LICENSEE EVENT REPORT CoNinot st oCa 1. L.1 I I l__J G
' b'a'w'e' L *C t Nst =u=ot a
,, e's' i v" c't L*
810IH l DlB l S I1l 10 l_0L 3 0l 0 [ N[ P lF l -l 0 l 3l l 4 l lj,1,1 [ 1 h0_1 1
9 88 '
1, 75 2G CAttGee'
- t noC at t muust a t yt N' rs= t s acroat ca s t Covitg_Mj gL [LJ [01 5 1 0 1.-;034 i 6 1 t018121717171 10191212 7 j7 l 1 1 0i S
9 60 61 68 69 74 is M
(vt NT DE SCa P ficas
@l Reactor Coolant Pump 1-1-2 tripped removing one of the two Reactor 7
s9 j
90
@[ Coolant Pumps of the loop from operation. Station in Action Statement
[
s a9 6a 81 of Techni_ cal Specification 4.1.
(NP-33-7 7-64_)_
[
7 9
so GFJ L I
7 89 m
8L i
- I ' " i'nW/
cdE~I.~'. I4 0;?c~,' ",,',.
nA
< o--n ~, ~ t < o n, v. o,... c, o7 t_Q_LB_j LBJ lM101T101R_j_XJ LNJ IW I1 I2 I 0 i LNJ 7
89 so 11 12 17 43 44 47 43 C AUSF DE SCasP TION l The surge capacitors were discovered damaged due to an insufficient mount-i Lina base. The capacitors on all four Reactor coolant Pump motors have been]
2 7
89 4
g[ replaced with new units which incorporate a new design mounting base.
7 89 en S t EIs u
s 'ows a ov eet a S S A f uS utsc av De%Covt av ntscnert sow L B_J LO I 010_J L_NA l LAj
[ _,_NA j
7 0
9 to 12 1J 84 di 46 80
- s. :
D os n'
t auoums or ac t evetv LOC Ai noN c' at tiast 8
[JJ IZJ l NA l
l NA 7
8 9
to is A4 45 60 pt risoNNit E zroSUAE S
{Q@l@l l
)
7 a9 ie iJ 13 M
P( n$oNNE L INjusil($
Nvuot a ot sc e ne s son
(910101 1 NA I
7 0
la 62 80 oF F Sitt CoNSE ouf NCES R
"^
J toss oH oaMat.E To 8 ACitit y e v Pt CE SC a se t eow 3.4@j L NA l
7 PUS E ICI1 v
@[ NA j
7 e,
m ADDilloN AL F ACT OR$
l NA l
7 e9 en 8,. I.
l m
Jacque Lingenfelter/ T. Beeler (419J 259-5000, Ext. 251 PHONE DVR 123-1 79030703l3
TOLEDO EDISON COMPAIN DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-64 DATE OF EVENT: August 27, 1977 FACILITY,: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Reactor Coolant Pump Motor 1-1-2 was declared inoperable on August 27, 1977.
The plant was in Mode 2, with Power (MWT) = 125 Conditions Prior to Occurrence:
and Load (MWE) = 0.
Reactor Coolant Pump Motor 1-1-2 tripped at 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> Description of Occurrence:
on August 27, 1977, with instantaneous ground (50GS) and differential current relay (87m/A-B-C) targets indicating the fault. This placed the Station into the Action Statement of Technical Specification 3.4.1 since one of the two Reactor Coolant Pumps in the loop were not in operation.
Upon inspection of the Reactor Designati., of Apoarent Cause of Occurrence:
Coolant Pump 1-1-2 motor terminal box, Station maintenance personnel discove;ed It has been determined by Westing-B&C phase surge capacitors to be damaged.
house the design of the capacitor base was insufficient for the application.
There was no danger to the health and safety of the Analysis of Occurrence:
The thermal power was at a low value and the public or Station personnel.
re=aining three Reactor Coolant Pumps were supplying the required coolant flow.
for The high flux and the flux-delta-flux setpoints were reset Corrective Action:
three pump operation as required by the Action Statement of Technical Specification Station maintenance personnel replaced C-phase surge capacitors and re-3.4.1.
installed B-phase surge capacitors after caulking the crack in the porcelsin and opening in the seam with RTV silicone sealant.
At 0058 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> on August 31, 1977, Reactor Coolant Pump 1-1-2 was declared operable.
of Technical Specification 3.4.1.a.
This removed the station from Action Statement an inspection was made on the remaining reactor coolant pump 29, 1977, A def ective capacitor was found in A phase f or Reactor Coolant Pump 1-2-2.
On August As mctors.
Station maintenance personnel replaced A phase surge capacitor with a new one.78-470, the capacitors on al1 ~four Reactor Coolant per Facility Change Request Pump motors have been replaced with new units which incorporate a new design mount-2 ing base as of January 20, 1979.
No previous shnilar events have occurred.
Failure Data: