IR 05000237/2020403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000237/2020403 and 05000249/2020403
ML20351A354
Person / Time
Site: Dresden  
Issue date: 12/16/2020
From: Steven Orth
Division of Reactor Safety III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020403
Download: ML20351A354 (8)


Text

December 16, 2020

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000237/2020403 AND 05000249/2020403

Dear Mr. Hanson:

On December 4, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with Mr. Patrick Boyle, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2020403 and 05000249/2020403

Enterprise Identifier: I-2020-403-0028

Licensee:

Exelon Generation Company, LLC

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

September 28, 2020 to December 4, 2020

Inspector:

A. Anderson, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Dresden Nuclear Power Station,

Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following inspection elements:

Access Control (1 Partial)

(1)

(Partial)

  • Tier I: 02.01 a, b, c, d, e; 02.02 g; 02.04 a, b, c, d, e; 02.05 a
  • Tier II: 02.06 a, b, c, d; 02.07 a; 02.08 a, b, c, d
  • Tier III: 02.09

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

The inspector evaluated the security plan changes through completion of the following procedure elements:

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this inspection procedure.

Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2)since the last performance of this inspection procedure.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

The inspector verified licensee performance indicator submittals listed below:

(1)

(02/01/2019 - 08/20/2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On December 4, 2020, the inspector presented the security baseline inspection results to Mr. Patrick Boyle, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

IR 04366707

Key and Core Change Need Identified

09/01/2020

Miscellaneous

Security Vital Area Lock and Core Change-out Log

09/01/2020

through

09/05/2020

Procedures

PI-AA-126-1001-

F-01

AR 04285582: Self-Assessment for 71130.02

Rev 3;

2/01/2020

through

03/13/2020

SY-AA-101-103-

514

Site Authorization for Unescorted Access

SY-AA-101-106

Control and Classification of Safeguards Information and

Sensitive Unclassified Non-Safeguards Information

SY-AA-101-112-

1002

Unitech Laundry Facility Search Processes

SY-AA-101-112-

1003

Ion Scanning Explosives Detector (ISED) Search Processes

SY-AA-101-112-

1004

Protected Area Search Processes

SY-AA-101-112-

1005

Owner Controlled Area Inspections Processes

SY-AA-101-115

Controlling Gates and Power Operated Active Vehicle

Barriers

SY-AA-101-116

Conducting Patrols

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

SY-AA-101-117-

F-03

Visitor/Vehicle Registration Log

SY-AA-101-120

Control of Security Access Control Devices

SY-AA-101-120-

F-01

Key Issuance Log

Rev 2;

05/27/2020

SY-AA-101-120-

F-02

Key Inventory Log

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-122

Testing Security Equipment

SY-AA-101-122-

1001

Performance of Security System Tests

SY-AA-101-122-

1001-F-01

Special Purpose Detector Test Log

SY-AA-101-130

Security Responsibilities for Station Personnel

SY-AA-103-500

Access Authorization Program

SY-DR-101-101-

F-13

Security Area Door Log

Rev 1;

05/11/2020

SY-DR-101-112

Dresden Site Search and Access Controls

SY-DR-101-115

Dresden Operation of Active Vehicle Barriers

SY-DR-101-115-

1002

Dresden Gate Control

SY-DR-101-119

Control of Receiving Warehouses

SY-DR-101-122-

1001

Dresden Site Specific Testing

71151

Miscellaneous

PowerPoint Presentation: How To PP01

08/13/2020

Performance Indicator Summary Report

08/13/2020

PI-AA-126-1001-

F-01

AR 04285576: Self-Assessment

Rev 2;

2/03/2020

Procedures

SY-AA-101-155

Security Events and the NRC Performance Indicators

SY-AA-101-155-

F-05

Protected Area Security Equipment Performance Indicator

Report

Rev 1;

09/01/2019

through

08/31/2020