ML17304B221: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 39: Line 39:
Unit  3 Docket .No. STN 50-530 (License No. NPF-74)
Unit  3 Docket .No. STN 50-530 (License No. NPF-74)
Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted
Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted
                                                                      '.
                     'ery pursuant to Technical Specifications 4.4.4.5 and 6.9                        This report discusses steam generator tube plugging in Unit 3.
                     'ery pursuant to Technical Specifications 4.4.4.5 and 6.9                        This report discusses steam generator tube plugging in Unit 3.
If you have any questions,      please contact T. D. Shriver, Compliance Hanager, at (602) 393-2521, truly yours, J. G. Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc:  D. B. Karner                  (all    w/attachments)
If you have any questions,      please contact T. D. Shriver, Compliance Hanager, at (602) 393-2521, truly yours, J. G. Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc:  D. B. Karner                  (all    w/attachments)

Latest revision as of 05:16, 4 February 2020

Special Rept 3-SR-89-004:on 890512,while Unit in Refueling Outage W/Core Offloaded to Spent Fuel Pool,Inservice Insp of Steam Generators Completed.Complete Results of Insp Will Be Submitted by 900512
ML17304B221
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/30/1989
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00485-JGH, 192-485-JGH, 3-SR-89-004, 3-SR-89-4, NUDOCS 8906070197
Download: ML17304B221 (5)


Text

.

AC CELE PATED Dl Bt'Tl 04 . DEMON STRE O.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906070197 DOC.DATE: 89/05/30 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION HAYNES,J.G. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 3-SR-89-004:on 890512,inservice insp of steam generators completed.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000530 S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 DAVIS,M.J. 1 1 DAVIS,M 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1' NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PS B 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1, NRR/DOEA/EAB 11 1 1 R E PB 10 2 2 NUDOCS-ABSTRACT 1 1' G 02 1 1 RES/DSIR/EIB 1 RES DSR/PRAB 1 1 RGN5 FILE 01 1 1 EXTERNAL EGGG WI LLIAMSi S 4 4 FORD BLDG HOY i A 1 1 L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 NOTES 1 1 NOI< 'IO AL "RIDS" RECIPIENIS:

PLAZAS HELP US K) REDKZ ROOD P1-37 (EXP. 20079) %0

~! CD>TACT 'IHE DOCUMENT."Z CGhIROL DMK, ELIMINATE YOUR NAHE FRY DIS'ZRIBVTI(K LISTS FOR DOCUMENIS YOU DON'T NEED).

TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44

I 4

Arizona Public Service Company P.O, BOX 53999 ~ PHOENIX, ARIZONA 85072 3999 192-00485-JGH/TDS/DAJ Hay 30, 1989 U. S. Nuclear Regulatory'ommission NRC Document Control Desk Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket .No. STN 50-530 (License No. NPF-74)

Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted

'ery pursuant to Technical Specifications 4.4.4.5 and 6.9 This report discusses steam generator tube plugging in Unit 3.

If you have any questions, please contact T. D. Shriver, Compliance Hanager, at (602) 393-2521, truly yours, J. G. Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc: D. B. Karner (all w/attachments)

E. E. Van Brunt, Jr.

J. B. Hartin T. J. Polich H. J. Davis A. C. Gehr INPO Records Center

PALO VERDE NUCLEAR GENERATING STATION Steam Generator Tube Plugging License No. NPF-74 Docket No. STN 50-530 Special Report 3-SR-89-004 This special report is provided pursuant to Palo Verde Unit 3 Technical Specifications 4.4.4.5(a) and 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities. On May 12, 1989, Unit 3 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of seven (7) tubes in Steam Generator No. 1 and ten (10) tubes in Steam Generator No. 2.

Pursuant to Technical Specification 4.4.4.5(b), the complete results of the steam generator tube inservice inspection will be submitted by May 12, 1990.

l