OPERATING DATA REPORT DOCKET NO.      50 ~317 DATE      6/15/79 COMPLETED BY        s. D. Merson TELEPHONE      101-734-5240 OPERATING STATUS Notes
OPERATING DATA REPORT DOCKET NO.      50 ~317 DATE      6/15/79 COMPLETED BY        s. D. Merson TELEPHONE      101-734-5240 OPERATING STATUS Notes
: 1. Unit Name: Calvert Cliffs No. 1
: 1. Unit Name: Calvert Cliffs No. 1
Line 29: Line 27:
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
_
: 9. Power Level To Which Restricted,if Any (Net MWe):              None
: 9. Power Level To Which Restricted,if Any (Net MWe):              None
: 10. Reasons For Restrictions.If Any:          !!/A
: 10. Reasons For Restrictions.If Any:          !!/A This Month            Yr..to-Date          Cumulative
  .
This Month            Yr..to-Date          Cumulative
: 11. Hours In Reporting Period 744                3,623                35,628
: 11. Hours In Reporting Period 744                3,623                35,628
: 12. Number Of Hours Reactor Was Critical                  0.0                2,225.0              28,313.6
: 12. Number Of Hours Reactor Was Critical                  0.0                2,225.0              28,313.6
Line 49: Line 44:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:            June 25,1979
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:            June 25,1979
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION          '
      .
2238 222 (9/77) 7906250}f]4
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION          '
2238 222
                                                                                                                  *
(9/77) 7906250}f]4


                                                                                                                  .
    .
                                                                                                .
OPERATING DATA REPORT DOCKET NO. 50-118 DATE 6/15/79 COMPLETED BY      S. D. Merson TELEPHONE 101 714 'i240 OPERATING STATUS Ca bert Cl W s No. 2                                Notes
OPERATING DATA REPORT DOCKET NO. 50-118 DATE 6/15/79 COMPLETED BY      S. D. Merson TELEPHONE 101 714 'i240 OPERATING STATUS Ca bert Cl W s No. 2                                Notes
: 1. Unit Name:    .
: 1. Unit Name:    .
Line 65: Line 53:
2700
2700
: 4. Nameplate Rating (Gross MWe):      911
: 4. Nameplate Rating (Gross MWe):      911
                                                                                                    .
: 5. Design Electrical Rating (Net MWe).845
: 5. Design Electrical Rating (Net MWe).845
: 6. Maximem Dependable Capac:ty (Gross MWe): 969
: 6. Maximem Dependable Capac:ty (Gross MWe): 969
: 7. Maximum Dependable Capacity (Net MWe).          810
: 7. Maximum Dependable Capacity (Net MWe).          810
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
_
: 9. Power Level To which Restricted.lf Any (Net MWe):          None
: 9. Power Level To which Restricted.lf Any (Net MWe):          None
: 10. Reasons For Restrictions,1f Any:          N/A
: 10. Reasons For Restrictions,1f Any:          N/A "Ihis Month          Yr. to.Date          Cumulative
  .
.-
                                                                  "Ihis Month          Yr. to.Date          Cumulative
: 11. Hours In Reporting Period                                744                3,623              18,983
: 11. Hours In Reporting Period                                744                3,623              18,983
: 12. Number Of Hours Reactor Was Critical                    723.4              3,400.5            16,393.0
: 12. Number Of Hours Reactor Was Critical                    723.4              3,400.5            16,393.0
Line 92: Line 75:
Calvert Cliffs No. 2 is scheduled for a olanned outage starting October 6,                                  1979, and will be six weeks in duration for general inspection and refueling.
Calvert Cliffs No. 2 is scheduled for a olanned outage starting October 6,                                  1979, and will be six weeks in duration for general inspection and refueling.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status IPrior to Commercial Operation):                      Forecast            Achieved
: 26. Units In Test Status IPrior to Commercial Operation):                      Forecast            Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 2238        223 en
      .
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
                                                                                          '
2238        223 en


... . .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. J0-117 UNIT Calvert Cliffs #1 DATE 6/15/79 COMPLETED BY        S. D. Merson TELEPHONE 301-234-5240      _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. J0-117 UNIT Calvert Cliffs #1 DATE 6/15/79 COMPLETED BY        S. D. Merson
              .
TELEPHONE 301-234-5240      _
MONT11      Mny 1970 DAY        AVERAGE DAILY POWER LEVEL                          DAY      AVER AGE DAILY POWER LEVEL (MWe Net)                                                  (Mwe. Net)
MONT11      Mny 1970 DAY        AVERAGE DAILY POWER LEVEL                          DAY      AVER AGE DAILY POWER LEVEL (MWe Net)                                                  (Mwe. Net)
                                    -
I                                                          17                        -
I                                                          17                        -
                                                                                                -
2                        -
2                        -
18
18 3                                                            19 4                                                            20 5                                                          21 6                                                            22 1                                                          y                        -
                                                                                                -
8                                                            24 9                                                            25                        -
                                    -
3                                                            19
                                    -                                                          -
4                                                            20
                                    -
                                                                                                -
5                                                          21
                                    -                                                          -
6                                                            22
                                    -
1                                                          y                        -
                                    -
                                                                                                -
8                                                            24
                                    -
9                                                            25                        -
                                     -                                                          -              ~
                                     -                                                          -              ~
10                                                            26
10                                                            26 l1                                                            27 12                                                            28 13                                                          29 14                                                          30 15                                                          33 16      .
                                    -                                                          -
l1                                                            27
                                    -
                                                                                                -
12                                                            28
                                    -
                                                                                                -
13                                                          29
                                    -                                                          -
14                                                          30
                                    -
15                                                          33
                                                                                                -
                                    -
16      .
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
                                                                                    '
2238 224                  om,
2238 224                  om,


.,  . .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.      50-318 UNIT    calvert Cliffs #2 DATE    6/15/79 COMPLETED BY        S. D.-Merson TELEPHONE 301-234-5240 MONTil      "w-      1070 DAY      AYERAGE DAILY POWER LEVEL                              DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                                                    (Mwe. Net) 3 856                                  g7                    038 2                        857                                  gg                    841 858                                                        842 3                                                              ,9 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.      50-318 UNIT    calvert Cliffs #2 DATE    6/15/79 COMPLETED BY        S. D.-Merson TELEPHONE 301-234-5240 MONTil      "w-      1070
  '
DAY      AYERAGE DAILY POWER LEVEL                              DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                                                    (Mwe. Net) 3 856                                  g7                    038
_
2                        857                                  gg                    841 858                                                        842 3                                                              ,9 4
860                                                        795 20 854                                                        841 5
860                                                        795 20 854                                                        841 5
839                                                        840 6                                                              22 7                        544                                                        482 23 716                                                        676 8                                                                                ,
839                                                        840 6                                                              22 7                        544                                                        482 23 716                                                        676 8                                                                                ,
9                        847                                  25                    835 10                        848                                                        838 26 gg                        845                                                          73 27 843                                                        720 12                                                              23
9                        847                                  25                    835 10                        848                                                        838 26 gg                        845                                                          73 27 843                                                        720 12                                                              23 33                        842                                                        835 29 842                                                        834 34                                                              30 844                                                        833 15                                                              33 839 INSTRUCTIONS On this format, list the averag,e daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
                                                                        '
33                        842                                                        835 29 842                                                        834 34                                                              30 844                                                        833 15                                                              33 839 INSTRUCTIONS On this format, list the averag,e daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
                                                                                        '
                                                                                                                        '"""
2238 225
2238 225


DOCKET NO.        50-317 UNITSHUTDOWNS AND POWER REDUCT10NS UNIT NAME Calvert Cliffs Noa 1 DATE      D/15/74 COMPLETED ay        S. D. Merson REPORTMONTil May, 1979
DOCKET NO.        50-317 UNITSHUTDOWNS AND POWER REDUCT10NS UNIT NAME Calvert Cliffs Noa 1 DATE      D/15/74 COMPLETED ay        S. D. Merson REPORTMONTil May, 1979 TELEPilONE 101-234-5240
                                                                  .
TELEPilONE 101-234-5240
                                                            ".
                                                       -      :                            g
                                                       -      :                            g
                              -
                                       .$ E      3g    yY          Licensee    Eg        g4                Cause & Corrective No.          Date
                                       .$ E      3g    yY          Licensee    Eg        g4                Cause & Corrective No.          Date
{
{
* 3g g$ 6      cE
3g g$ 6      cE
                                                       ,3 g a}:
                                                       ,3 g a}:
3 gg c Event Report a g
3 gg c Event Report a g
mO
mO
: a. "
: a. "
                                                                                          !
Action to Prevent Recurrence
Action to Prevent Recurrence
                                                       <      t                          u 6
                                                       <      t                          u 6
                                                                                                                                              .
79-3    790421        S    744.0      C        1        N/A      RC        FUELXX  Scheduled outage for reactor inspec-tion and refueling and unit inspec-tion.
79-3    790421        S    744.0      C        1        N/A      RC        FUELXX  Scheduled outage for reactor inspec-tion and refueling and unit inspec-
                                                                                -
tion.
  .
N N                                                                                                                                .
N N                                                                                                                                .
U CD    1                    2                                                3                            4 F: Forced          Reason:                                          Method:                        Exhibit G - Instructions N        S: Scheduled        A Equipment Failure (Explain)                      1-Manual                      for Preparation of Data N                            B-Maintenance or Test                            2-Manual Scram.                Entry Sheets for Licensee
U CD    1                    2                                                3                            4 F: Forced          Reason:                                          Method:                        Exhibit G - Instructions N        S: Scheduled        A Equipment Failure (Explain)                      1-Manual                      for Preparation of Data N                            B-Maintenance or Test                            2-Manual Scram.                Entry Sheets for Licensee
Line 189: Line 113:
a DOCKET NO.        50-318 UNITSil'ITDOWNS AND POWER REDUCRONS UNIT NAME Calvert Cliffs No. 2 DATE      6/15/79 COMPLETED By          S.D. Herson REPORT F'.ONDI    May. 1979 TELEPIIONE 301-234-5240 "i                            -
a DOCKET NO.        50-318 UNITSil'ITDOWNS AND POWER REDUCRONS UNIT NAME Calvert Cliffs No. 2 DATE      6/15/79 COMPLETED By          S.D. Herson REPORT F'.ONDI    May. 1979 TELEPIIONE 301-234-5240 "i                            -
No.
No.
                              -
                                       .[E      3      .h  Yk      Licensee      Eg        ,,              Cause & Corrective Date k    3g          i    ,g g $        Event      ~?
                                       .[E      3      .h  Yk      Licensee      Eg        ,,              Cause & Corrective Date k    3g          i    ,g g $        Event      ~?
g        g3                      Action to H    $ ,,      5      j di g      Report a    mO g
g        g3                      Action to H    $ ,,      5      j di g      Report a    mO g
U Prevent Recurrence 6
U Prevent Recurrence 6
                                                                                                                                                .
79-7      790507      F  9.4        A          3          N/A      EC        CKTBIW  Forced outage due to a blown fuse on DC power to 21 inverter which caused actuation of the "ESFAS" turbine undervoltage relay.
79-7      790507      F  9.4        A          3          N/A      EC        CKTBIW  Forced outage due to a blown fuse on DC power to 21 inverter which caused actuation of the "ESFAS" turbine undervoltage relay.
79-8      790523      F  10.6        A          1          N/A      EC        TRANSF  Forced outage taken in order'to reapir an oil leak on unit trans-former U-22000-22.
79-8      790523      F  10.6        A          1          N/A      EC        TRANSF  Forced outage taken in order'to reapir an oil leak on unit trans-former U-22000-22.
79-9      790527      F  18.6        A          1          N/A      EG        TRANSF  To repair an oil leak on unit transformer U-22000-22
79-9      790527      F  18.6        A          1          N/A      EG        TRANSF  To repair an oil leak on unit transformer U-22000-22 N
                                                                      .
N U
  .
oc>  I                    2                                                  3                            4 F: Forced          Reason:                                            Method:                        Exhibit G - Instructions N        S: Scheduled        A-Equipment Failure (Explain)                        I-Manual                      for Preparation of Data g                            B-Maintenance of Test                              2-Manual Scram.                Entry Sheets for Licensee q                            C-Refueling                                        3-Automatic Scram.              Event Report (LER) File (NUREG-D Regulatory Restriction                            4-Other (Explain)              0161)
N N
U oc>  I                    2                                                  3                            4 F: Forced          Reason:                                            Method:                        Exhibit G - Instructions N        S: Scheduled        A-Equipment Failure (Explain)                        I-Manual                      for Preparation of Data g                            B-Maintenance of Test                              2-Manual Scram.                Entry Sheets for Licensee q                            C-Refueling                                        3-Automatic Scram.              Event Report (LER) File (NUREG-D Regulatory Restriction                            4-Other (Explain)              0161)
E-Operator Training & Ucense Examination F Administrative                                                                5 G. Operational Error (Explain)                                                      Exhibit I - Same Source (9/77)                  11-01her (Explain)
E-Operator Training & Ucense Examination F Administrative                                                                5 G. Operational Error (Explain)                                                      Exhibit I - Same Source (9/77)                  11-01her (Explain)


                                                                                      -
  ,
6/12/79 REFUELING INFORMATION REQUEST
6/12/79 REFUELING INFORMATION REQUEST
: 1. Name of Facility:    Calvert Cliffs Nuclear Power Plant, Unit No.1
: 1. Name of Facility:    Calvert Cliffs Nuclear Power Plant, Unit No.1
Line 220: Line 138:
(a) 217              (b) 300 Spent Fuel Pools are common to Units 1 and 2.
(a) 217              (b) 300 Spent Fuel Pools are common to Units 1 and 2.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
                '
l056 Licensed 728 Currently Installed 650 Addition is Planned
l056 Licensed 728 Currently Installed 650 Addition is Planned
: 9. The projected date of the last refueling that can be discharged to the spent fuel pcol assuming the present licensed capacity.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pcol assuming the present licensed capacity.
Line 227: Line 144:
2238 228
2238 228


                                                                                    .      ._
  ,
.
6/12/79 REFUELING INFORMATION REQUEST
6/12/79 REFUELING INFORMATION REQUEST
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit 2
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit 2
Line 247: Line 161:
October, 1983
October, 1983
     ** Information has changed since last monthly report.
     ** Information has changed since last monthly report.
                                                            '
2238 229
2238 229
              -    . _ _ _ - .                                          _.
  .
.


==SUMMARY==
==SUMMARY==
Line 259: Line 168:
5/29 At 2200, the reactor vessel head was installed.
5/29 At 2200, the reactor vessel head was installed.
5/31 At the end of this reporting period, Unit I remained shut down for its scheduled third refueling outage.
5/31 At the end of this reporting period, Unit I remained shut down for its scheduled third refueling outage.
                        .
                                '
2238 230
2238 230
.


==SUMMARY==
==SUMMARY==
Line 279: Line 184:
5/28 Full load operation (870 We) resumed at 1600.
5/28 Full load operation (870 We) resumed at 1600.
5/31 At the end of this reporting period, Unit 2 was operating at 870 We with the reactor at 100% power.
5/31 At the end of this reporting period, Unit 2 was operating at 870 We with the reactor at 100% power.
                                                    '
2238 231
2238 231


Line 285: Line 189:
MALFUNCTION SYfirEM OR COMPONENT    MR NO. - DATE              CAUSE                      RESILT        CORRECTIVE ACTIOF ,
MALFUNCTION SYfirEM OR COMPONENT    MR NO. - DATE              CAUSE                      RESILT        CORRECTIVE ACTIOF ,
Wide Range Nuclear    IC-19-011    1/10/79  Defective proportional      Low so_urce counts  Replaced detector Instrumentation                            counter Channel "D" Wide Range Nuclear    IC-79-010    1/10/79  Defective proportional      Low source counts  -
Wide Range Nuclear    IC-19-011    1/10/79  Defective proportional      Low so_urce counts  Replaced detector Instrumentation                            counter Channel "D" Wide Range Nuclear    IC-79-010    1/10/79  Defective proportional      Low source counts  -
Replaced detector Instrumentation                            counter Channel "B"
Replaced detector Instrumentation                            counter Channel "B" e
                                                                                          .
N tra CD N
e N
tra CD N
tra N
tra N
                                                                            .


SAFETY-RELATED MAINTEN/11CE
SAFETY-RELATED MAINTEN/11CE UNIT    I GBOUP    MAINTENANCE MONTH    MAY                  YEAR 1979 MALFUNCTION SYSTEM OR COMPONENT    MR NO. - DATE              CAUSE                      RESULT          CORRECTIVE ACTION
                                                                                                                  .
UNIT    I GBOUP    MAINTENANCE
                                                                                                                          ,
MONTH    MAY                  YEAR 1979 MALFUNCTION SYSTEM OR COMPONENT    MR NO. - DATE              CAUSE                      RESULT          CORRECTIVE ACTION
       #11 Salt Water Pump  M-78-407  7/11/78  Badly worn shaft sleeve,    Excessive gland leakoff. Reconditioned stuff-shaft, and bearings.        No adjustment of gland  ing box, replaced    '
       #11 Salt Water Pump  M-78-407  7/11/78  Badly worn shaft sleeve,    Excessive gland leakoff. Reconditioned stuff-shaft, and bearings.        No adjustment of gland  ing box, replaced    '
Stuffing box covered        possible.                shaft, shaft sleeve, with scale and deterio-                              and bearings. Re-rated paint.                                        packed pump.
Stuffing box covered        possible.                shaft, shaft sleeve, with scale and deterio-                              and bearings. Re-rated paint.                                        packed pump.
1-RV-325              M-79-156  1/31/79  Scratched disc seating    Valve leaked by seat      Replaced disc
1-RV-325              M-79-156  1/31/79  Scratched disc seating    Valve leaked by seat      Replaced disc
       #12 Charging Pump                          surface                                              assembly Discharge Relief Valve
       #12 Charging Pump                          surface                                              assembly Discharge Relief Valve
                                                                                                                            .
     ~ 1-M0V-509            M-79-280  3/15/79  Natural end of life -      Motor operator would      Rebuilt motor Boric Acid Storage                        cyclic fatique of parts. not cycle                operator.
     ~ 1-M0V-509            M-79-280  3/15/79  Natural end of life -      Motor operator would      Rebuilt motor Boric Acid Storage                        cyclic fatique of parts. not cycle                operator.
[[j  Tanks to Charging Pumps
[[j  Tanks to Charging Pumps
Line 308: Line 204:
Lea LeJ
Lea LeJ


SAFETY-RELATED MAINTENANCE UNIT  II
SAFETY-RELATED MAINTENANCE UNIT  II GROUP    IEC MONTH    MAY                    YEAR    1979 MALFUNCTION SYSTEM OR COMPONENT        MR NO. - DATE              CAUSE                      RESULT            CORRECTIVE ACTION Reactor Protective      0-79-356  1/28/79  Defective flow trans-        Reading out of tolerance
                                                                                                                            ,
GROUP    IEC MONTH    MAY                    YEAR    1979 MALFUNCTION SYSTEM OR COMPONENT        MR NO. - DATE              CAUSE                      RESULT            CORRECTIVE ACTION Reactor Protective      0-79-356  1/28/79  Defective flow trans-        Reading out of tolerance
                                                                                     ~
                                                                                     ~
Replaced flow System / Reactor Coolant                      mitter instrument.                                    transmitter and Total Flow' Channel "D"                          2-PDT-lllD                                        repacked instrument caused by leaking                                      isolation valve isolation valve
Replaced flow System / Reactor Coolant                      mitter instrument.                                    transmitter and Total Flow' Channel "D"                          2-PDT-lllD                                        repacked instrument caused by leaking                                      isolation valve isolation valve
                                                                                                      .
     #24 Containment Air      0-79-884  3/11/79  Defective flow trans-      Indicator pegged low        Replaced flow Cooler / Service Water                      mitter                                                transmi.tter Flow Transmitter 1-FI-1592 e
     #24 Containment Air      0-79-884  3/11/79  Defective flow trans-      Indicator pegged low        Replaced flow Cooler / Service Water                      mitter                                                transmi.tter Flow Transmitter 1-FI-1592
N U
                                                                                          .
CD N
e N
U CD N
u k
u k
                                                                               .}}
                                                                               .}}

Revision as of 18:17, 1 February 2020

Monthly Operating Repts for May 1979
ML19270H223
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/15/1979
From: Merson S
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML19270H222 List:
References
NUDOCS 7906250263
Download: ML19270H223 (13)


Text

{{#Wiki_filter:. . OPERATING DATA REPORT DOCKET NO. 50 ~317 DATE 6/15/79 COMPLETED BY s. D. Merson TELEPHONE 101-734-5240 OPERATING STATUS Notes

1. Unit Name: Calvert Cliffs No. 1
2. Reporting Period: Fw- 1979 2700-
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 918
5. Design Electrical Rating (Net MWe): 845
6. Maximum Dependable Capacity (Gross MWe): 845 810
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions.If Any:  !!/A This Month Yr..to-Date Cumulative
11. Hours In Reporting Period 744 3,623 35,628
12. Number Of Hours Reactor Was Critical 0.0 2,225.0 28,313.6
13. Reactor Reserve Shutdowa Hours 0.0 122.7 1,016.3
14. Hours Generator On Line n.o _ 2,196.8 27,741.8
15. Unit Reserve Shutdown flours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 5,562.437.2 66,832,641.6 .
17. Gross Electrical Energy Generated (MWH) 0 ._. 1,818.416 22,204,751
18. Net Electrical Energy Generated (MWH) 0 1.735.525 21.290.513
19. Unit Service Factor 0.0 60.6 77.9_
20. Unit Availability Factor 0.0 60.6 77.9
21. Unit Capacity Factor (Using MDC Neti 0.0 59.1 73.4
22. Unit Capacity Factor iUsing DER Net) 0.0 56.7 70.4
23. Unit Forced Outage Rate 0.0 16.8 8.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 25,1979
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION '

2238 222 (9/77) 7906250}f]4

OPERATING DATA REPORT DOCKET NO. 50-118 DATE 6/15/79 COMPLETED BY S. D. Merson TELEPHONE 101 714 'i240 OPERATING STATUS Ca bert Cl W s No. 2 Notes

1. Unit Name: .
2. Reporting Period: May, 1979
3. Licensed Thermal Power (MWt):

2700

4. Nameplate Rating (Gross MWe): 911
5. Design Electrical Rating (Net MWe).845
6. Maximem Dependable Capac:ty (Gross MWe): 969
7. Maximum Dependable Capacity (Net MWe). 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted.lf Any (Net MWe): None
10. Reasons For Restrictions,1f Any: N/A "Ihis Month Yr. to.Date Cumulative
11. Hours In Reporting Period 744 3,623 18,983
12. Number Of Hours Reactor Was Critical 723.4 3,400.5 16,393.0
13. Reactor Reserve Shutdown Hours 20.6 20.6 240.0
14. Hours Generator t .i-Line 705.4 3,331.3 16,143.1
15. Unit Reserve Shutdown ilours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,852,308.0 8,597,440.8 39,481,457.4 .
17. Gross Electrical Energy Generated (MWH) 608,692 2,890,700 1>,144,ee4
18. Net Electrical Energy Generated (MWH) 532,127' __ ,, 2,766,053 12,534,082
19. Unit Service Factor 94.8 91.9 8 5_. 0..
20. Unit Availability Factor 94.8 91.9 85.0
21. Unit Capacity Factor IUsing MDC Net) 06.6 94.3 81.5
22. Unit Capacity FactoriUsing DER Net) 92.6 90.4 78.1
23. Unit Forced Outage Rate 5.2 2.9 5.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Calvert Cliffs No. 2 is scheduled for a olanned outage starting October 6, 1979, and will be six weeks in duration for general inspection and refueling.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status IPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 2238 223 en

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. J0-117 UNIT Calvert Cliffs #1 DATE 6/15/79 COMPLETED BY S. D. Merson TELEPHONE 301-234-5240 _ MONT11 Mny 1970 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe. Net) I 17 - 2 - 18 3 19 4 20 5 21 6 22 1 y - 8 24 9 25 -

                                    -                                                           -              ~

10 26 l1 27 12 28 13 29 14 30 15 33 16 . INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. 2238 224 om,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 UNIT calvert Cliffs #2 DATE 6/15/79 COMPLETED BY S. D.-Merson TELEPHONE 301-234-5240 MONTil "w- 1070 DAY AYERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (Mwe. Net) 3 856 g7 038 2 857 gg 841 858 842 3 ,9 4 860 795 20 854 841 5 839 840 6 22 7 544 482 23 716 676 8 , 9 847 25 835 10 848 838 26 gg 845 73 27 843 720 12 23 33 842 835 29 842 834 34 30 844 833 15 33 839 INSTRUCTIONS On this format, list the averag,e daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. 2238 225

DOCKET NO. 50-317 UNITSHUTDOWNS AND POWER REDUCT10NS UNIT NAME Calvert Cliffs Noa 1 DATE D/15/74 COMPLETED ay S. D. Merson REPORTMONTil May, 1979 TELEPilONE 101-234-5240

                                                      -      :                            g
                                     .$ E      3g     yY           Licensee     Eg        g4                Cause & Corrective No.          Date

{ 3g g$ 6 cE

                                                      ,3 g a}:

3 gg c Event Report a g mO

a. "

Action to Prevent Recurrence

                                                      <      t                           u 6

79-3 790421 S 744.0 C 1 N/A RC FUELXX Scheduled outage for reactor inspec-tion and refueling and unit inspec-tion. N N . U CD 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions N S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data N B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee & C-Refueling 3-Automatic Scram. Event itspwt (LER) File (NUREG-D-Regulatory Restriction 4-O her(Explain) 0161) E-Operator Training & Ucense Examination F. Administrative 5 G Operational Error (Explain) Exhibit I - Sanw Source (9/77) Ilosher (Explain)

a DOCKET NO. 50-318 UNITSil'ITDOWNS AND POWER REDUCRONS UNIT NAME Calvert Cliffs No. 2 DATE 6/15/79 COMPLETED By S.D. Herson REPORT F'.ONDI May. 1979 TELEPIIONE 301-234-5240 "i - No.

                                     .[E       3       .h   Yk      Licensee       Eg         ,,               Cause & Corrective Date k     3g          i     ,g g $         Event       ~?

g g3 Action to H $ ,, 5 j di g Report a mO g U Prevent Recurrence 6 79-7 790507 F 9.4 A 3 N/A EC CKTBIW Forced outage due to a blown fuse on DC power to 21 inverter which caused actuation of the "ESFAS" turbine undervoltage relay. 79-8 790523 F 10.6 A 1 N/A EC TRANSF Forced outage taken in order'to reapir an oil leak on unit trans-former U-22000-22. 79-9 790527 F 18.6 A 1 N/A EG TRANSF To repair an oil leak on unit transformer U-22000-22 N N U oc> I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions N S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data g B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee q C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161) E-Operator Training & Ucense Examination F Administrative 5 G. Operational Error (Explain) Exhibit I - Same Source (9/77) 11-01her (Explain)

6/12/79 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1

~

2. Scheduled date for next Refueling Shutdown: April 19, 1980
3. Scheduled date for restart following refueling: May 29, 1980
4. Will refueling or resumption of operation thereafter require a technical speci-fication change or other license amendment?

Resumption of operation after refueling will require changes to Technical Speci-fications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

February 22, 1979

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle. Selected fuel assemblies will be modified by installation of sleeves in the Guide Tubes.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 300 Spent Fuel Pools are common to Units 1 and 2.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

l056 Licensed 728 Currently Installed 650 Addition is Planned

9. The projected date of the last refueling that can be discharged to the spent fuel pcol assuming the present licensed capacity.

October, 1983

                                                           ~

2238 228

6/12/79 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit 2
2. Scheduled date for next Refueling Shutdown: October 6, 1979
3. Scheduled date for restart following refueling: November 14, 1979
4. Will refueling or resumption of operation thereafter require a technical speci-fication change or other license amendment?

Resumption of operation after refueling will require changes to Technical Speci-fications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting infonnation.

August 15, 1979 **

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 300 Spent Fuel Pools are common to Units 1 and 2.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1056 Licensed 728 Currently Installed 650 Addition is Planned

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

October, 1983

   ** Information has changed since last monthly report.

2238 229

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE May 1979 5/1 At the beginning of this reporting period, Unit I was shut down for its scheduled third refueling outage. 5/21 At 0750, completed refueling the reactor. 5/29 At 2200, the reactor vessel head was installed. 5/31 At the end of this reporting period, Unit I remained shut down for its scheduled third refueling outage. 2238 230

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE May 1979 5/1 At the beginning of this reporting period, Unit 2 was operating at 900 We with the reactor at 100% power. 5/5 Load was reduced to 765 We at 2330 for main turbine control valve testing. 5/6 Full load operation (895 We) resumed at 0530 after completion of control valve testing. 5/7 The main turbine was automatically tripped at 1530 due to a blown fuse on DC power to 21 inverter, which caused an actuation of the engineered safety features Actuation System Turbine UV relay. The reactor tripped on loss of load. The reactor was brought critical at 2510. 5/8 The Unit was paralleled at 0055. Full load operation (883 We) resumed at 2330. 5/20 Load was decreased to 767 We at 0015 for main turbine control valve tes ting. Full load operation (870 We) resumed at 0600. At 1144 control element assembly (CEA) 36 dropped into the core.

 ,      Reactor power was innediately reduced to less than 70% in accordance with the Technical Specifications. CEA 36 was withdrawn back to its group at 1230. Full load operation (870 We) resumed at 1830.

5/23 Began reducing load at 1150 to take the main turbine off line to re-pair an oil leak on Unit transformer U-22,000 - 22. The Unit was taken off line at 1545. The reactor remained critical. 5/24 The Unit was paralleled at 0216. Full load operation (860 We) re-sumed at 1230. 5/27 Began reducing load at 0025 to take the main turbine off line to repair an oil leak on Unit transformer U-22,000- 22. The Unit was taken off line at 0424. The reactor tripped at 0434 due to low steam generator levels. The reactor was brought critical at 1729 and the Unit was paralleled at 2258. 5/28 Full load operation (870 We) resumed at 1600. 5/31 At the end of this reporting period, Unit 2 was operating at 870 We with the reactor at 100% power. 2238 231

SAFETY-RELATED MAINTENANCE UNIT I GROUP I&C MONTH MAY YEAR 1979 , MALFUNCTION SYfirEM OR COMPONENT MR NO. - DATE CAUSE RESILT CORRECTIVE ACTIOF , Wide Range Nuclear IC-19-011 1/10/79 Defective proportional Low so_urce counts Replaced detector Instrumentation counter Channel "D" Wide Range Nuclear IC-79-010 1/10/79 Defective proportional Low source counts - Replaced detector Instrumentation counter Channel "B" e N tra CD N tra N

SAFETY-RELATED MAINTEN/11CE UNIT I GBOUP MAINTENANCE MONTH MAY YEAR 1979 MALFUNCTION SYSTEM OR COMPONENT MR NO. - DATE CAUSE RESULT CORRECTIVE ACTION

     #11 Salt Water Pump   M-78-407   7/11/78   Badly worn shaft sleeve,    Excessive gland leakoff. Reconditioned stuff-shaft, and bearings.        No adjustment of gland   ing box, replaced    '

Stuffing box covered possible. shaft, shaft sleeve, with scale and deterio- and bearings. Re-rated paint. packed pump. 1-RV-325 M-79-156 1/31/79 Scratched disc seating Valve leaked by seat Replaced disc

     #12 Charging Pump                          surface                                              assembly Discharge Relief Valve
   ~ 1-M0V-509             M-79-280   3/15/79   Natural end of life -      Motor operator would      Rebuilt motor Boric Acid Storage                         cyclic fatique of parts. not cycle                operator.

[[j Tanks to Charging Pumps (,, CD N Lea LeJ

SAFETY-RELATED MAINTENANCE UNIT II GROUP IEC MONTH MAY YEAR 1979 MALFUNCTION SYSTEM OR COMPONENT MR NO. - DATE CAUSE RESULT CORRECTIVE ACTION Reactor Protective 0-79-356 1/28/79 Defective flow trans- Reading out of tolerance

                                                                                    ~

Replaced flow System / Reactor Coolant mitter instrument. transmitter and Total Flow' Channel "D" 2-PDT-lllD repacked instrument caused by leaking isolation valve isolation valve

    #24 Containment Air      0-79-884   3/11/79   Defective flow trans-      Indicator pegged low        Replaced flow Cooler / Service Water                       mitter                                                 transmi.tter Flow Transmitter 1-FI-1592 e

N U CD N u k

                                                                             .}}