _
                                            _          - . _
 
                                                                  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
  .
        -
    . .
                                            10
l
          E. Management Meetings
j
            On July 26, 1978, the investigator discussed the reason for the
t            investigation with Mr. J. H. Herrin, Site Manager.
            On August 8, 1978, during a telephone discussion with Mr. Herrin,
            the investigator discussed the investigation findings and informed
            the licensee that no items of noncompliance had been identified.
                                                                                                                          .
                                                                                                                            t
                                                                                                                          /
                                                                                                                              s
                                                                                                                                  l \
                                                                                                                      .
                                                                                                                        t
                                                                                                                                ,
L.
}}

Revision as of 17:14, 21 July 2020

Insp Repts 50-443/78-12 & 50-444/78-12 on 780726-0811.No Noncompliance Noted.Major Areas Inspected:Alleged Blasting & Other Work Being Done After CPs Suspended
ML20148C193
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/12/1978
From: Devlin J, Folsom S, Rich Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20148C144 List:
References
50-443-78-12, 50-444-78-12, NUDOCS 7811010135
Download: ML20148C193 (12)


See also: IR 05000444/1978012

Text

)

'

U.S. NUCLEAR REGULATORY COMMISSION l

.Q ' 0FFICE OF INSPECTION AND ENFORCEMENT l

50-443/78-12

Report No. 50-444/78-12

50-443 l

Docket No. 50-444 l

l

CPPR-135 l

License No. cppR-136 Group 4 Category A-2 l

Licensee: Public Service Company of New Hampshire

1

1000 Elm Streeti '

l

Manchester. New Hampshire 03105 I

Facility Name: Seabrook Station. Units 1 and 2 l

Investigation at: Seabrook, New Hampshire

Investigation conducte July 26 - August 11, 1978

Investigators: , t hM

'R./H. Smithanvestigation dpecialist '

9 7 i

da signed

9 )

e i2 xw- 9 /2.72

S. A. 761som, Reactor Inspector / date ' signed

date signed

s

date signed

Approved by: O/J' m ,/, , /yf

[J.W. Devlin, Chief,Securityand / /'dat# signed

Investigation Section

Investigation Summary:

Investigation from July 26 to August 11, 1978 (Report Nos. 50-443/78-12 and

50-444/78-12)

Areas Investigated: Unannounced investigation by one regional based investigator

and one regional based inspector, of complaints concerning blasting and other

unauthorized work being performed after the construction permits were suspended

,

on July 21, 1978. The investigation involved 114 investigative-hours by an NRC

l regional based investigator and a regional based inspector.

Resul ts: The noise and earth tremor which formed the basis of a complaint about

blasting were observed. No information or evidence was found to indicate that

any of the complaints were related to violations of regulatory requirements or

l violations of the Commission Order. No apparent items of noncompliance were

identified.

Region I Form 143

(Rev. October 1977) E1010/ W

- .. -- .. .. .. -. . . - . . . _ _ - ,

. .

.

I

k

TABLE OF CONTENTS-

I. BACKGROUND

A. Reason for Investigation

B. Order of the Nuclear: Regulatory Comission

C. Identification of Involved Organizations ,

II. SUMMARY OF FINDINGS ,

A. Complaints and Investigation Findings

B.. Conclusions

III'. DETAILS _

A. Introduction

B. Scope of Investigation

C. Persons Directly Interviewed and/or Contacted during the NRC

Investigation-

- D. NRC Coments and Findings Regarding the Complaints

E. Management Meetings

.

L

.

. .

.

I

I BACXGROUND

A. Reason for Investigation

During the period from July 26 to July 31, 1978, the Nuclear Re-

gulatory Commission (NRC, Region I) received several telephone

calls from members of the public who reside in the vicinity of the

Seabrook Station site. In each case, the individuals stated that

blasting was continuing on the site even though the construction

permits for the Seabrook Units i and 2 were suspended effective ,

6:00 p.m.-(EDT) on July 21, 1978.

!

,

An investigation regarding these complaints was initiated by the

NRC, Region ILon July 26, 1978.

B. Order of the Nuclear Regulatory Commission ,

By Order of the NRC on June 30, 1978, the construction permits for

the Seabrook Station, Units 1 and 2, were suspended effective 6:00

p.m. (EDT) on July 21, 1978.

The Order permitted, "only such actions as are necessary to protect

the environmental integrity of the site or to protect buildings,

material or personnel at the site."

C. Identification of Involved Organizations

Public Service Company of New Hampshire

1000 Elm Street

Manchester, New Hampshire 03105

A utility company, the licensee, which has been issued a Construc-

tion Permit for the construction of two nuclear fueled power stations,

Seabrook Units 1 and 2.

.

. .

-

.

II SUMMARY OF FINDINGS

A. Complaints and Investigation Findings

The following complaints were obtained by telephone calls to the

Region I office and also during interviews of individuals in and

around Seabrook, New Hampshire. All complainants were aware that

the construction permits for Seabrook Units 1 and 2 were suspended

effective 6:00 p.m. (EDT) on July 21, 1978.

1. Complaint No. 1

That blasting was continuing on the site after July 21, 1978.

The NRC investigation found no information or evidence that

any explosives were used on the site during the period from

6:00 p.m. on July 21, 1978 through August 5,1978, which was

the end of the onsite portion of this investigation.

2. Complaint No. 2

That construction activities at the site had not ceased, for

the following reasons:

-- Large numbers of people entering and leaving the site on

all shifts.

-- Tower cranes in different orientations from one day to

the next.

--

Motors roaring throughout the night.

--

Sounds of trucks dumping large rocks.

--

Dump truck tailgates slamming.

-- Trees being cut down.

-- A truck loaded with crushed rock entering plant.

The NRC investigation found that the Order of the Nuclear

Regulatory Commission which suspended the construction permits

was being complied with and that only those actions permitted

by the Order were being performed.

.

.

3 l

1

8. Conclusions 1

I

1. No items of noncompliance were identified during the in- I

vestigation. l

l

2. There were no violations of the NRC Order identified.

l

.

i

l

!

l

.

.

.

1

l

. _ _ _ _ _ _

.

-

.

III DETAILS

A. Introduction-

Pursuant to the Nuclear Regulatory Commission Order on June 30,

1978, the Seabrook Station Units 1 and 2 construction permits were

suspended effective 6:00 p.m. (EDT) on July 21, 1978.

An inspection lwas conducted by a NRC Region I representative on

July 21-27, 1978. The purpose of this inspection was to insure, by

observation, interviews, and examination of applicable records,

that the NRC Order to halt construction had been fully and correctly

implemented.

This investigation was initiated as a result of the NRC receiving

telephone complaints that blasting and construction activities had

not ceased as of July 21, 1978.

B. Scope of Investigation

This investigation included an examination of pertinent documents

and records, interviews and contacts with individuals having signi-

ficant information, and observations by the investigators while at

the Seabrook Station Unit 1 and 2 sites. It also included interviews

and contacts with the complainants, individual members of the

public, Pease Air Force Base and the Federal Aviation Administration.

The scope of this investigation was limited to those complaints

relating to the suspension of the construction permits.

C. ' Persons Directly Interviewed and/or Contacted during the NRC

Investigation

Yankee Atomic Electric Company

R. S. Faulkner, Jr., Section Leader, Field Monitoring

i J. H. Herrin, Site Manager

F. R. Kotowski, Manager, Educational Center

P. A. Nason, Staff Engineer

R. P. Pizzuti, Construction Manager

J. W. Singleton, Field Quality Assurance Manager

R. B. Staples, Civil Supervisor

A. J. Stewart, Site Geologist

I 0ffice of Inspection and Enforcement Inspection Report Numbers

50-443/78-11 and 50-444/78-11.

. - - _ _ _ _ . _ _ .

.

.

5

l

United Engineers and Constructors

R. N. Moyer, Field Superintendent Quality Assurance / Quality l

Control

Pittsburgh Testing Laboratory

H. Ruffner, Site Manager / Test Laboratory Supervisor

Morrison - Knudsen Company, Inc. -

J. N. Allan, Project Manager

D. Downs, Engineer

J. Hendrix, Engineer

J. P. Nossereau, Assistant Project Manager

R. Obradovic, Project Engineer

Pease Air Force Base

E. L. Byrd, Disaster Preparedness Officer

Federal Aviation Administration

C. Hudnall, Planning and Appraisal Staff

Others

The complainants and other individual members of the public.

D. NRC Comments and Findings Regarding the Complaints

1. Complaint No. 1

(a) Complaint

That blasting was continuing on the site after July 21,

1978.

(b) NRC Comments

The investigators interviewed several individuals re-

garding the blasting noise and/or ground tremors which

they believed to be related to blasting at the Seabrook

site subsequent to 6:00 p.m. on July 21, 1978. The '

following information was compiled from records maintained

by the individuals and shows the approximate time of day

for the reported sounds and/or ground tremors.

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ ____

.

-

.

6

6:30 AM - 1 reported sound on 8-1-78

7:10 AM - 1 reported sound on 7-29-78

8:00 AM - 2 reported sounds on 7-22-78

- 1 reported sound on 7-23-78

8:10 AM -

1 reported sound on 7-24-78

8:20 AM -

3 reported sounds on 7-20-78

-

3 reported sounds on 7-21- /8

-

3 reported sounds on 7-22-78

-

2 reported sounds on 7-23-78

-

3 reported sounds on 7-24-78

-

2 reported sounds on 7-25-78

-

3 reported sounds on 7-26-78

-

5 reported sounds on 7-27-78

- 5 reported sounds on 7-28-78

-

3 reported sounds on 7-29-78

- 3 reported sounds on 7-30-78

-

6 reported sounds on 7-31-78

-

1 reported sound each day during

l

the period of 8-1 thru 8-10-78

,

8:30 AM -

2 reported sounds on 7-22-78

-

3 reported sounds on 7-25-78

l - 3 reported sounds on 7-26-78

l 9:30 AM - 1 reported sound on 7-22-78

9:50 AM -

2 reported sounds on 7-23-78

,

-

1 reported sound on 7-24-78

l

-

2 reported sounds on 7-26-78

l - 2 reported sounds on 7-27-78

-

3 reported sounds on 7-29-78

-

1 reported sound on 7-30-78

- 1 reported sound on 7- 31-78

-

4 reported sounds on 8-4-78

-

1 reported sound on 8-5-78

10:45 AM -

1 reported sound on 7- 31-78

11:20 AM -

1 reported sound on 8-1-78

12:40 AM -

1 reported sound on 7-29-78

2:15 PM -

1 reported sound on 7-29-78

2:45 PM -

1 reported sound on 7-22-78

3:00 PM -

2 reported sounds on 7-22-78

- 1 reported sound on 7-23-78

- 1 reported sound on 7-25-78

3:30 PM - 3 reported sounds on 7-29-78

_ _ _ _ _ _ _ _ _ - _ _ _ _ _

_ _ _ _ _ - _ _ -

.

.

7

3:55 PM -

1 reported sound on 7-27-78

-

1 reported sound on 7-28-78

4:30 PM -

1 reported sound on 7-22-78

5:50 PM - 1 reported sound on 8-2-78

-

1 reported sound on 8-4-78

There was general agreement that the reports from 8:20 to 8:30 AM; at

9:50 AM; and, from 3:00 to 3:30 PM were louder than others and created

more vibration.

During a discussion at one residence, at about 9:55 a.m.

on August 3,1978, the investigators and all present

heard a sound and felt a tremor similar to others that

those present had previously reported. An immediate

telephone call to neighbors confirmed that they had heard

and felt it also. No other similar sounds were heard by

the investigators while in the Seabrook, New Hampshire

area during the period from August 2 through August 5,

1978.

During an inspection conducted at the Seabrook, construc-

tion site, the investigators examined blasting areas,

explosives magazines (all found to,be empty), photographed

dump area for blasted rock from ground level and also

aerial to provide a method of comparing change, inter-

viewed blasting personnel, and examined blasting records

and explosive material accounting records. The documenta-

tion provided to the investigators indicated that the

final explosive charge which was detonated prior to the

suspension orders occurred on July 21,1978 at 11:48 a.m.

in the Unit 1 foundation. Documentation also confirmed

that all explosive materials were removed from the site

on July 25, 1978. This information was also confirmed by

discussions with the involved individuals.

The investigators contacted the Pease Air Force Base,

Portsmouth, New Hamphsire, and were informed that no

similar complaints of sounds had been received at that

location.

The investigators contacted the Federal Aviation Admin-

istration (FAA), Burlington, Massachusetts and were in-

formed that they had received reports from citizens in

the Boston North Shore Area and southern New Hampshire of

sounds similar to those reported to the NRC.

.  :

l

<

8  !

\

The FAA has installed a sound monitoring device in l

Cambridge and is continuing an evaluation to determine l

the cause of the sound. i

l

(c) NRC Findings

The NRC investigation found no information or evidence  ;

that any explosives were used on the site during the j

period from 6:00 p.m. on July 21, 1973, through August 5, !

1978, which was the end of the onsite portion of this j

investigation.

2. Complaint No. 2

(a) Complaint

i

That construction activities at the site had not ceased,

for-the following reasons:

--

Large numbers of people entering and leaving the

site on all shifts.

-- Tower cranes in different orientations from one day

to the next.

-- Motors roaring throughout the night.

-- Sounds of trucks dumping large rocks.

i

-- Dump truck tailgates slamming.

-- Trees being cut down.

-- A truck loaded with crushed rock entering plant.

(b) NRC Comments l

An inspection l was conducted prior to initiation of this l

investigation to insure that, the NRC Order to halt con-

struction had been fully and correctly implemented.

i

10ffice-of Inspection and Enforcement Inspection Report Numbers

50-443/78-11.and 50-444/78-11..

l

---

.

.

9

During this investigation, all plant areas were examined

for evidence of unauthorized work being performed. Areas

examined included the offshore jackup barge, onshore

tunnel shaft area, reactor building excavations, cooling

water pumphouse excavation, concrete and ironwork, con-

crete batch plant, settling basins, storage buildings,

rock dumps, maintenance and testing shops, laydown areas,

office areas, and the Educational Center area.

The investigators observed authorized activities of an

environmental nature in progress, which included ditching

and seeding work on the borders of the new plant access

road, planting and seeding adjacent to the Educational

Center, watering-down of dusty roads and parking areas,

and removal of water from some low elevations by pumping.

Equipment was also observed being loaded onto trucks for

removal from the site.

The investigators determined that the total work force at

the site on July 21, 1978 had been reduced by 62 percent

as of August 2,1978. There were individuals assigned on

all shifts with the majority being on day shift. On

August 2, 1978, supervision and office workers accounted

i for 75 percent of the total work force.

l The investigators found that tower cranes did change in

orientation which was a normal condition since they are

free to turn in the wind when not in use. The other

reported complaints were correlated with activities on

site and none were found related to site activities which

were not permissible.

In addition to direct observation of the site, the in-

vestigators took ground and aerial photographs to provide

a method of comparing change.

(c) NRC Findings

The NRC investigation found that the Order of the Nuclear

Regulatory Comission which suspended the construction

permits was being complied with and that only those

actions permitted by the Order were being performed.

L _ _ _ _ _______ - - - - - - - - - - - _

_ - . _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

-

. .

10

l

E. Management Meetings

j

On July 26, 1978, the investigator discussed the reason for the

t investigation with Mr. J. H. Herrin, Site Manager.

On August 8, 1978, during a telephone discussion with Mr. Herrin,

the investigator discussed the investigation findings and informed

the licensee that no items of noncompliance had been identified.

.

t

/

s

l \

.

t

,

L.