{{#Wiki_filter:-          -                        .        -            --
l S/G Eddy Current                                                                      !
    . 12 Month Special Report                                                              ;
Page 1 of 20                                                                          ;
i i
ATTACMENT A                                  !
,                                              SPECIAL REPORT                                l SR-os-001-00                                  j STEAM GENERATOR EDDY CURRENT EXAMINATION
!                                            (6TH REFUELING)                                j INTRODUCTION 4
j      Inservice eddy current examination of Waterford 3 Steam Generator (S/G) tubing was    l l      completed by Conam Nuclear, Inc., a B&W Nuclear Service Company, on March 28, 1994. l 4
This report is submitted in accordance with Technical Specification 4.4.4.5, which    i requires the complete results of this inspection be submitted in a special report    !
pursuant to Technical Specification 6.9.2, within 12 months following the inspection. l The eddy current testing included 100% full length bobbin coil examinations of each  !
steam generator. Additionally, Waterford 3 performed Motorized Rotating Pancake Coil (MRPC) examinations on the hot legs of both steam generators. This examination was    ;
focused in the sludge pile region which is subject to OD initiated stress corrosion  !
cracking and intergranular attack. The number of tubes included in this augmented    !
scope totaled 6,102 tubes for S/G #1 and 6,110 tubes for S/G #2. The tubesheet MRPC  l examination scanned two inches above and below the tubesheet interface. As a result  :
of the top of the tubesheet MRPC examination Waterford 3 identified No Detectable Degradation.                                                                          !
;                                                                                            i In response to industry concerns for upper bundle hot leg sludge deposition and potential freespan axial indications, Waterford 3 performed MRPC on 303 tubes in S/G  i
        #1 and 305 tubes in S/G #2. The upper bundle MRPC examination criteria was the
;      longest freespan of tubing adjacent to the partial eggcrate scallop bars. ~ This
'l      included MRPC scans from the eighth, ninth and tenth partial eggerates through the anti-vibration bar (Batwing BW1) to the first vertical support intersection. The MRPC examination results identified No Detectable Degradation.
S/G tube examinations were conducted in accordance with USNRC Regulatory Guide 1.83 and ASME Section XI using Conam Nuclear, Inc. procedtre 42-EC-227, "Multifrequency Eddy Current Procedure Steam Generator Tubing MIZ-18/. or MIZ-30 Digital Eddy Current System Waterford 3." As a result of eddy current te!, ting, S/G #1 had two defective tubes which were plugged in accordance with B&W Nuclear Service Company's " Field Procedure for Rolled Plugging," Drawing, 1154835. The steam generator tube plugs were manufactured from thermally treated Inconel-690. Additionally, all tube plug locations were positively identified and video taped verifying correct tube locations.
9503230060 950321 PDR  ADOCK 050003B2 Q                  PDR
 
S/G Eddy Current
  . 12 Month Special Report Page 2 of 20
                                                                                          )
l As a result of verifying S/G #1 tube plug locations, it was noted that a Westinghouse Inconel-690 mechanical plug was leaking from the OD of the plug at hot leg location    !
Row 121 Line 45. The tube plug location Row 121 Line 45 was previously plugged with a  ,
Inconel-600 Westinghouse mechanical plug during RF #2 for a 41% through wall cold leg  l indication. Subsequently, Spring 1991 (Refuel 4) the Inconel-600 hot leg plugs were    j replaced with Inconel-690 (3 in each S/G) due to their susceptibility to Primary        i Water Stress Corrosion Cracking. Upon investigation as to the failure of the          ]
Westinghouse Inconel-690 mechanical plug, it was determined that the machining of the previous Inconel-600 mechanical plug resulted in the plug tops remaining in the l  tubesheet of S/G #1.
In order to install the Inconel-690 mechanical plug at location Row 121 Line 45,        l Westinghouse had to push the plug remnants up into the tubesheet. During this          j process of pushing the plug remnants, the tube ID was probably scored resulting in an  i inadequate seal between the tube ID and plug lands. The review of Westinghouse QC l  Process Data Sheets for the other S/G #1 hot leg tube plugs did not involve pushing l  the plug remnants prior to accepting the Inconel-690 plugs. As for S/G #2, the plug remnants were removed prior to the installation of the Inconel-690 mechanical plugs.
Another factor which may have led to the plug failure was that tube location Row 121 Line 45 is out on the peripheral of the bundle approximately thirteen inches from the  I curvature of the bowl. The confines of the tight curvature and the outer bundle tube location made it difficult to push the plug remnants into the tubesheet. Vaterford 3 contracted B&W Nuclear Technologies to machine S/G #1 hot leg tube plug location Row 121 Line 45 and install a tapered welded plug manufactured from Inconel-690. The above stated information was documented in Condition Report CR-94-308.
RESULTS OF EXAMINATION STEAM GENERATOR #1 The eddy current testing of 9,018 tubes in S/G #1 resulted in the following analysis of indications:
                        . 101 Tubes Less Than 20% Thru Wall
                        . 39 Tubes Greater Than or Equal to 20% But less Than 40% Thru Wall
* 2 Tubes Equal to 40% Thru Wall (Plugged)
* 1 Low Row Tube Obstructed Between 7H and 70 Row 2 Line 10 (Plugged)
 
S/G Eddy Current
  . 12 Month Special Report                                                              ;
Page 3 of 20                                                                        i The following tube listing identifies the indications as a result of examining 9,018 l  tubes (100%) in S/G #1:
l                                                                                        i RAM          LINE      %THRU WALL          LOCATION        COMMENTS                i I                                                                                        I l    41            5            <20%                  6H 67          11            27%                BW3          INDICATION @ -0.54" 55          13            <20%                  BW6                                f 74          14          <20%                  BW1
                              <20%                  BW4 61          15            24%                BW6          INDICATION @ -0.65"
                              <20%                  BW6 64          16          <20%                  BW5 62          18          <20%                  BW4 84          18          <20%                  BW3 42          20          <20%                  BW5 81          21          <20%                    8C 72          24          <20%                  BW5 28          26            20%                BW1          INDICATION @ 40.00" 67          27          <20%                  BW5 71          27          <20%                  BW4 77          27          <20%                  BW6 66          28          <20%                    3C 101          33            29%                  4H        INDICATION @ +28.49" 68          34            26%                  4C        INDICATION @ +0.18"
 
S/G Eddy Curr:nt
. 12 Month Special Report Page 4 of 20                                                    l 89H          LINE      %THRU WALL LOCATION COMMENTS 80          38          <20%      BW6 82          38          <20%      BW5 23%      BW6  INDICATION 9 -0.74" 113          39          <20%      BW7 42          40          <20%      BW5 50          40          <20%      BW5 54          40            28%        5H  INDICATION 9 +5.53" 39          41          <20%      BW5 45          41          <20%      BW5 87          41            23%      BW9  INDICATION 9 +2.52" 32          42          <20%        4C 30%        4C  INDICATION 0 +14.59" 59          45            24%        IC  INDICATION @ +9.97" 44          46          <20%      BW5
                            <20%      BW5 45          49          <20%      BW5 59          49          <20%      BW5 46          52          <20%      BW5 50          52          <20%        8H 43            53          <20%      BW5 49          53            38%      BW5  INDICATION @ +0.69" 33%      BW5  INDICATION @ +0.74"
 
S/G Eddy Current
. 12 Month Special Report Page 5 of 20 RQW          L1HE      %THRU WALL LOCATION COMMENTS 105          53          <20%      BW3 82          54          <20%      BW5
                              <20%      BW5 131'          55            26%        9H  INDICATION @ -0.29" 27%        9H  INDICATION 0-0.23" i
50          56          <20%      BW5
                              <20%      BWS 126          56          <20%      BW2 85          59          <20%      BW4 129          59          <20%      BW3 30          60          <20%      BW5 138          69          <20%        8H 49          61          <20%        8H 135          61            40%      BW5  PLUGGED WITH B&W I-690 HT #CE79-2      l 26          62          <20%      BW9 20%        7C  INDICATION 0 +12.65" 84          62          <20%      BW3 46          64          <20%      BW5 43          65          <20%      BW5 44          66          <20%      BW5 50          66          <20%      BW5 27          67            23%        3H  INDICATION @ +27.58"
 
S/G Eddy Current
  . 12 Month Special Report                                            :
Page 6 of 20                                                      l
?
RQM          LINE      %THRU WALL LOCATION COMENTS                :
l 51            67          <20%      BW4 135            67          <20%      BW3                          !
l l    79            69          26%      5H  INDICATION 9 +24.98" 145            73          25%      BW1  INDICATION 9 +0.75" l-  146            -76          32%      BW1  INDICATION 9 +1.60"    >
l                                29%      BW1  INDICATION 9 +1.62"    ,
51            77          <20%      BW4 e
113            77          <20%      BW1 l                                                                      !
133            77          <20%      BW3
                                <20%      BW4 68            78          22%      BW6  INDICATION 9 +0.78" 146            78          <20%      BW4 51            79          <20%      BW9
                                <20%      BW9                          ;
78            80          <20%      BW5 146            80          35%      BW1  INDICATION 9 -1.89" l                                33%      BW1  INDICATION 9 -1.68" 147            81          <20%      BW1 l                                40%      BW1  INDICATION 9 +1.83 PLUGGED WITH B&W I-690 HT# CE79-2
                                <20%      BW9                          .
l 82            82          <20%      BW5                          l l
141            85          <20%      BW3 i
1                                                                        :
 
i S/G Eddy Current                                                              .
  . 12 Month Special Report Page 7 of 20 l
RQM          LINE      %THRU' WALL  LOCATION COMMENTS 60          86            20%          BW9  INDICATION 0 +1.55" 62          86          <20%          BW9 i
80          86          <20%          BW9 64          88          <20%          BW9                                  -
146          88            24%          BW1  INDICATION 0 +1.67"
                                  <20%          BW9 147          89            20%          BW1  INDICATION @ -1.51" l      120          90          <20%          10H 146          90            38%          BW1  INDICATION 0 +1.76" 34%          BW1  INDICATION 0 +1.77" 147          91          <20%          BW9 54          92          <20%          8H 107          93          <20%          BW6 145          93          <20%          BW9 147          93            21%          BW8  INDICATION 0 -0.78"
                                  <20%          BW9 l
145          95            21%          BW9  INDICATION 0 -1.57" 82          96          <20%          BW5 83          97          <20%          BW5
                                  <20%          BW6 70          98          <20%          BW4 78          98          <20%          BW6
 
l S/G Eddy Current                                                        ,
12 Month Special Report                                                '
I Page 8 of 20 89)(        Lite      %THRU WALL LOCATION COMMENIS 49          99          <20%      BW1 145          99          <20%      BW9 78          100            22%      BW6  INDICATION 9t+0.69" 146          100          <20%      BW1 145          101          <20%      BW1
                            <20%      BW9                                l 48          102            25%      BW5  INDICATION @ -0.75"        j 66          102          <20%      BW4                                l 72          102          <20%      BW4 74          102          <20%      BW4 144          102          <20%      BW9                              ,
55          103            23%      BW1  INDICATION @ +1.03"        ,
                            <20%      BW5 123          103          <20%      BW2                                ;
145          103            20%      BW1  INDICATION @ +1.61"        >
                            <20%      BW2                                i l
                            <20%      BW7 22%      BW8  INDICATION 0 +0.74"
                            <20%      BW9 24%      BW9  INDICATION @ +1.55" 82          104            22%        8C  INDICATION @ +27.69" 8B          106          <20%      BW3 144          106          <20%      BW1 1
143          107          <20%      BW1 4
 
S/G Eddy Current                                                    -
'. 12 Month Special Report                                              ,
Page 9 of 20                                                          l l
l                                                                      .
LIE BE                      %THRU WALL LOCATION  COMENTS                :
I 24          108          <20%      BW5                            !
42          108            25%      BW5    I'91 d CATION 9 -0.70"-
I 22          112          <20%      BW5 l  29          113          <20%      BW5 l
141          113            20%      BW9    INDICATION 9 -1.33" 19          115            25%        IH    INDICATION @ +5.71" l
l  49          115          <20%      BW5 1
48          118          <20%      TSH                            )
135          119            26%      BW2    INDICATION 0 -0.57"
                              <20%      BW2 20%      BW3    INDICATION @ +0.71" 27%      BW4    INDICATION @ -0.79" 23%      BW4    INDICATION 9 +0.88" 72          120          <20%      BW4 45          121          <20%      TSH 133          121          <20%      BW2 22%      BW2    INDICATION 0 +0.78"
                              <20%      BW3 74          124          <20%      BW5 72          126          <20%      BW4 64          128          <20%      BW4 i
                                                                        }
 
S/G Eddy Current
. 12 Month Special Report Page 10 of 20 RQM        LINE        %THRU WALL LOCATION COMMENTS 76        128            <20%      BW4
                              <20%      BW5
                              <20%      BW5
                              <20%      BW6
                              <20%      BW6 105        131            <20%      BW3 103        133            <20%      BW3 114        136            <20%        IC 63        137            <20%      BW5 70        138            <20%      BW4
                              <20%      BW4 25%-      BW5  INDICATION @ -0.77" 21%      BW6  INDICATION @ -0.80" 23%      BW6  INDICATION @ +0.71" 82        138              22%      BW6  INDICATION @ +0.93"  .
18        140              35%        6H  INDICATION @ +27.23" 76        140            <20%      BW6 82        140            <20%      BW4
                              <20%      BW6 85        141            <20%      BW3 78        142            <20%      BW5
                              <20%      BW6 44        144            <20%      BW5 48        .44            <20%      BW5 74        144            <20%      BW5
                              <20%      BW6
 
i 4
S/G Eddy Current 1.2 Month Special Report Page 11 of 20 l
BQM        UE          %THRU WALL        LOCATION          COMMENTS 78        144            <20%              BW4
                              <20%              BW4
                              <20%              BW5
                              <20%              BW6                                    ;
84        144            <20%                9H 81        147            <20%              BW6                                    l l
83          149            <20%              BW7                                    i l
28        150            <20%                3C 58        152              21%              BW5            INDICATION 9 -0.46"
                              <20%              BW5                                    ,
86        152            <20%              JW3 44          156            <20%              BW5 i
STEAM GENERATOR #2                                                                    ,
The eddy current testing of 9,005 tubes in S/G #2 resulter' in the following analysis I of indications:
e 84 Tubes Less ihan 20% Thru Wall e 59 Tubes Greater Than or Equal to 20% But less Than 40% Thru Wall e No Tubes Equal to or Greater Than 40% Thru Wall e  2 Tubes Stabilized and Plugged Due to Possible Loose Part on Hot leg Secondary Side Row 138 Line 114 & Row 137 Line 115 The following tube listing identifies the indications as a result of examining 9,005 tubes (100%) in S/G #2:
I
 
1 l
1 S/G Eddy Curr:nt
. 1.2 Month Special Report                                          j Page 12 of 20 BQW        LIE          %THRU WALL LOCATION COMMENTS 19            3            <20%      BW5 41          15            28%      TSC  INDICATION 0 +9.09" 44          -16            29%      BW5  INDICATION 0 -0.46"
                              <20%      BW5 48          18            25%      BW5  INDICATION 9 -0.79" 48          20            33%      BW5  INDICATION 9 +0.73"  j 36%      BW5  INDICATION 0 +0.73"  l 90          20            <20%        9H l
5          21            <20%      TSC 76          24            <20%      BW4
                              <20%      BW5 91          25            32%        6C  INDICATION @ +19.43" 30          26            <20%      BW1                        I l
80          28            <20%      BW6                        i I
103          29            <20%        7C 94          30            23%        9C  INDICATION @ -0.06" 46          32            <20%      BW5 i
81          33            <20%      BW9 36          34            31%        3H  INDICATION @ +9.04" 83          35            <20%      BW5                        .
                              <20%      BW7 1
43          37            <20%      BW5
                              <20%      BW5
 
i' l  S/G Eddy Current l  12 Month Special Report                                          l Page 13 of 20 l
l ROM        LIE        %THRU WALL LOCATION COMMENTS 77          37          <20%      BW4
                              <20%      BW5                        1 20%      BW5  INDICATION @ +0.64" l  44          40          <20%      BW5 l
94          40          <20%      BW6                        :
i 80          44            26%      BW4  INDICATION @ -0.85" l
l  39          45            24%        IC  INDICATION @ +24.31" !
!  44          48          <20%      BW5                        j l
l  74          48            24%      BW4  INDICATION @ +0.88"  l 23%      BW5  INDICATION @ +0.88"  l l
80          48          <20%      BW5 l  77          49          <20%      BN5 81          49            22%      BW5  INDICATION @ +0.86"  ;
                              <20%      BW6                        1 66          50            26%      BW9  INDICATION @ +1.54" 49          51            33%      BW5  INDICATION @ +0.57" 37%      BW5  INDICATION @ +0.79" 134          52          <20%      BW1 107          55            24%      BW5  INDICATION @ +0.00"
                              <20%      BW5
                              <20%      BW6 82          56            29%      BW5  INDICATION @ -0.73" 94          56          <20%      BW4                        l l
49          57          <20%        6H l
l
 
l l
t S/G Eddy Current 12 Month Special Report Page 14 of 20                                                    )
j i                                                                    1 l  89M _      LIE        %THRU WALL LOCATION COMMENTS              l l                                                                    l 73          57            22%      BW6  INDICATION @ +0.85"  )
77          57          <20%      BW5 81          57          <20%      BW4 48          58            21%      BW5  INDICATION 9 -0.78" 45          59            20%        3C  INDICATION 0 -0.55" 70          60          <20%      BW9 L
98          60          <20%      BW6                        i 77          61          <20%      BW4
                              <20%      BW4 1
133          61          <20%      BW3 21%      BW5  INDICATION 9 +0.68" l
137          61          <20%        9C                        l 46          64            27%      BW5  INDICATION 0 +0.78"
                              <20%      BW9 89          65            32%      BW5  INDICATION 9 -0.88"  l 32%      BW5  INDICATION 0 -0.73"  l 120          66          <20%      10H                        ]
46          68            <20%      BW5
                              <20%      BW5                        i 1
43          69            <20%      BW5 28%      BW5  INDICATION 0 +0.75" 77          71            <20%      BW4
                              <20%      BW5
                              <20%      BW5 l
l
 
4 S/G Eddy Current
, 12 Month Special Report Page 15 of 20 R9)(        LIE        %THRU WALL LOCATION COMMENTS 92          72          <20%      BW5                      l 120          72          <20%      10H 50          74          <20%        8H 141          75          <20%      BW1 121          77          <20%      BW5                      ;
1 145          77          <20%      BW8                      )
l 102          78          <20%      BW3 i
146          78          <20%      BW9                      i 146          80          <20%      BW9                      i 146          82            31%      BW1  INDICATION @ +1.25" 30%      BW1  INDICATION @ +1.95" i l
145          83            24%      BW1  INDICATION @ +1.64" 54          84            29%      BW1  INDICATION @ -1.66" i 146          84            20%      BW9  INDICATION @ -1.68" 97          85          <20%      BW4 145          85          <20%      BW8
                              <20%      BW8                      i 33%      BW9  INDICATION @ -1.75" 36%      BW9  INDICATION @ +1.78" 147          85          <20%      BW6
                              <20%      BW7                      l 56          86          <20%      BW9                      i 144          86            27%      BW1  INDICATION @ +1.47" i
 
;                                                                      4 J
S/G Eddy Current-12 Month Special Report Page 16 of 20 i    R0W        LJE        %THAU WALL LOCATION COMMENTS 81          87          <20%      BW6                        ,
145          87          <20%      BW9-                      I I
147          87            27%      BW2  INDICATION @ -0.68"  j
                                <20%      BW7
                                                                      )'
                                <20%      BW7
                                <20%      BW8 26%      BW8  INDICATION 9 +0.03" 136          88            25%        SH  INDICATIC's @ +0.66" I
146          88          <20%      BW1                        ;
32%      BW1  INDICATION 9 +1.79"
                                <20%      BW9 l
145          89          <20%      BW8                        I
                                <20%      BW8 144          90          <20%      BW9 146          90          <20%      BW9 147          91            23%      BW8  INDICATION @ -0.75" 29%      BW8  INDICATION 0 -0.06"  i
                                <20%      BW8 l
145          93            23%      BW9  INDICATION 0 +1.56" l
145          95            23%      BW8  INDICATION @ -0.70"  l
                                <20%      BW9 66          96          <20%      BW1 106          96            37%        7C  INDICATION 0 +28.52" i
30%        7C  INDICATION 0 +28.40" 146          96          <20%      BW9 i
l l                                                                      l l
l
 
l l -
S/G Eddy Current
  . 12 Month Special. Report Page 17 of 20 BDW        LLE          %THRU WALL LOCATION COMMENTS            :
                                                                      )
l    81          97            25%-      BW5  INDICATION 0 +0.76"
                                <20%      BW6 103          97            <20%      BW4
                                <20%      BW7 1
50        100            <20%        8H l
144        100            <20%      BW9 49        101            <20%        8H 145        101            <20%      BW3 69        103              35%      BW4  INDICATION 0 -0.77" 33%      BW4  INDICATION 0 -0.71" 26%      BW6  INDICATION 0 -0.53" l
l l    143        103            <20%      BW9                        :
l 145        103            <20%      BW9                        i l    112        104            <20%      BW9 114        106            <20%      BW4 144        106              24%      BW1  INDICATION 0 +1.50" 113        109            <20%      BW3 137        111            <20%      BW8 56        112              20%        4H  INDICATION 0 +1.64" 31%        4H  INDICATION 0 +1.73" 135        113            <20%      BW8                        '
30        114              22%        3C  INDICATION 0 +25.99" 138        114            <20%      TSH l
 
S/G Eddy Current                                                  l
: l. 12 Month Special Report Page 18 of 20                                                    -
t RQM        L1HE        '4THRU WALL LOCATION COMMENTS 77        117            <20%      BW6 85        117              26%        1H  INDICATION 9 +28.37" 133        117            <20%      BW3
                              <20%      BW3 74        118              21%      BW4  INDICATION 9 -1.18" l
                              <20%      BW5
!  84        120            <20%      TSC 83        121            <20%      BW4                        r
,                              33%      BW5  INDICATION 9 -0.29" 39%      BW5  INDICATION 0 -0.23" 23%      BW6  INDICATION @ -1.10" 30        122            <20%      TSH                        )
I 50        122              20%        8H  INDICATION @ -1.22" 41        127            <20%      BW5 131        127            <20%      BW1 82        128              22%      BW5  INDICATION 9 +0.89"
                              <20%      BW6 49        131              28%      BW5  INDICATION 0 -0.80" 28%      BW5  INDICATION @ -0.07" 125        133            <20%      BW4 100        134            <20%      BW1 124        134            <20%        7C 21%        6C  INDICATION 0 -0.09" 41        139            <20%      BW5 l
 
S/G Eddy Current
  ,  12 Month Special Report Page 19 of 20 l
RRM        L1HE        %THRU WALL LOCATION f0MMENTS              I 16    140            <20%      BW1 37      141            <20%      BW5 l                                                                      '
l 109        141              20%      BW5    INDICATION 0 +0.75" 45      143              36%      BW5    INDICATION 9 +0.61" 38%      BW5    INDICATION 9 +0.69" 105        143              23%      BW3  INDICATION 0 +0.63" 45    145              29%      BW5    INDICATION 9 -0.66" 52    146            <20%        4C i
47      147            <20%      BW5 21%      BW5  INDICATION 0 +0.75" l
91    147              22%        9C  INDICATION @ -0.94" 41      149              23%      BW5  INDICATION 0 +0.98" 43      149            <20%      BW5 49      149              24%      BW5  INDICATION 0 +0.82" 101        149            <20%      BW3
                                <20%        9C                          4 l                                <20%        9C l
i 57      151            <20%        7C l                                                                        \
37      155              22%      BW5    INDICATION @ -0.92" 49      155              37%      BW5    INDICATION @ +0.68" 34%      BW5    INDICATION @ +0.76" 37      157            <20%      BW5 8  158            <20%        IC
 
S/G Eddy Current
.        12 Month Special Report Page 20 of 20 R91          LIE        %THRU WALL          LOCATION        COMMENTS i
38          158          <20%                BW5 70          160          <20%                  8C 55          163          <20%                TSH 41          167          <20%-                BW5 45          167          <20%                BW5 26          170          <20%                BW1 1        175'          21%                  1H          INDICATION 0 +0.03" 11          175          <20%                BW1 PLANT CONTACT J.E. Howard Manager Procurement / Programs (504) 739-6327 l}}

Latest revision as of 06:11, 14 May 2020

Steam Generator Eddy Current Exam (6th Refueling), 12 Month Special Rept
ML20081G233
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/21/1995
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20081G227 List:
References
SR-95-001-00, SR-95-1, NUDOCS 9503230060
Download: ML20081G233 (20)


Text

- - . - --

l S/G Eddy Current  !

. 12 Month Special Report  ;

Page 1 of 20  ;

i i

ATTACMENT A  !

, SPECIAL REPORT l SR-os-001-00 j STEAM GENERATOR EDDY CURRENT EXAMINATION

! (6TH REFUELING) j INTRODUCTION 4

j Inservice eddy current examination of Waterford 3 Steam Generator (S/G) tubing was l l completed by Conam Nuclear, Inc., a B&W Nuclear Service Company, on March 28, 1994. l 4

This report is submitted in accordance with Technical Specification 4.4.4.5, which i requires the complete results of this inspection be submitted in a special report  !

pursuant to Technical Specification 6.9.2, within 12 months following the inspection. l The eddy current testing included 100% full length bobbin coil examinations of each  !

steam generator. Additionally, Waterford 3 performed Motorized Rotating Pancake Coil (MRPC) examinations on the hot legs of both steam generators. This examination was  ;

focused in the sludge pile region which is subject to OD initiated stress corrosion  !

cracking and intergranular attack. The number of tubes included in this augmented  !

scope totaled 6,102 tubes for S/G #1 and 6,110 tubes for S/G #2. The tubesheet MRPC l examination scanned two inches above and below the tubesheet interface. As a result  :

of the top of the tubesheet MRPC examination Waterford 3 identified No Detectable Degradation.  !

i In response to industry concerns for upper bundle hot leg sludge deposition and potential freespan axial indications, Waterford 3 performed MRPC on 303 tubes in S/G i
  1. 1 and 305 tubes in S/G #2. The upper bundle MRPC examination criteria was the
longest freespan of tubing adjacent to the partial eggcrate scallop bars. ~ This

'l included MRPC scans from the eighth, ninth and tenth partial eggerates through the anti-vibration bar (Batwing BW1) to the first vertical support intersection. The MRPC examination results identified No Detectable Degradation.

S/G tube examinations were conducted in accordance with USNRC Regulatory Guide 1.83 and ASME Section XI using Conam Nuclear, Inc. procedtre 42-EC-227, "Multifrequency Eddy Current Procedure Steam Generator Tubing MIZ-18/. or MIZ-30 Digital Eddy Current System Waterford 3." As a result of eddy current te!, ting, S/G #1 had two defective tubes which were plugged in accordance with B&W Nuclear Service Company's " Field Procedure for Rolled Plugging," Drawing, 1154835. The steam generator tube plugs were manufactured from thermally treated Inconel-690. Additionally, all tube plug locations were positively identified and video taped verifying correct tube locations.

9503230060 950321 PDR ADOCK 050003B2 Q PDR

S/G Eddy Current

. 12 Month Special Report Page 2 of 20

)

l As a result of verifying S/G #1 tube plug locations, it was noted that a Westinghouse Inconel-690 mechanical plug was leaking from the OD of the plug at hot leg location  !

Row 121 Line 45. The tube plug location Row 121 Line 45 was previously plugged with a ,

Inconel-600 Westinghouse mechanical plug during RF #2 for a 41% through wall cold leg l indication. Subsequently, Spring 1991 (Refuel 4) the Inconel-600 hot leg plugs were j replaced with Inconel-690 (3 in each S/G) due to their susceptibility to Primary i Water Stress Corrosion Cracking. Upon investigation as to the failure of the ]

Westinghouse Inconel-690 mechanical plug, it was determined that the machining of the previous Inconel-600 mechanical plug resulted in the plug tops remaining in the l tubesheet of S/G #1.

In order to install the Inconel-690 mechanical plug at location Row 121 Line 45, l Westinghouse had to push the plug remnants up into the tubesheet. During this j process of pushing the plug remnants, the tube ID was probably scored resulting in an i inadequate seal between the tube ID and plug lands. The review of Westinghouse QC l Process Data Sheets for the other S/G #1 hot leg tube plugs did not involve pushing l the plug remnants prior to accepting the Inconel-690 plugs. As for S/G #2, the plug remnants were removed prior to the installation of the Inconel-690 mechanical plugs.

Another factor which may have led to the plug failure was that tube location Row 121 Line 45 is out on the peripheral of the bundle approximately thirteen inches from the I curvature of the bowl. The confines of the tight curvature and the outer bundle tube location made it difficult to push the plug remnants into the tubesheet. Vaterford 3 contracted B&W Nuclear Technologies to machine S/G #1 hot leg tube plug location Row 121 Line 45 and install a tapered welded plug manufactured from Inconel-690. The above stated information was documented in Condition Report CR-94-308.

RESULTS OF EXAMINATION STEAM GENERATOR #1 The eddy current testing of 9,018 tubes in S/G #1 resulted in the following analysis of indications:

. 101 Tubes Less Than 20% Thru Wall

. 39 Tubes Greater Than or Equal to 20% But less Than 40% Thru Wall

  • 2 Tubes Equal to 40% Thru Wall (Plugged)
  • 1 Low Row Tube Obstructed Between 7H and 70 Row 2 Line 10 (Plugged)

S/G Eddy Current

. 12 Month Special Report  ;

Page 3 of 20 i The following tube listing identifies the indications as a result of examining 9,018 l tubes (100%) in S/G #1:

l i RAM LINE %THRU WALL LOCATION COMMENTS i I I l 41 5 <20% 6H 67 11 27% BW3 INDICATION @ -0.54" 55 13 <20% BW6 f 74 14 <20% BW1

<20% BW4 61 15 24% BW6 INDICATION @ -0.65"

<20% BW6 64 16 <20% BW5 62 18 <20% BW4 84 18 <20% BW3 42 20 <20% BW5 81 21 <20% 8C 72 24 <20% BW5 28 26 20% BW1 INDICATION @ 40.00" 67 27 <20% BW5 71 27 <20% BW4 77 27 <20% BW6 66 28 <20% 3C 101 33 29% 4H INDICATION @ +28.49" 68 34 26% 4C INDICATION @ +0.18"

S/G Eddy Curr:nt

. 12 Month Special Report Page 4 of 20 l 89H LINE %THRU WALL LOCATION COMMENTS 80 38 <20% BW6 82 38 <20% BW5 23% BW6 INDICATION 9 -0.74" 113 39 <20% BW7 42 40 <20% BW5 50 40 <20% BW5 54 40 28% 5H INDICATION 9 +5.53" 39 41 <20% BW5 45 41 <20% BW5 87 41 23% BW9 INDICATION 9 +2.52" 32 42 <20% 4C 30% 4C INDICATION 0 +14.59" 59 45 24% IC INDICATION @ +9.97" 44 46 <20% BW5

<20% BW5 45 49 <20% BW5 59 49 <20% BW5 46 52 <20% BW5 50 52 <20% 8H 43 53 <20% BW5 49 53 38% BW5 INDICATION @ +0.69" 33% BW5 INDICATION @ +0.74"

S/G Eddy Current

. 12 Month Special Report Page 5 of 20 RQW L1HE %THRU WALL LOCATION COMMENTS 105 53 <20% BW3 82 54 <20% BW5

<20% BW5 131' 55 26% 9H INDICATION @ -0.29" 27% 9H INDICATION 0-0.23" i

50 56 <20% BW5

<20% BWS 126 56 <20% BW2 85 59 <20% BW4 129 59 <20% BW3 30 60 <20% BW5 138 69 <20% 8H 49 61 <20% 8H 135 61 40% BW5 PLUGGED WITH B&W I-690 HT #CE79-2 l 26 62 <20% BW9 20% 7C INDICATION 0 +12.65" 84 62 <20% BW3 46 64 <20% BW5 43 65 <20% BW5 44 66 <20% BW5 50 66 <20% BW5 27 67 23% 3H INDICATION @ +27.58"

S/G Eddy Current

. 12 Month Special Report  :

Page 6 of 20 l

?

RQM LINE %THRU WALL LOCATION COMENTS  :

l 51 67 <20% BW4 135 67 <20% BW3  !

l l 79 69 26% 5H INDICATION 9 +24.98" 145 73 25% BW1 INDICATION 9 +0.75" l- 146 -76 32% BW1 INDICATION 9 +1.60" >

l 29% BW1 INDICATION 9 +1.62" ,

51 77 <20% BW4 e

113 77 <20% BW1 l  !

133 77 <20% BW3

<20% BW4 68 78 22% BW6 INDICATION 9 +0.78" 146 78 <20% BW4 51 79 <20% BW9

<20% BW9  ;

78 80 <20% BW5 146 80 35% BW1 INDICATION 9 -1.89" l 33% BW1 INDICATION 9 -1.68" 147 81 <20% BW1 l 40% BW1 INDICATION 9 +1.83 PLUGGED WITH B&W I-690 HT# CE79-2

<20% BW9 .

l 82 82 <20% BW5 l l

141 85 <20% BW3 i

1  :

i S/G Eddy Current .

. 12 Month Special Report Page 7 of 20 l

RQM LINE %THRU' WALL LOCATION COMMENTS 60 86 20% BW9 INDICATION 0 +1.55" 62 86 <20% BW9 i

80 86 <20% BW9 64 88 <20% BW9 -

146 88 24% BW1 INDICATION 0 +1.67"

<20% BW9 147 89 20% BW1 INDICATION @ -1.51" l 120 90 <20% 10H 146 90 38% BW1 INDICATION 0 +1.76" 34% BW1 INDICATION 0 +1.77" 147 91 <20% BW9 54 92 <20% 8H 107 93 <20% BW6 145 93 <20% BW9 147 93 21% BW8 INDICATION 0 -0.78"

<20% BW9 l

145 95 21% BW9 INDICATION 0 -1.57" 82 96 <20% BW5 83 97 <20% BW5

<20% BW6 70 98 <20% BW4 78 98 <20% BW6

l S/G Eddy Current ,

12 Month Special Report '

I Page 8 of 20 89)( Lite %THRU WALL LOCATION COMMENIS 49 99 <20% BW1 145 99 <20% BW9 78 100 22% BW6 INDICATION 9t+0.69" 146 100 <20% BW1 145 101 <20% BW1

<20% BW9 l 48 102 25% BW5 INDICATION @ -0.75" j 66 102 <20% BW4 l 72 102 <20% BW4 74 102 <20% BW4 144 102 <20% BW9 ,

55 103 23% BW1 INDICATION @ +1.03" ,

<20% BW5 123 103 <20% BW2  ;

145 103 20% BW1 INDICATION @ +1.61" >

<20% BW2 i l

<20% BW7 22% BW8 INDICATION 0 +0.74"

<20% BW9 24% BW9 INDICATION @ +1.55" 82 104 22% 8C INDICATION @ +27.69" 8B 106 <20% BW3 144 106 <20% BW1 1

143 107 <20% BW1 4

S/G Eddy Current -

'. 12 Month Special Report ,

Page 9 of 20 l l

l .

LIE BE %THRU WALL LOCATION COMENTS  :

I 24 108 <20% BW5  !

42 108 25% BW5 I'91 d CATION 9 -0.70"-

I 22 112 <20% BW5 l 29 113 <20% BW5 l

141 113 20% BW9 INDICATION 9 -1.33" 19 115 25% IH INDICATION @ +5.71" l

l 49 115 <20% BW5 1

48 118 <20% TSH )

135 119 26% BW2 INDICATION 0 -0.57"

<20% BW2 20% BW3 INDICATION @ +0.71" 27% BW4 INDICATION @ -0.79" 23% BW4 INDICATION 9 +0.88" 72 120 <20% BW4 45 121 <20% TSH 133 121 <20% BW2 22% BW2 INDICATION 0 +0.78"

<20% BW3 74 124 <20% BW5 72 126 <20% BW4 64 128 <20% BW4 i

}

S/G Eddy Current

. 12 Month Special Report Page 10 of 20 RQM LINE %THRU WALL LOCATION COMMENTS 76 128 <20% BW4

<20% BW5

<20% BW5

<20% BW6

<20% BW6 105 131 <20% BW3 103 133 <20% BW3 114 136 <20% IC 63 137 <20% BW5 70 138 <20% BW4

<20% BW4 25%- BW5 INDICATION @ -0.77" 21% BW6 INDICATION @ -0.80" 23% BW6 INDICATION @ +0.71" 82 138 22% BW6 INDICATION @ +0.93" .

18 140 35% 6H INDICATION @ +27.23" 76 140 <20% BW6 82 140 <20% BW4

<20% BW6 85 141 <20% BW3 78 142 <20% BW5

<20% BW6 44 144 <20% BW5 48 .44 <20% BW5 74 144 <20% BW5

<20% BW6

i 4

S/G Eddy Current 1.2 Month Special Report Page 11 of 20 l

BQM UE %THRU WALL LOCATION COMMENTS 78 144 <20% BW4

<20% BW4

<20% BW5

<20% BW6  ;

84 144 <20% 9H 81 147 <20% BW6 l l

83 149 <20% BW7 i l

28 150 <20% 3C 58 152 21% BW5 INDICATION 9 -0.46"

<20% BW5 ,

86 152 <20% JW3 44 156 <20% BW5 i

STEAM GENERATOR #2 ,

The eddy current testing of 9,005 tubes in S/G #2 resulter' in the following analysis I of indications:

e 84 Tubes Less ihan 20% Thru Wall e 59 Tubes Greater Than or Equal to 20% But less Than 40% Thru Wall e No Tubes Equal to or Greater Than 40% Thru Wall e 2 Tubes Stabilized and Plugged Due to Possible Loose Part on Hot leg Secondary Side Row 138 Line 114 & Row 137 Line 115 The following tube listing identifies the indications as a result of examining 9,005 tubes (100%) in S/G #2:

I

1 l

1 S/G Eddy Curr:nt

. 1.2 Month Special Report j Page 12 of 20 BQW LIE %THRU WALL LOCATION COMMENTS 19 3 <20% BW5 41 15 28% TSC INDICATION 0 +9.09" 44 -16 29% BW5 INDICATION 0 -0.46"

<20% BW5 48 18 25% BW5 INDICATION 9 -0.79" 48 20 33% BW5 INDICATION 9 +0.73" j 36% BW5 INDICATION 0 +0.73" l 90 20 <20% 9H l

5 21 <20% TSC 76 24 <20% BW4

<20% BW5 91 25 32% 6C INDICATION @ +19.43" 30 26 <20% BW1 I l

80 28 <20% BW6 i I

103 29 <20% 7C 94 30 23% 9C INDICATION @ -0.06" 46 32 <20% BW5 i

81 33 <20% BW9 36 34 31% 3H INDICATION @ +9.04" 83 35 <20% BW5 .

<20% BW7 1

43 37 <20% BW5

<20% BW5

i' l S/G Eddy Current l 12 Month Special Report l Page 13 of 20 l

l ROM LIE %THRU WALL LOCATION COMMENTS 77 37 <20% BW4

<20% BW5 1 20% BW5 INDICATION @ +0.64" l 44 40 <20% BW5 l

94 40 <20% BW6  :

i 80 44 26% BW4 INDICATION @ -0.85" l

l 39 45 24% IC INDICATION @ +24.31" !

! 44 48 <20% BW5 j l

l 74 48 24% BW4 INDICATION @ +0.88" l 23% BW5 INDICATION @ +0.88" l l

80 48 <20% BW5 l 77 49 <20% BN5 81 49 22% BW5 INDICATION @ +0.86"  ;

<20% BW6 1 66 50 26% BW9 INDICATION @ +1.54" 49 51 33% BW5 INDICATION @ +0.57" 37% BW5 INDICATION @ +0.79" 134 52 <20% BW1 107 55 24% BW5 INDICATION @ +0.00"

<20% BW5

<20% BW6 82 56 29% BW5 INDICATION @ -0.73" 94 56 <20% BW4 l l

49 57 <20% 6H l

l

l l

t S/G Eddy Current 12 Month Special Report Page 14 of 20 )

j i 1 l 89M _ LIE %THRU WALL LOCATION COMMENTS l l l 73 57 22% BW6 INDICATION @ +0.85" )

77 57 <20% BW5 81 57 <20% BW4 48 58 21% BW5 INDICATION 9 -0.78" 45 59 20% 3C INDICATION 0 -0.55" 70 60 <20% BW9 L

98 60 <20% BW6 i 77 61 <20% BW4

<20% BW4 1

133 61 <20% BW3 21% BW5 INDICATION 9 +0.68" l

137 61 <20% 9C l 46 64 27% BW5 INDICATION 0 +0.78"

<20% BW9 89 65 32% BW5 INDICATION 9 -0.88" l 32% BW5 INDICATION 0 -0.73" l 120 66 <20% 10H ]

46 68 <20% BW5

<20% BW5 i 1

43 69 <20% BW5 28% BW5 INDICATION 0 +0.75" 77 71 <20% BW4

<20% BW5

<20% BW5 l

l

4 S/G Eddy Current

, 12 Month Special Report Page 15 of 20 R9)( LIE %THRU WALL LOCATION COMMENTS 92 72 <20% BW5 l 120 72 <20% 10H 50 74 <20% 8H 141 75 <20% BW1 121 77 <20% BW5  ;

1 145 77 <20% BW8 )

l 102 78 <20% BW3 i

146 78 <20% BW9 i 146 80 <20% BW9 i 146 82 31% BW1 INDICATION @ +1.25" 30% BW1 INDICATION @ +1.95" i l

145 83 24% BW1 INDICATION @ +1.64" 54 84 29% BW1 INDICATION @ -1.66" i 146 84 20% BW9 INDICATION @ -1.68" 97 85 <20% BW4 145 85 <20% BW8

<20% BW8 i 33% BW9 INDICATION @ -1.75" 36% BW9 INDICATION @ +1.78" 147 85 <20% BW6

<20% BW7 l 56 86 <20% BW9 i 144 86 27% BW1 INDICATION @ +1.47" i

4 J

S/G Eddy Current-12 Month Special Report Page 16 of 20 i R0W LJE %THAU WALL LOCATION COMMENTS 81 87 <20% BW6 ,

145 87 <20% BW9- I I

147 87 27% BW2 INDICATION @ -0.68" j

<20% BW7

)'

<20% BW7

<20% BW8 26% BW8 INDICATION 9 +0.03" 136 88 25% SH INDICATIC's @ +0.66" I

146 88 <20% BW1  ;

32% BW1 INDICATION 9 +1.79"

<20% BW9 l

145 89 <20% BW8 I

<20% BW8 144 90 <20% BW9 146 90 <20% BW9 147 91 23% BW8 INDICATION @ -0.75" 29% BW8 INDICATION 0 -0.06" i

<20% BW8 l

145 93 23% BW9 INDICATION 0 +1.56" l

145 95 23% BW8 INDICATION @ -0.70" l

<20% BW9 66 96 <20% BW1 106 96 37% 7C INDICATION 0 +28.52" i

30% 7C INDICATION 0 +28.40" 146 96 <20% BW9 i

l l l l

l

l l -

S/G Eddy Current

. 12 Month Special. Report Page 17 of 20 BDW LLE %THRU WALL LOCATION COMMENTS  :

)

l 81 97 25%- BW5 INDICATION 0 +0.76"

<20% BW6 103 97 <20% BW4

<20% BW7 1

50 100 <20% 8H l

144 100 <20% BW9 49 101 <20% 8H 145 101 <20% BW3 69 103 35% BW4 INDICATION 0 -0.77" 33% BW4 INDICATION 0 -0.71" 26% BW6 INDICATION 0 -0.53" l

l l 143 103 <20% BW9  :

l 145 103 <20% BW9 i l 112 104 <20% BW9 114 106 <20% BW4 144 106 24% BW1 INDICATION 0 +1.50" 113 109 <20% BW3 137 111 <20% BW8 56 112 20% 4H INDICATION 0 +1.64" 31% 4H INDICATION 0 +1.73" 135 113 <20% BW8 '

30 114 22% 3C INDICATION 0 +25.99" 138 114 <20% TSH l

S/G Eddy Current l

l. 12 Month Special Report Page 18 of 20 -

t RQM L1HE '4THRU WALL LOCATION COMMENTS 77 117 <20% BW6 85 117 26% 1H INDICATION 9 +28.37" 133 117 <20% BW3

<20% BW3 74 118 21% BW4 INDICATION 9 -1.18" l

<20% BW5

! 84 120 <20% TSC 83 121 <20% BW4 r

, 33% BW5 INDICATION 9 -0.29" 39% BW5 INDICATION 0 -0.23" 23% BW6 INDICATION @ -1.10" 30 122 <20% TSH )

I 50 122 20% 8H INDICATION @ -1.22" 41 127 <20% BW5 131 127 <20% BW1 82 128 22% BW5 INDICATION 9 +0.89"

<20% BW6 49 131 28% BW5 INDICATION 0 -0.80" 28% BW5 INDICATION @ -0.07" 125 133 <20% BW4 100 134 <20% BW1 124 134 <20% 7C 21% 6C INDICATION 0 -0.09" 41 139 <20% BW5 l

S/G Eddy Current

, 12 Month Special Report Page 19 of 20 l

RRM L1HE %THRU WALL LOCATION f0MMENTS I 16 140 <20% BW1 37 141 <20% BW5 l '

l 109 141 20% BW5 INDICATION 0 +0.75" 45 143 36% BW5 INDICATION 9 +0.61" 38% BW5 INDICATION 9 +0.69" 105 143 23% BW3 INDICATION 0 +0.63" 45 145 29% BW5 INDICATION 9 -0.66" 52 146 <20% 4C i

47 147 <20% BW5 21% BW5 INDICATION 0 +0.75" l

91 147 22% 9C INDICATION @ -0.94" 41 149 23% BW5 INDICATION 0 +0.98" 43 149 <20% BW5 49 149 24% BW5 INDICATION 0 +0.82" 101 149 <20% BW3

<20% 9C 4 l <20% 9C l

i 57 151 <20% 7C l \

37 155 22% BW5 INDICATION @ -0.92" 49 155 37% BW5 INDICATION @ +0.68" 34% BW5 INDICATION @ +0.76" 37 157 <20% BW5 8 158 <20% IC

S/G Eddy Current

. 12 Month Special Report Page 20 of 20 R91 LIE %THRU WALL LOCATION COMMENTS i

38 158 <20% BW5 70 160 <20% 8C 55 163 <20% TSH 41 167 <20%- BW5 45 167 <20% BW5 26 170 <20% BW1 1 175' 21% 1H INDICATION 0 +0.03" 11 175 <20% BW1 PLANT CONTACT J.E. Howard Manager Procurement / Programs (504) 739-6327 l