| b The Waterbox was taken out of service and leak checked using the llandl-Wrap | | b The Waterbox was taken out of service and leak checked using the llandl-Wrap |
| ) | | ) |
| ;
| | method. No leaks were found using this method due probably to their small size. The Waterbox was returned to full service and arrangements were made for a contractor to come in and use the helitim leak detection method. |
| method. No leaks were found using this method due probably to their | |
| ;
| |
| small size. The Waterbox was returned to full service and arrangements were made for a contractor to come in and use the helitim leak detection method. | |
| f 2 3 4 l': Ferced Reason. Meth*Hl: IThibit G Instantin.ns S: S(hed uled A 1 iuippicos l~:nhne f laptain) 1-M unsal for Pirr.n atnin of I)at : | | f 2 3 4 l': Ferced Reason. Meth*Hl: IThibit G Instantin.ns S: S(hed uled A 1 iuippicos l~:nhne f laptain) 1-M unsal for Pirr.n atnin of I)at : |
| l1 II.Maintenante of lest 2-Manual Suain. 1 nirs Sti ects loi l io-m.re l r.itcincling .L Antoinatic Scrain. I vent Ittport ii i Rll de INI11ll G. | | l1 II.Maintenante of lest 2-Manual Suain. 1 nirs Sti ects loi l io-m.re l r.itcincling .L Antoinatic Scrain. I vent Ittport ii i Rll de INI11ll G. |
| D lirrut.tions Itrssiiision .I Other (l.spl.nn) tilt.. ) | | D lirrut.tions Itrssiiision .I Other (l.spl.nn) tilt.. ) |
| 1 -() pes.itos li.iining & 1 teense l x.tinin.stson | | 1 -() pes.itos li.iining & 1 teense l x.tinin.stson |
| ;
| |
| : 17. Ad!ninist r.it is e G. Operational I uns ll'xpl.an) I shibit I . Sanv Source (0/77) ll Other II splini) | | : 17. Ad!ninist r.it is e G. Operational I uns ll'xpl.an) I shibit I . Sanv Source (0/77) ll Other II splini) |
|
| |
|
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
I APPENDIX B AVERAGE DAILY PO.ER LEVEL DCCKET TIO. 067-0325 UNIT BRUNSetICK UNIT I DATE II/03/dC COMPLETED BY EULIS ?fILLIS TELEPHONE 719-457-9521 OCTG3ER 80 DAY AVG. DAILY PohER LEVEL DAY AVG. DAILY PO?iER LEVEL (MWE-NET) ( M WE-N ET )
I 744 17 665.
2 751. Id 423.
3 773. 19 635.
4 769 20 605.
6 76d. 21 543.
6 773. 22 735.
7 770. 23 754 d 765. 24 773.
9 763. 25 768.
10 761. 25 804 Il 762. 27 768 12 667. 28 772.
13 704 29 768.
14 24 37 765.
IS 10. 31 766.
16 474 1.1$ - 6
_ _ _8cn34oge7
i, OPERATING DATA REPORT c i
DOCKET 'lO. C:G-0325 DATE II/03/80 COMPLETED SY EULIS WILLIS TELEPHONE 919-457-9521 1
i OPERATING STATUS J s. UNIT NAME: BRUNSWICK UNIT I I NOTES I l 2. REPORTING PERIOD: OCTOBER 80 I :
- 3. LICENSED THERMAL POWER (MNT): 2436 I !
4 NAMEPLATE RATING (GROSS MNE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 921.0 I I i 6. MAX DEPENDABLE CAPACITY (GROSS MWE ): S IS.0 I i '
- 7. MAX DEPENDABLE CAPACITY (NET ' AWE): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATI' LGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
, GIVE REASONS:
i l 9 POWER LEVEL TO WHICH RESTRICTED I: AtlY (NET MWE): NONE
- 10. REASONS FCR RESTRICTION IF ANY:
i 4
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 745.0 7 32',.0 31777.0 l 12. NUMBER OF HOURS REACTCR WAS CRITICAL 712.7 5029.6 22419.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 a.C 1647.I 14 HOURS GENERATOR ON LINE 701.9 4666.1 20999.0
- 10. UNIT RESERVE SHUTDOWN HOURS 0.0 3.0 0.C
- 16. GROSS THERMAL ENERGY GENERATED (M/1H) 1542606.I 9318029.0 43147526.I
- 17. GROSS ELECTRICAL ENERGY GENERATED (MhH) 5173G7.0 3115844.0 14354663.0
- 18. NET ELECTRICI AL ENERGY GENENATED (MWH) 502104.0 299d989.0 13806799.0 .
I 19 UNIT SERVICE FACTOR 94.2 6,3.7 66.I
- 20. UNIT AVAILABILITY FACTOR 94.2 63.7 66.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) S5.3 51.9 55.0 j 22. UNIT CAPACITY FACTOR (USING DER NdT) 82.1 49.9 52.9
]
- 23. UNIT FORCED OUTAGE RATE 5.8 9.6 19.I
- 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE AND DURATION CF EACH)
- :
j 25. IF SHUTDGWN AT END OF REPORT PERIJD, ESTIVATED DATE OF START UP: 0/ 0/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO C04MERICIAL OPERATION): FCRCAST ACHEIVED INITIAL CRITICALITY - - - - - - - - - - - - - -
1 INIII AL ELECTPICITY - - - - - - - - -
l COMMERICIAL OPERATION - - - - - - - - - - - - - - -
1.16 - 9 i
I i
i
.. - . - . . ~ . . - - - - ~ _ - , . - . - - . - - - - - _ . - . - _ . _ - _ . - - - - . _..-. . - . - -
- e. .-
i p ,
. t IHR KI I N".*
-hMk w i
[J uni r Silu ll> OWNS AND I'OWI R RI Dt!CilONS UNIINAMI 1413! November. 1980_ r COMI'I.EIlip HY .Etalis_A.__W I 11 is j RI.Pult1 SiONIII _Dct.ubur _1.980 I T.Lill'!IONE (914) 457-9511. FM !
. G' l c---m
";. (c32R
, jE 3 ) $k I icenwe [-e,, hL MU Came & roesettive O N i. Date g 3g ( .5 s E I.ent 7 Attion to P
$5 5 j@ Report e <E L l*rewns Returiente g 6 Q \
D 43.1 3 N/A CC ZZZZZZ The icactor scrammed because of Iligh *
- 022 801014 F C T
Flain Steam Line flow while testing the l l
e -
stop valves. The liigh Main Steam Line 5 flow was caused by operatinP, with too i few steam lines for total steam flow j
during Main Stop Valve test ing. :
t Followed Emergency Instrinction 31 to I bring the plant to a safe and stable condition. Generated a procedure ;
for plant Operations with only three
}[ lines available. i
> r i .
i i
l j i 2 3 4
] I': forced Reawn : Met hoil . lif nbit G - linte nt sions !
S: Stheduled A l'ipupment l'ailure (laplaint I M.nnsal for Prep.n.ittiin ol Data
- 11 Maintenance of Irst M.'nual Sciain. I n'es M cch for t.isenwc
] r.itetorting .
1 Autom.. sic Sci.nn. I scn't Itcp..re il I lu I etc INilRI G ,
i D I cyntaions itesteicsson 4 8itf.ca t 1- splan t
. o t e.1 6 !
l Opci.ator fi.nnitig X l. accuse 1 xarninahon F.Administ ratise 5 G-Operation.il l'iin: I E xplain) 1.xtobit I Same Source I 1
ci,+7 7 ) Il.Oitics ilisplain)
em -.,
4 i
NOI EI I NU- 0M-0325 tINII' SillllDOWTX ANil POWl'R RI'.DilrilONS IJNII NAMl. .Jlrunswjck_No _] 6 D s I1. _Hovembcr..1980.
lll.Polt ! MON ill _Qtirher.J980 ( OMI't.fi 11 D itY .Eulls_A (919) 457-9521 W111Ls Q '
- I I.t.l l If 0NI l' h
' c:== 2
._ h E @
5: 'b 2 Iacemec E -t b, C.inse & ronettive C::::2 M
1 -
Nii . Date { jj h 3 (E I ? I! vent 5i S. >~l Action to '
H 3 :i 5 jgg Itcpos t er AU j' Pieveni itet urrenic g 6
i G=@
023 8010N F 23.1 B l N/A IIC llTEXCll Reduced power for a leak check of IB
. Nort h Condenser Waterl>ox.
b The Waterbox was taken out of service and leak checked using the llandl-Wrap
)
method. No leaks were found using this method due probably to their small size. The Waterbox was returned to full service and arrangements were made for a contractor to come in and use the helitim leak detection method.
f 2 3 4 l': Ferced Reason. Meth*Hl: IThibit G Instantin.ns S: S(hed uled A 1 iuippicos l~:nhne f laptain) 1-M unsal for Pirr.n atnin of I)at :
l1 II.Maintenante of lest 2-Manual Suain. 1 nirs Sti ects loi l io-m.re l r.itcincling .L Antoinatic Scrain. I vent Ittport ii i Rll de INI11ll G.
D lirrut.tions Itrssiiision .I Other (l.spl.nn) tilt.. )
1 -() pes.itos li.iining & 1 teense l x.tinin.stson
- 17. Ad!ninist r.it is e G. Operational I uns ll'xpl.an) I shibit I . Sanv Source (0/77) ll Other II splini)
J
.=w.
^ Ps .
IlOCKI.1 NO. _050_0325 11 NIT SillliDOWNS AND POWIIt RI DIJCllONS UNilNAMI; lirunswick No. 1 D A Il- November,_1980 00'.1P1 IJII.li ny _Eulin_A,_W1111s Ill.P oltI >1O N ill Octoher. 1980 .Ill.1 P!!ONI; (919) 457-9521
.I '
l , !1 3 3.E'
.3 r, E I it entec I .s ni
[-(
- g hq, r ou. t rouettive q No. Date 5i Ai s n.n t.,
H r;-
$E 5 4
Ji @ cs iteroit # 5L e$'
u Present itetursence M 5 Nd OA 801019 F 40.0 Il 1 N/A IIC llTEXCll Reduced power to leak check 18 North M Condenser Waterbox. The condenser p q
tube leak of outage i/80-022 which was too small to be found using the g llandi-Wrap method was to be repaired.
t-( ,) '
l The contractor found one Icaking tube O in the upper right section. The (al ,
inlet and outlet ends of the tube were
" plugged with brass condenser plugs.
i e
1 .
i 4
t 2 3 3 i f: l'orced Iteason . Method: l'..hibit G - Inst rut tions S: Scheduled A li nipinenti rathne (liplain) 1 -Man nat to, prep.n.ition . f nas:,
j 11 Maintenanic of Test 2 Manna St r.nn. I:nirs Sheets len i kco.cc C itet uchng 3 Antoinatie Scr.nn. I sen't pcport il I leiI ite (Nititi G.
-1 Of hes (17.xpl.un) O D,1 I D Iter.nlaton Itcst a n toin 1 Opeutor li.iining A I st enu lhanunation
> 17- Arhninist ratis e 5 i
G Operation il I.a ror (l;xph:in) I:shibit I- Same Source
("/77) ll Other (l'splaini
APPENDIX DOCKET N0. 050-0325 UNIT: Brunswick No. 1 DATE: November, 1980 COMPT.ETED BY: Eulis A. Willis Operations Summarv Brunswick No. 1 Brunswick No. 1 operated at a 94.2% availability factor for the month of October with a 85.3% capacity factor. The one major outage was attributed to operating with too few steam lines for total steam flow.
A detailed description of the forced outage is provided in the Unit Shutdown and Power Reductions Log (Appendix D) provided with this report.
There are 476 BWR and 154 PWR spend fuel bundles in the Brunswick Unit No. 1 fuel pool.
l