RO NP-33-77-66:on 770824,decay Heat Pump 1-2 Taken Out of Svc While Installing Union on Cooling Water Line.Planned Maint Activity Allowed Seismic Support Tightening.Maint Completed & Heat Pump Returned to Svc
ML19319B790
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/19/1977
From: Lingenfelter J, Vallade S
TOLEDO EDISON CO.
To:
Shared Package
ML19319B717 List:
References
NUDOCS 8001270258
Download: ML19319B790 (2)


Text

..

LICENSEE EVENT REPORT Cowinoi etoCC LLi 1 I IJ i

c

!.'.':A" L.C c ~,. ~., ooc.

' 'N.T '

5,*J T 10lHIDIBISilj l0 j Oj - J 0[ 0 ! Nl P 'F J -10 l 31 l 4[ljl l l]lj 10gl oi

...,s zS

.s e

a Ca.o... n n :.iz.= :

oo

~u

.< e.,om,.

CONT

[

0t5 t 0 l --i 0 3 l4 1 6 j g i 7 t 4 [717Q [01 9 1 1 1 9;77 1

1 t vtNT Of SCnervioN Decay Heat Pump 1-2 was taken out of servtge to in=tah m<en the j on 7

89

- go

@l Compenent Cooli_ng, water Return line. This niaced the im i e in Ar-4n, n

7 89 a

8l Statement (a) of Technical Seecificaticn 3.5.2,_,,(NP-33-77-60 f

7 89 w

EL 1

7 89 EL A

i (Tot onY u 7[# n"c"tYn't.

I c n=enews **

  • c o or suae t.

8 twici LJJ IPintMIPlYlvI L2J I z lo l o f o l LHJ v oos a e ro**

7 89 80 ti 12 IJ eJ es er og CAust DE SC asp YtoN ota l Decay Heat Pu=p._1_-2_yas inocerable to install a unfen.

I aa 7.~..

7 89 eO

/

8L

\\

)

1 89

__.J A

g s EN's*

s cow.e.

ot..e. Status us0.*

8 L3J L9JO10i LJA l (2j

( n

_So Discowt av neaCnerv eoae j

7 0

9 to 12 IJ et 46 e e j e. ma no

.ac *

  • vs t v c on. e g me e
  • t c ast D os ng a g ast muouas t or acteve1w 8

LZ_.J. LZJ l NA 1

l NA I

L OC A t tO** c'.c L C a%C 7

8 9

to eI a4 45 M

Pt n50NNEL t aiPC$URE$

swuwet. ~

ev.f OF SC.o rT 80*s

!0 !0 to 1 W L NA J

)

09 It IJ IJ Pt n5CNNE L INJUHits muuets ot sc.iev eone

.\\I !01 I,,

NA 1

a of F Ssif CON 5E oUf asCES

%( NA I

M LoS5 oR Q AMay( 10 F ACILliv s v PC OL S C. se v ione Q

PU8LiCf 7v l

NA i

1 e,

RJ ACOstsONAL eaCTORS 31 NA i

a ae a2

(~3 i

1 j

)

es

,s ya Jacque Lingenfelter/ Sue Vallade (4197 259-5000, Ext. 251 80 01270 f N

~,

O TOLEDO EDISON COMPANY

\\.

DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-66 DATE OF EVENT: August 24, 1977 FACILITY: Davis-Besse Unit 1 I

IDENTIFICATION OF OCCURRENCE: Decay Heat Pump 1-2 was made inoperable to install union in cooling water line.

Conditions Prior to Occurrence: The plant was in Mode 2, with Power (MWT) = 0 and Load OL'E) = 0.

Description of Occurrence: On August 24, 1977 at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />, Decay Heat Pu=p 1-2 was taken out of service to install a union on the Component Cooling Water Return line. This placed the Station in Action State =ent (a) of Technical Specification 3.5.2 since one of the two Decay Heat Pu-ps required in Mode 2, startup, was removed from service.

Designation of Apparent Cause of Occurrence: This was a planned =aintenance activity. There was a loose piping connection on the inboard side of the Component Cooling Water Return line for Decay Heat Pump 1-2.

union was a

installed in the line to allow tightening without re= oval of previously installed seismic supports.

Analysis of Occurrence: There was no danger to the health and safety of the public or Station personnel. Decsy Heat Pump 1-1 was still available to operate in the event of an accident.

Corrective Action: The union was installed, completing the scheduled =aintenance.

Decay Heat Pump 1-2 was returned to service at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br /> on August 24, 1977, removing the Station from Action Statement (a) of Technical Specification 3.5.2.

Failure Data: There have been no previous occurrences involving Decay Heat Pump 1-2 for planned maintenance.