RO NP-33-77-73:on 770917,makeup Pump 1-2 Removed from Svc to Allow Repair of Oil Leak on Outboard Bearing Plate. Caused by Design Deficiency in End Plate Seal.New O-ring Installed
ML19329A782
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/12/1977
From: Brown R
TOLEDO EDISON CO.
To:
Shared Package
ML19329A770 List:
References
NUDOCS 8001150685
Download: ML19329A782 (2)


Text

. .-

(e

~

LICENSEE E'.T 7 HEPORT cominot etocs l_ L,j I I lj -

G

f.' art

  • 6ecc~sc ou . . '?! ~$' 'vJa'

[0j01-l010lUI Ptr ; ,5 l 3l l4llj1ll 1i i I OI 3I

@)sIOIHIDlB1S11)i4 - is n xs ao 3ni C ait oo.."UE' Un*'a'U noen, =u .e = cscui n.ie .c .,om,e oi co=it sF1i IY iLl L1 l W -(0151 si 01 -I 034I It 6 1 se se 10i9I 11717171 111011121717; 24 is go eve =r ut scaiPriou g g At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on-September 17, 1977, Makeup Pump 1-2 was removed from  ;

i ee so

@l service to allow Maintenance to repair an oil leak on the outboard bear- l s es sa lie]t ins and plate. In Action Statement of Tech Spec 3.1.2.4. (NP-33-77-73) l 7 89 w EIUSSL I

so oaL I E" cnNt we IP*[(M;)' f% XI suL_J # tm"' wa7u~s*a"c"v'u*e[r = teow o > tc i c4 Laj IBI 2 61 01 veods 7 eS to si 32 i7 42 44 47 4e CAU5f Ot3CalPitoN , _, ,, ,

i l A design deficiency is the cause of this event. ,The BUNA-N 0-Ring on I g l the bearing end plate did not form an adequate seal and a sealanc was t es a g l needed at the bearing housing. I i es W

's v EEu's s powt a of set a Status u[s oNav usSCovt av OE%Cnsettom 8

7 0 aJ 7

10181 to el LNA i2 IJ 44 i (AJ 46 L NA e6 J

eQ se t o oeNa[Asg awovms or actewstv L.Caisom o' et LE A.C i

W,Q 9

l NA 1 l NA i  ;

7 e 10 si 44 45 eQ j Pf n50NNEL tzrosuats a uves a ' , v es s

of.s e m es via m i

i 3 LO I o! 01 Z l NA - i

.es is i ia . a3 1

etnsc8mtinsuruts  !

e 577tBi i%' si u

" " ~ i ao OF75:f t CON $tOctNCES ~

i l NA l Loss oft Oaunut 10 7 ACILif Y

  • t vPt otSc a se s som eh ko
  • rustic:rv

> i l NA l

> es ,

acceleog4L s ACTUA$

iei NA l t e - - -

l [Tia l

,,4.g Dick Brown (4197 259-5000, Ext. 250 DVR 134-1 30 01150

s g, .

v 1 TOLELO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LE?. NP-33-77-73 DATE OF EVENT: September 17, 1977 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Makeup Pump 1-2 rende, red inoperable to repair oil leak.

Conditions Prior to Occurrence: The plant was in Mode 3, with Power (MWT) = 0, and Load (MRE) = 0.

J Description of Occurrence: At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on September 17, 1977, Makeup Pump 1-2 was removed from service to allow Maintenance to repair an oil leak on the out-board bearing end place. This placed the station in the Action Statement of Technical Specification 3.1.2.4 which requires two Makeup Pumps operable in Mode 3.

\j Designation of Apoarent Cause of Occurrence: The old BUNA-N 0-Ring on the out-board bearing end place did not form. an adequate seal.

Analysis of Occurrence: There was no threat to the health and safety of the public or to station personnel. Makeup Pump 1-1 was operable during the duration of repair to Makeup Pump 1-2.

Corrective Action: A new O-ring was installed on the outboard bearing end plate.

The Makeup Pump was returned to service and declared operable by 2245 hours0.026 days <br />0.624 hours <br />0.00371 weeks <br />8.542225e-4 months <br /> on September 17, 1977, removing the station from the Action Statement of Technical Specification 3.1.2.4.

During a plant outage (October 5,1977), RTV106, a silicone sealant, was applied between the bearing end plate and housing which eliminated minor oil leaks at the housing. Both Makeup Pumps had new 0-rings installed and RIV106 silicone sealant applied at housing during the plant outage.

Failure Data: A Makeup Pump has been inoperable on three previous occasions.

)

~~. -

~