ML13023A358: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 23, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-4352   January 2 3, 2013   Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF INSPECTION AND INFORMATION REQUEST  
QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF INSPECTION AND INFORMATION REQUEST - BASELINE INSPECTION
- BASELINE INSPECTION


==Dear Pacilio:==
==Dear Pacilio:==
On March 1 1, 2013 , the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection (Procedure 71111.08). This on-site inspection is scheduled to be performed March 1 1 through March 20, 2013. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on
 
-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up
On March 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection (Procedure 71111.08). This on-site inspection is scheduled to be performed March 11 through March 20, 2013.
-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on
Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
-site portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Thomas Petersen of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. Atif Shaikh at (630) 829-9824 or via e-mail at atif.shaikh@nrc.gov.
We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Thomas Petersen of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. Atif Shaikh at (630) 829-9824 or via e-mail at atif.shaikh@nrc.gov
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
 
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
M. Pacilio                                   In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
Sincerely,
-rm/adams.html (the Public Electronic Reading Room).
                                              /RA by M. Holmberg for/
Sincerely, /RA by M. Holmberg for/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-254 License No. 29
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50
-254 License No.
29  


==Enclosure:==
==Enclosure:==
Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:    Distribution via ListServ'


Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On
INSERVICE INSPECTION DOCUMENT REQUEST Inspection Report:             05000254/2013002 Inspection Dates:             March 11 - 20, 2013 Inspection Procedures:         Inspection Procedure 71111-08, Inservice Inspection Inspectors:                   Atif Shaikh Reactor Engineer (Lead)
-site During Inspection) cc w/encl:
(630) 829-9824 Atif.shaikh@nrc.gov Vijay Meghani, Reactor Engineer (630) 829-9751 Vija.meghani@nrc.gov A. Information for the in-office preparation week The following information (electronic copy CD ROM if possible) is requested by February 28, 2013, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. The following information is applicable to Unit 1 unless otherwise indicated. If you have any questions regarding this information, please call the inspector as soon as possible.
Distribution via ListServ
Ž INSERVICE INSPECTION DOCUMENT REQUEST 1 Enclosure Inspection Report
: 05000 254/20 13002 Inspection Dates
: March 11 - 20, 2013 Inspection Procedures
: Inspection Procedure 71111-08 , "Inservice Inspection
" Inspectors(630) 829-9824 :   Atif Shaikh Reactor Engineer (Lead) Atif.shaikh@nrc.gov Vijay Meghani, Reactor Engineer (630) 829-9751 Vija.meghani@nrc.gov A. Information for the in
-office preparation week The following information (electronic copy CD ROM if possible) is requested by February 28, 2013
, to facilitate the selection of specific items that will be reviewed during the on
-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on
-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection.
The following information is applicable to Unit 1 unless otherwise indicated. If you have any questions regarding this information, please call the inspector as soon as possible.
: 1. For the upcoming outage, a detailed schedule and description of:
: 1. For the upcoming outage, a detailed schedule and description of:
: a. non-destructive examinations (NDE) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Code Inservice Inspection (ISI) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk
: a. non-destructive examinations (NDE) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Code Inservice Inspection (ISI) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk-Informed (RI)-ISI Program, or other augmented inspection programs commitments, as part of an industry initiative. For each weld examination, include the weld identification number, description of weld (component name),
-Informed (RI)
category, class, type of exam and procedure number, and date of examination; and
-ISI Program, or other augmented inspection programs commitments
, as part of an industry initiative. For each weld examination, include the weld identification number, description of weld (component name), category, class, type of exam and procedure number, and date of examination; and
: b. welding on Code Class 1, 2, or 3 components.
: b. welding on Code Class 1, 2, or 3 components.
: 2. A copy of the NDE procedures and welding procedures used to perform the activities identified in Item A.1 (including NDE calibration and flaw characterization/sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).
: 2. A copy of the NDE procedures and welding procedures used to perform the activities identified in Item A.1 (including NDE calibration and flaw characterization/sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).
INSERVICE INSPECTION DOCUMENT REQUEST 2 Enclosure 3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in Item A.1. 4. A copy of the 10
1                                      Enclosure
-year ISI Program showing those required exams scheduled to be performed this outage, and those which have been completed.
 
INSERVICE INSPECTION DOCUMENT REQUEST
: 3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in Item A.1.
: 4. A copy of the 10-year ISI Program showing those required exams scheduled to be performed this outage, and those which have been completed.
: 5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.
: 5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.
: 6. List with short description of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation (e.g., NIS-2 forms with definitions of system and component acronyms).
: 6. List with short description of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation (e.g.,
NIS-2 forms with definitions of system and component acronyms).
: 7. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.
: 7. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.
: 8. List with description of ISI related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, MIC) or errors identified in piping examinatio ns that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage.
: 8. List with description of ISI related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, MIC) or errors identified in piping examinations that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage.
: 9. Copy of any 10 CFR Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
: 9. Copy of any 10 CFR Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
B. On-Site Information to be Provided to the Inspector on the First Day of the Inspection (e.g.
B. On-Site Information to be Provided to the Inspector on the First Day of the Inspection (e.g., following the entrance meeting). Please Provide Hard Copies (e.g., paper records) of the Following Documents.
, following the entrance meeting). Please Provide Hard Copies (e.g.
: 1. For welds selected by the inspector from Items A.1.b and A.6 above, provide copies of the following documents:
, paper records) of the Following Documents. 1. For welds selected by the inspector from Items A.1.b and A.6 above, provide copies of the following documents:
: a. Document of the weld number and location (e.g., system, train, branch);
: a. Document of the weld number and location (e.g., system, train, branch); b. Document with a detail of the weld construction (e.g., drawing); c. Applicable Code Edition and Addenda for construction of the weldment (e.g., B31.1 or ASME Section III)
: b. Document with a detail of the weld construction (e.g., drawing);
; d. Applicable Code Edition and Addenda for welders' procedure qualification
: c. Applicable Code Edition and Addenda for construction of the weldment (e.g., B31.1 or ASME Section III);
;
: d. Applicable Code Edition and Addenda for welders procedure qualification; 2                                      Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST 3 Enclosure e. Applicable weld procedures specification (WPS) used to fabricate the welds; f. Copies of procedure qualification records (PQRs) supporting the WPS; g. Copies of welders' performance qualification records (WPQ);
 
INSERVICE INSPECTION DOCUMENT REQUEST
: e. Applicable weld procedures specification (WPS) used to fabricate the welds;
: f. Copies of procedure qualification records (PQRs) supporting the WPS;
: g. Copies of welders performance qualification records (WPQ);
: h. Copies of mechanical test reports identified in the PQRs above;
: h. Copies of mechanical test reports identified in the PQRs above;
: i. Copies of the non
: i. Copies of the non-conformance reports for the selected welds;
-conformance reports for the selected welds; j. Access to radiographs and equipment to view radiographs of the selected welds; and
: j. Access to radiographs and equipment to view radiographs of the selected welds; and
: k. Copies of the pre
: k. Copies of the pre-service examination records for the selected welds.
-service examination records for the selected welds. 2. For the ISI related corrective action issues selected by the inspector from A.8 above, provide a copy of the corrective actions and supporting documentation.
: 2. For the ISI related corrective action issues selected by the inspector from A.8 above, provide a copy of the corrective actions and supporting documentation.
: 3. For the non
: 3. For the non-destructive examination reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector from Item A.5 above, provide a copy of the examination records and associated corrective action documents.
-destructive examination reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector from Item A.5 above, provide a copy of the examination records and associated corrective action documents.
: 4. Updated schedules for Item A.1 (including schedule showing contingency repair plans if available).
: 4. Updated schedules for Item A.1 (including schedule showing contingency repair plans if available).
: 5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined during the outage. Also provide any drawings used by NDE vendor s to locate these welds.
: 5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined during the outage. Also provide any drawings used by NDE vendors to locate these welds.
: 6. Provide copies of the following standards at the on
: 6. Provide copies of the following standards at the on-site NRC inspection location for the duration of the inspection:
-site NRC inspection location for the duration of the inspection:
: a. Sections V, IX, and XI of the ASME Code with Editions applicable to the Inservice Inspection Program and the Repair/Replacement Program; and
: a. Sections V, IX, and XI of the ASME Code with Editions applicable to the Inservice Inspection Program and the Repair/Replacement Program; and b. Copy of the performance demonstration initiative (PDI) generic procedures with the latest applicable revisions that support site qualified ultrasonic examination of piping welds and components (e.g.
: b. Copy of the performance demonstration initiative (PDI) generic procedures with the latest applicable revisions that support site qualified ultrasonic examination of piping welds and components (e.g.,
, PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-10 etc.). 7. Provide training (e.g., Scaffolding, Fall Protection, FME) if required to access the non
PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-10 etc.).
-destructive examinations selected by the inspector for observation. If you have questions regarding the information requested, please contact the lead inspector.
: 7. Provide training (e.g., Scaffolding, Fall Protection, FME) if required to access the non-destructive examinations selected by the inspector for observation.
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
If you have questions regarding the information requested, please contact the lead inspector.
-rm/adams.html (the Public Electronic Reading Room).
3                                        Enclosure
Sincerely, 
/RA by M. Holmberg for/


David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50
M. Pacilio                                                                In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-254 License No.
Sincerely,
29  
                                                                          /RA by M. Holmberg for/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-254 License No. 29


==Enclosure:==
==Enclosure:==
 
Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:               Distribution via ListServ' DISTRIBUTION:
Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On
John Cassidy RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 012313 Quad Cities ISI Unit 1 RFI AAS.docx Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII                                     RIII                     RIII NAME               AShaikh:ls                           DEHills DATE               01/22/13                             01/23/13 OFFICIAL RECORD COPY}}
-site During Inspection) cc w/encl:
Distribution via ListServ
Ž DISTRIBUTIONJohn Cassidy
: RidsNrrDorlLpl3
-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress
\Ltr. 012313 Quad Cities ISI Unit 1 RFI AAS.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME AShaikh:ls DEHills   DATE 01/22/13 01/23/13   OFFICIAL RECORD COPY}}

Latest revision as of 23:16, 4 November 2019

Ltr. 01/23/13 Quad Cities ISI, Unit 1, Request for Information
ML13023A358
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/23/2013
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Atif Shaikh
References
Download: ML13023A358 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 23, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF INSPECTION AND INFORMATION REQUEST - BASELINE INSPECTION

Dear Pacilio:

On March 11, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection (Procedure 71111.08). This on-site inspection is scheduled to be performed March 11 through March 20, 2013.

Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Thomas Petersen of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. Atif Shaikh at (630) 829-9824 or via e-mail at atif.shaikh@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

M. Pacilio In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by M. Holmberg for/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-254 License No. 29

Enclosure:

Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Distribution via ListServ'

INSERVICE INSPECTION DOCUMENT REQUEST Inspection Report: 05000254/2013002 Inspection Dates: March 11 - 20, 2013 Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection Inspectors: Atif Shaikh Reactor Engineer (Lead)

(630) 829-9824 Atif.shaikh@nrc.gov Vijay Meghani, Reactor Engineer (630) 829-9751 Vija.meghani@nrc.gov A. Information for the in-office preparation week The following information (electronic copy CD ROM if possible) is requested by February 28, 2013, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. The following information is applicable to Unit 1 unless otherwise indicated. If you have any questions regarding this information, please call the inspector as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:
a. non-destructive examinations (NDE) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Code Inservice Inspection (ISI) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk-Informed (RI)-ISI Program, or other augmented inspection programs commitments, as part of an industry initiative. For each weld examination, include the weld identification number, description of weld (component name),

category, class, type of exam and procedure number, and date of examination; and

b. welding on Code Class 1, 2, or 3 components.
2. A copy of the NDE procedures and welding procedures used to perform the activities identified in Item A.1 (including NDE calibration and flaw characterization/sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).

1 Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in Item A.1.
4. A copy of the 10-year ISI Program showing those required exams scheduled to be performed this outage, and those which have been completed.
5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.
6. List with short description of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation (e.g.,

NIS-2 forms with definitions of system and component acronyms).

7. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.
8. List with description of ISI related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, MIC) or errors identified in piping examinations that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage.
9. Copy of any 10 CFR Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

B. On-Site Information to be Provided to the Inspector on the First Day of the Inspection (e.g., following the entrance meeting). Please Provide Hard Copies (e.g., paper records) of the Following Documents.

1. For welds selected by the inspector from Items A.1.b and A.6 above, provide copies of the following documents:
a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing);
c. Applicable Code Edition and Addenda for construction of the weldment (e.g., B31.1 or ASME Section III);
d. Applicable Code Edition and Addenda for welders procedure qualification; 2 Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

e. Applicable weld procedures specification (WPS) used to fabricate the welds;
f. Copies of procedure qualification records (PQRs) supporting the WPS;
g. Copies of welders performance qualification records (WPQ);
h. Copies of mechanical test reports identified in the PQRs above;
i. Copies of the non-conformance reports for the selected welds;
j. Access to radiographs and equipment to view radiographs of the selected welds; and
k. Copies of the pre-service examination records for the selected welds.
2. For the ISI related corrective action issues selected by the inspector from A.8 above, provide a copy of the corrective actions and supporting documentation.
3. For the non-destructive examination reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector from Item A.5 above, provide a copy of the examination records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency repair plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined during the outage. Also provide any drawings used by NDE vendors to locate these welds.
6. Provide copies of the following standards at the on-site NRC inspection location for the duration of the inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the Inservice Inspection Program and the Repair/Replacement Program; and
b. Copy of the performance demonstration initiative (PDI) generic procedures with the latest applicable revisions that support site qualified ultrasonic examination of piping welds and components (e.g.,

PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-10 etc.).

7. Provide training (e.g., Scaffolding, Fall Protection, FME) if required to access the non-destructive examinations selected by the inspector for observation.

If you have questions regarding the information requested, please contact the lead inspector.

3 Enclosure

M. Pacilio In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by M. Holmberg for/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-254 License No. 29

Enclosure:

Inservice Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Distribution via ListServ' DISTRIBUTION:

John Cassidy RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 012313 Quad Cities ISI Unit 1 RFI AAS.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME AShaikh:ls DEHills DATE 01/22/13 01/23/13 OFFICIAL RECORD COPY