{{#Wiki_filter:August 11, 2014
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 August 11, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NRC SECURITY BASELINE INSPECTION REPORT 05000237/2014 406; 05000249/2014 406 Dear Mr. Pacilio
 
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NRC SECURITY BASELINE INSPECTION REPORT 05000237/2014 406; 05000249/2014 406  
 
Dear Mr. Pacilio
: On June 25, 201 4, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Statio The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclosed inspection report documents the inspection results which were discus sed on July 15, 2014 , with Mr. S. Marik and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licens The inspector s reviewed selected procedures and records, observed activities, and interviewed personne No findings were identified during this inspectio In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
: On June 25, 201 4, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Statio The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclosed inspection report documents the inspection results which were discus sed on July 15, 2014 , with Mr. S. Marik and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licens The inspector s reviewed selected procedures and records, observed activities, and interviewed personne No findings were identified during this inspectio In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).



Revision as of 20:04, 14 July 2019

IR 05000237-14-406; 05000249-14-406; on 06/25/2014; Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection. (Cover Letter Only)
ML14223A757
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/11/2014
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Joseph Maynen
References
IR-14-406
Download: ML14223A757 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 August 11, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NRC SECURITY BASELINE INSPECTION REPORT 05000237/2014 406; 05000249/2014 406 Dear Mr. Pacilio

On June 25, 201 4, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Statio The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclosed inspection report documents the inspection results which were discus sed on July 15, 2014 , with Mr. S. Marik and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licens The inspector s reviewed selected procedures and records, observed activities, and interviewed personne No findings were identified during this inspectio In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM Enclosure contains Sensitive Unclassified Non-Safeguards Informatio When separated from enclosure, this transmittal document is decontrolle M. Pacilio-2- If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information

- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your respons Should you have any questions concerning this inspection, we will be pleased to discuss them with yo

Sincerely,

/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure:

Inspection Report

05000237/2014 406; 05000249/2014 406 w/Attachment: Supplemental Information

cc w/encl: