ML19350F055: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 147: | Line 147: | ||
maintenance outage. | maintenance outage. | ||
-There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No.1 fuel pool. | -There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No.1 fuel pool. | ||
i 4 | i 4 | ||
e | e | ||
Line 157: | Line 154: | ||
[ | [ | ||
l | l | ||
4 APPENDIX DOCIET NO: 050-0324 UNIT: Brunswick No. 2 DATE: June 1981 COMPLETED BY: - Frances Harrison OPERATIONS | 4 APPENDIX DOCIET NO: 050-0324 UNIT: Brunswick No. 2 DATE: June 1981 COMPLETED BY: - Frances Harrison OPERATIONS | ||
Line 195: | Line 190: | ||
* 3 Autornatic Scram. | * 3 Autornatic Scram. | ||
* C Itcfuchng 4 Continuations 0161) | * C Itcfuchng 4 Continuations 0161) | ||
D Regulatory Restriction E-Operator Trainmg1 License Examination 5-Load Reductions 5 F Adminisiniive 6-Other Exhits: I Ssine Source | D Regulatory Restriction E-Operator Trainmg1 License Examination 5-Load Reductions 5 F Adminisiniive 6-Other Exhits: I Ssine Source | ||
* G-Operational Error (Explain) - | * G-Operational Error (Explain) - |
Latest revision as of 02:38, 18 February 2020
ML19350F055 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 06/01/1981 |
From: | Harrison F CAROLINA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML19350F054 | List: |
References | |
NUDOCS 8106240143 | |
Download: ML19350F055 (10) | |
Text
,
- g ,
I APPENDIX'B ,
AVERAGE DAILY POWER. LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 06/01/81 COMPLETED BY FRANCES HARRISur TELEPHONE 919-457-9521 MAY-~8I DAY AVG.' DAILY POWER LEVEL - D AY -- AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) lc l7 -4 I -5.
2 -4 18 -5.
-3 -4. 19 -4.
4 -5. 20 -5.
5~ -4. 21- -5.
6 -5. -22 -5.
7 -5. 23 -5.
o- -5. 24. -4 V -4. ' 25 -5.
10 -5 . - 26 -4.
11 -4 27 -5.
12 -4 28 -5.
13 -4. 29 -4.
I4 -5. 30 -5.
15- -5. 31 -5.
16 -5.
1.16 - 8
!- 8106240l%
4-OPERATING DATA REPORT -
DOCKET NO. 050-0325 DATE 06/01/81 COMPLETED BY FRANCES HARRISq" TELEPHONE 919-45.7-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT I I NOTES I
- 2. REPORTING PERIOD: MAY 81 I I
- 3. LICENSED THERMAL POWER (MNT): 2-436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASOtlS:
V. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET - MWE): f.IONE 10.' REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL
. MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 7 44 .0 3623.0 36864.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2134.3 25936.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
- 14. HOURS GENERATOR ON LINE 0.0 2056.8 24438.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GENERATED (M?lH) 0.0 3841575.6 49965308.5
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 l 256185. 0 16581779.0 id. NET ELECTRICIAL ENERGY GENERATED (MWH) -3384.0 1203366.0 15950800.0
- 19. UNIT SERVICE FACTOR 0.0 56.8 66.3
- 20. UNIT AVAILABILITY FACTOR 0.0 56.8 66.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) -0.6 42.0 54.8
- 22. UNIT CAPACITY FACTOR (USI?:0 DER NET) -0.6 40.5 52.7
- 23. UNIT FCRCED OUTAGE RATE 100.0 31.1 l9.4
- 24. SHUTLOWNS SCHEDULED OVER NEXT 6 M3NTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 6/20/81
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY ----
COMMERICIAL OPERATION ,
I.16 - 9 P00RDRGINAL l
- - - - . . . , , .~. ___ _
~ -
BRUNSWICK UNIT I 06/01/81 MAX HOURLY ELEC GEN 0.0 flVCLEAR BTUS 0.0 HEAT RATE 0.0 THERMAL GENERATION 0.0 EFFECTIVE FULL POWER DAYS 0.0 ELEC OUTPUT FACTOR 0.0 CIRC WATER INLET TEMP MAX / MIN 0.0/125.0 CIRC WATER OUTLET TEMP MAX /!(IN 0.0/125.0 AMB TEMP MAX / MIN / AVG 72.0/ 49.0/ 6I.6 m
i t'
- a x 4
APPENDIX B AVERAGE-DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2
- 4. DATE 06/16/81 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 MAY 81 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 '750, 17 -10.
i 2 308. 18 -10.
3 31. 19 -11.
4 277. 20 -10.
-5 496. 21 -9.
6- 79. 22 -10.
7 -13. 23 -10.
8 -11. -
24 -11.
9 -11. 25 -11.
10 -11. 26 -11.
11 -11. 27 -10.
12 -11, 29 _1g, 13 -10. 29 -11.
14 -10. 30 -10.
15 -11. 31 -10.
16 -10.
f 1
9 1.16 - 8
- 300R DifGINAL
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 06/16/81 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 GPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD:-MAY 81 I I I
- 3. LICENSED THERMAL POWER (MWT): 2436 I 4 '. NAME? LATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELEC1RICAL RATING (NET MWE): G21.0- I I
- 6. MAX DEPENDABLE CAPACITY-(GROSS MWE): 815.0 -------------------------------
I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS-(ITEMS 3 THRU 7) SINCE LAST REPORTr GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY-(NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE 1~1. HOURS IN REPORTING PERIOD 744.0 3623.0 48888.0
- 12. NUMBER OF HOURS REACTOR WAS GRITICAL 125.7 1804.0 30826.3
- 13. REACTOR RESERVE SHUTDOWN. HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON LINE 104.7 1626.1 28590.3
-15. UNIT RESERVE SHUTDOWN HOURS -
0.0 0.0 0.0
-16. GROSS THERMAL ENERGY GENERATED (MWH) 147278.9 2637284.5 52248655.4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 49083.0 901740.0 17466186.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 40297.0 852227.0- 16757456.0
- 19. UNIT SERVICE FACTOR 14.1 44.9 58.5
- 20. UNIT AVAILABILITY FACTOR 14.1 44.9 58.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 6.9 29.8 43.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 6.6 28.7 41.8
- 23. UNIT FORCED OUTAGE RATE 85.9 52.6 17.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
l
- 25. IF SHUTDCWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 6/ 4/81
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED r INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
i ,
, COMMERICIAL OPERATION -------- --------
l i 1.16 - 9
..s. - ,.
, - SRUNSWICK UNIT 2 06/16/81 s
[ MAX HOURLY ELEC GEN 775.0 NUCLEAR BTUS 0.5026630E+12 HEAT RATE 12474.0 THERMAL GENERATION 6136.6 EFFECTIVE FULL POWER DAYS 2.5 ELEC OUTPUT FACTOR 48.7
. CIRC WATER INLET TEMP MAX / MIN 81.0/ 69.0 CIRC WATER OUTLET TEMP MAX / MIN 85.0/ 68.0 .
AMB TEMP MAX / MIN / AVG 0.0/125.0/ 0.0 0
e e.
4 1
P00R DRIBNAL
- a J.
. APPESTIX i
DOCKET NO: 050-0325 '
UNIT: Brunswick No.~1-
- DATE
- June 1981 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO.1 I Brunswick Unit' No. I was off the line for the entire month of May for a planned- -
maintenance outage.
-There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No.1 fuel pool.
i 4
e
+
W 5
p
[
l
4 APPENDIX DOCIET NO: 050-0324 UNIT: Brunswick No. 2 DATE: June 1981 COMPLETED BY: - Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 2
Brunswick Unit No. 2 operated'at a 14.1% availability factor for the month of May with a 6.9% capacity factor. There were two "off-11ae" outages this month,-
both are detailed in Appendix D, the unit shutdowns saa power reductions log.
There are 264 BWR-and 144 PWR spent fuel bundles its the Brunsw.'ck Unit No. 2 fuel-
.. pool .
e e
i e
4 O
,e r gu< 9~ n e= e t w- e ei 1* *p-y e &4 6 w , +, es - a , --ww,*-w egw o- e, a- , e m w ,m -pye , - , +g -acte,
j, .
l "
y 050-0324 ,
- DOCKET NO. .
UNIT SilUIDOWNS AND POWER R8 DUCT 10NS UNIT N ANIE __ Brunswick No. 31:
DATE _ June 1981 g; CO5tPLETED BY Frnnr-on Harrino e
- REPORT 510N111 May 1981 TELEPIIONE (414) 457-9521u C =
- Cause & Currective S h ..? ; 5 r,
-, .$ i; 3yU Licensee Event ;; ? E.U Action to O
g 3g 4 No. Date H $Ej $ Ji g5 Report 80 [3 Prevent Recurrence C" -
B32-F051 valve packing was leaking 2 21.00 A 2 N/A SF VAL'.7EX excessive 1y.81-015 81 05 03 ,
Tighten packing for minimal leakcge.
Repack valve during next outage. .
... <o I
3 4
2 Method: Exhibit G Instructions I for Prcparation of Data F: Forced Reamn: ! 41anual A-1ilmpment railure(Explain) Entry Sheets for Licensee
-S: Scheduled 2 Manual Scrain. Event Report (LER) File (NUREG.
ll Mainiciunce oi Test
- 3 Autornatic Scram.
- C Itcfuchng 4 Continuations 0161)
D Regulatory Restriction E-Operator Trainmg1 License Examination 5-Load Reductions 5 F Adminisiniive 6-Other Exhits: I Ssine Source
- G-Operational Error (Explain) -
ll Other (Ewplain)
(9/77) t
- f. .
O' O '
O Q W.
i y=
C 050-0324
. DOCKET NO.
Brunswick No. 2 ED UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N.OIE DATE June 1981 g .
i COMPLETED BY Frances. Harrison g REPORT MONTil May 1981 TELEPilONE (919) 457-9521 M
O r
C E
E Cause & Corrective 1
b
.$g 3 j I'i Licensee E r,
- , n? o3 Action to ME $ = E s'~' Event No. Date F-4 Report # N0 $U Prevent Recurrence
, $$ $ 3,e ih: u .
d .
SF HTEXCil Growth of oystero in the nuclear 1 618.3 A 3 N/A conventional service water system 81-016 81 05 06
- restricted heat exchanger flow.
Shell growth was cleaned from the conventional aud nuclear system pipitig
~
and components,
~
i -
-s .
r a t . ,
1 .
i b =
t I
3 4
I 2 Exhibit C Instructions
< 1 Method: for Preparation of Data I F: Ferced Resum: 14fanual A.I'qmpment Failure (Explain) , 24f anual Scrarn. Entry Sheels for Liecusec
! S: SeneJuled Esent Report (LER) File (NUREG.
- n.Mainten.inee of Test 3 Automatic Scram.
C Itcfueling l 4 Continuations 01611 l ,
D Itegulatoi> ltestriction ;
E Operator Training & License Examination 5-Load Reduccions 5 J ~
F Administrative t
6-Other Exhibit 1.Same Sousa *
' ' C Operational Error (Explains l llother (Explain) i (9/77) !
- l