LICENSEE EVENT REPORT Cowinoi etoCC LLi 1 I IJc    i
LICENSEE EVENT REPORT Cowinoi etoCC LLi 1 I IJc    i
                                           ''!.'.':A"                              L .C c ~,. ~., ooc .                            ' 'N .T '            5,*J T oi      10lHIDIBISilj                              l0 j Oj - J 0[ 0 ! Nl P 'F J -10                    l.s31 l 4[ljl l l]lj
                                           ''!.'.':A"                              L .C c ~,. ~., ooc .                            ' 'N .T '            5,*J T oi      10lHIDIBISilj                              l0 j Oj - J 0[ 0 ! Nl P 'F J -10                    l.s31 l 4[ljl l l]lj
                         ,                                    . . . ,s zS                            e  10gla
                         ,                                    . . . ,s zS                            e  10gla Ca .o...            n n :.iz.= :                oo        ~u    .. .                  , , . . , , . . .              .< e.,om,.
                                                                                                                                                          ,
Ca .o...            n n :.iz.= :                oo        ~u    .. .                  , , . . , , . . .              .< e.,om,.
CONT                                                  0t5 t 0 l --i 0 13 l4 1 6
CONT                                                  0t5 t 0 l --i 0 13 l4 1 6
[
[
Line 36: Line 34:
* c o or        suae    t.        u 7[# n"c"tYn't I          .      v oos a e ro**
* c o or        suae    t.        u 7[# n"c"tYn't I          .      v oos a e ro**
8 twici 7    89 80 LJJ    ti IPintMIPlYlvI 12                        IJ
8 twici 7    89 80 LJJ    ti IPintMIPlYlvI 12                        IJ
                                                                                         -      L2J eJ I z lo l o f o l es            er LHJ og CAust DE SC asp YtoN ota l
                                                                                         -      L2J eJ I z lo l o f o l es            er LHJ og CAust DE SC asp YtoN ota l Decay Heat Pu=p._1_-2_yas inocerable to install a unfen.                                                                                      I aa 7    89                                                                                                                                                        $
                  .,
Decay Heat Pu=p._1_-2_yas inocerable to install a unfen.                                                                                      I aa
                      !
7    89                                                                                                                                                        $
7.~..
7.~..
eO
eO
/
/
\      )
\      )
8L89 1                                                                                                                                                      __ .JA
8L89 1                                                                                                                                                      __ .JA g s EN's*                  s cow.e .                ot..e. Status        us0 .*                        Discowt av neaCnerv eoae 8
* g s EN's*                  s cow.e .                ot..e. Status        us0 .*                        Discowt av neaCnerv eoae 8
7    0 L3J 9
7    0 L3J 9
L9JO10i to            12 LJA IJ                      **
L9JO10i to            12 LJA IJ                      **
l (2j            (    n                                              j 46
l (2j            (    n                                              j 46 e e j e. ma no                                                                  et                                                          _So c on. e g me e
_
e e j e. ma no                                                                  et                                                          _So c on. e g me e
                       .ac* t* c* ast vs t D v os ng a g ast muouas t or acteve1w 8
                       .ac* t* c* ast vs t D v os ng a g ast muouas t or acteve1w 8
7      8          9 LZ_.J . LZJ to l NA eI                                a4 1        l 45 NA L OC A t tO** c' .c L C a%C I
7      8          9 LZ_.J . LZJ to l NA eI                                a4 1        l 45 NA L OC A t tO** c' .c L C a%C I
Line 63: Line 54:
           %( NA                                                                                                                                                        M I
           %( NA                                                                                                                                                        M I
LoS5 oR Q AMay( 10 F ACILliv s v PC          OL S C . se v ione Q                                .
LoS5 oR Q AMay( 10 F ACILliv s v PC          OL S C . se v ione Q                                .
                                                                                                                                                                        "
PU8LiCf 7v i
PU8LiCf 7v i
l          NA
l          NA
Line 73: Line 63:
,s                                                                                                                                                                      ya
,s                                                                                                                                                                      ya
                                     , , , ,        Jacque Lingenfelter/ Sue Vallade                                        ,
                                     , , , ,        Jacque Lingenfelter/ Sue Vallade                                        ,
(4197 259-5000, Ext. 251
(4197 259-5000, Ext. 251 80 01270 f N
                                                                                                    .
80 01270 f N


_    . _  _              _ . - - _ _
_
                                       ~,
                                       ~,
    .
O                                    TOLEDO EDISON COMPANY
O                                    TOLEDO EDISON COMPANY
       \.                    DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-66
       \.                    DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-66 DATE OF EVENT: August 24, 1977 FACILITY: Davis-Besse Unit 1 I
!
DATE OF EVENT: August 24, 1977 FACILITY: Davis-Besse Unit 1 I
IDENTIFICATION OF OCCURRENCE: Decay Heat Pump 1-2 was made inoperable to install union in cooling water line.
IDENTIFICATION OF OCCURRENCE: Decay Heat Pump 1-2 was made inoperable to install union in cooling water line.
_
Conditions Prior to Occurrence: The plant was in Mode 2, with Power (MWT) = 0 and Load OL'E) = 0.
Conditions Prior to Occurrence: The plant was in Mode 2, with Power (MWT) = 0 and Load OL'E) = 0.
Description of Occurrence: On August 24, 1977 at 0915 hours, Decay Heat Pu=p 1-2 was taken out of service to install a union on the Component Cooling Water Return line. This placed the Station in Action State =ent (a) of Technical Specification 3.5.2 since one of the two Decay Heat Pu-ps required in Mode 2, startup, was removed from service.
Description of Occurrence: On August 24, 1977 at 0915 hours, Decay Heat Pu=p 1-2 was taken out of service to install a union on the Component Cooling Water Return line. This placed the Station in Action State =ent (a) of Technical Specification 3.5.2 since one of the two Decay Heat Pu-ps required in Mode 2, startup, was removed from service.
Designation of Apparent Cause of Occurrence: This was a planned =aintenance activity. There was a loose piping connection on the inboard side of the Component Cooling Water Return line for Decay Heat Pump 1-2.            a union was installed in the line to allow tightening without re= oval of previously installed seismic supports.
Designation of Apparent Cause of Occurrence: This was a planned =aintenance activity. There was a loose piping connection on the inboard side of the Component Cooling Water Return line for Decay Heat Pump 1-2.            a union was installed in the line to allow tightening without re= oval of previously installed seismic supports.
Analysis of Occurrence: There was no danger to the health and safety of the public or Station personnel. Decsy Heat Pump 1-1 was still available to operate
Analysis of Occurrence: There was no danger to the health and safety of the public or Station personnel. Decsy Heat Pump 1-1 was still available to operate in the event of an accident.
'
in the event of an accident.
Corrective Action: The union was installed, completing the scheduled =aintenance.
Corrective Action: The union was installed, completing the scheduled =aintenance.
Decay Heat Pump 1-2 was returned to service at 1515 hours on August 24, 1977, removing the Station from Action Statement (a) of Technical Specification 3.5.2.
Decay Heat Pump 1-2 was returned to service at 1515 hours on August 24, 1977, removing the Station from Action Statement (a) of Technical Specification 3.5.2.
Failure Data: There have been no previous occurrences involving Decay Heat Pump 1-2 for planned maintenance.
Failure Data: There have been no previous occurrences involving Decay Heat Pump 1-2 for planned maintenance.
  ,
l
l
                               . _ _ .}}
                               . _ _ .}}

Latest revision as of 06:31, 1 February 2020

RO NP-33-77-66:on 770824,decay Heat Pump 1-2 Taken Out of Svc While Installing Union on Cooling Water Line.Planned Maint Activity Allowed Seismic Support Tightening.Maint Completed & Heat Pump Returned to Svc
ML19319B790
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/19/1977
From: Lingenfelter J, Vallade S
TOLEDO EDISON CO.
To:
Shared Package
ML19319B717 List:
References
NUDOCS 8001270258
Download: ML19319B790 (2)


Text

..

LICENSEE EVENT REPORT Cowinoi etoCC LLi 1 I IJc i

!.'.':A" L .C c ~,. ~., ooc . ' 'N .T ' 5,*J T oi 10lHIDIBISilj l0 j Oj - J 0[ 0 ! Nl P 'F J -10 l.s31 l 4[ljl l l]lj

, . . . ,s zS e 10gla Ca .o... n n :.iz.= : oo ~u .. . , , . . , , . . . .< e.,om,.

CONT 0t5 t 0 l --i 0 13 l4 1 6

[

j g i 7 t 4 [717Q [01 9 1 1 1 9;77 1 t vtNT Of SCnervioN 7

@!89 Decay Heat Pump 1-2 was taken out of servtge to in=tah m<en on the j

- go

@l89 7

Compenent Cooli_ng, n water Return line. This niaced the im i e in Ar-4n,  !

a 8l89 7

Statement (a) of Technical Seecificaticn 3.5.2,_,,(NP-33-77-60 f w

EL89 7 1 EL A i

(Tot onY c n=enews **

  • c o or suae t. u 7[# n"c"tYn't I . v oos a e ro**

8 twici 7 89 80 LJJ ti IPintMIPlYlvI 12 IJ

- L2J eJ I z lo l o f o l es er LHJ og CAust DE SC asp YtoN ota l Decay Heat Pu=p._1_-2_yas inocerable to install a unfen. I aa 7 89 $

7.~..

eO

/

\ )

8L89 1 __ .JA g s EN's* s cow.e . ot..e. Status us0 .* Discowt av neaCnerv eoae 8

7 0 L3J 9

L9JO10i to 12 LJA IJ **

l (2j ( n j 46 e e j e. ma no et _So c on. e g me e

.ac* t* c* ast vs t D v os ng a g ast muouas t or acteve1w 8

7 8 9 LZ_.J . LZJ to l NA eI a4 1 l 45 NA L OC A t tO** c' .c L C a%C I

M Pt n50NNEL t aiPC$URE$

swuwet . ~ ev.f OF SC .o rT 80*s

)

!0 !0 to 1 W L NA 09 Pt n5CNNE L INJUHits It IJ IJ J

muuets ot sc.iev eone

, .\I !01 ,, I,, NA a

1 of F Ssif CON 5E oUf asCES

%( NA M I

LoS5 oR Q AMay( 10 F ACILliv s v PC OL S C . se v ione Q .

PU8LiCf 7v i

l NA

> e, 1 RJ ACOstsONAL eaCTORS 31 a ae NA i

a2

(~3) i

es 1

j

,s ya

, , , , Jacque Lingenfelter/ Sue Vallade ,

(4197 259-5000, Ext. 251 80 01270 f N

~,

O TOLEDO EDISON COMPANY

\. DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-66 DATE OF EVENT: August 24, 1977 FACILITY: Davis-Besse Unit 1 I

IDENTIFICATION OF OCCURRENCE: Decay Heat Pump 1-2 was made inoperable to install union in cooling water line.

Conditions Prior to Occurrence: The plant was in Mode 2, with Power (MWT) = 0 and Load OL'E) = 0.

Description of Occurrence: On August 24, 1977 at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />, Decay Heat Pu=p 1-2 was taken out of service to install a union on the Component Cooling Water Return line. This placed the Station in Action State =ent (a) of Technical Specification 3.5.2 since one of the two Decay Heat Pu-ps required in Mode 2, startup, was removed from service.

Designation of Apparent Cause of Occurrence: This was a planned =aintenance activity. There was a loose piping connection on the inboard side of the Component Cooling Water Return line for Decay Heat Pump 1-2. a union was installed in the line to allow tightening without re= oval of previously installed seismic supports.

Analysis of Occurrence: There was no danger to the health and safety of the public or Station personnel. Decsy Heat Pump 1-1 was still available to operate in the event of an accident.

Corrective Action: The union was installed, completing the scheduled =aintenance.

Decay Heat Pump 1-2 was returned to service at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br /> on August 24, 1977, removing the Station from Action Statement (a) of Technical Specification 3.5.2.

Failure Data: There have been no previous occurrences involving Decay Heat Pump 1-2 for planned maintenance.

l

. _ _ .