{{#Wiki_filter:NRC MONTHLY OPERATING REPORT~~AMENDED~~DOCKET NO.50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: ebrua 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: A 11.12.13.14.15.16.17.18.19.20.21.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor This Month 6 2 551 0 0 0 551 0 0 0 2 064 631 26 800 683 616 Yr.-to-Date 1 416 1 295 0 0 0 1 295 0 0 0 480 00 1 12 500 1 614 008 Cumulative 30 216 20 546 1 0 0 0 042 2 0 0 3 499 053 23 996 820 I 66 3s 66 3 22'3.24.(Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 83 3 80 1 0 0 93 4 89 8 0 0 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A 65 0%62 5 9 9 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Ma 31 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86~06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 9006050337 9005$i PDR ADOCK 05000529 R'DC 6 C l I I}}
{{#Wiki_filter:~~       AMENDED   ~~
NRC MONTHLY OPERATING REPORT DOCKET NO.       50-529 DATE COMPLETED BY K F       Porter OPERATING STATUS
: 1.       Unit Name:   Palo Verde Nuclear Generatin Station Unit 2
: 2.      Reporting Period:       ebrua   1990
: 3.      Licensed Thermal Power (MWt): 3800
: 4.      Nameplate Rating (Gross MWe):       1403
: 5.      Design Electrical Rating (Net MWe): ~12 0
: 6.      Maximum Dependable Capacity (Gross MWe): 1303
: 7.      Maximum Dependable Capacity (Net MWe):         1221
: 8.      If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:       N A
: 9.      Power Level   to Which Restricted, If Any (Net     MWe): None 10      Reasons For   Restrictions, If Any:     A This Month          Yr.-to-Date          Cumulative
: 11.     Hours   in Reporting Period                   6 2                1 416                  30 216
: 12.      Number of Hours Reactor Was Critical                               551 0              1 295 0                20 546 1
: 13.      Reactor Reserve Shutdown Hours                 0 0                  0 0                  0 0
: 14.      Hours Generator On-Line                     551 0              1 295 0                  0 042 2
: 15.      Unit Reserve   Shutdown Hours                 0 0                  0 0                  0 0
: 16.      Gross Thermal Energy Generated (MWH)                             2 064 631            480      00          3  499 053
: 17.      Gross Electrical Energy Generated (MWH)                               26 800            1  12 500
: 18.      Net Electrical Energy Generated (MWH)                             683 616             1 614 008           23 996 820   I
: 19.      Unit Service Factor                                                                      66 3s
: 20.      Unit Availability Factor                                                                  66 3
: 21.     Unit Capacity Factor (Using   MDC Net)                             83 3                93 4                  65 0%
22      Unit Capacity Factor (Using   DER Net)                             80 1                89 8                  62 5 Unit Forced
  '3.
Outage Rate                     0 0                 0 0                   9 9
: 24.      Shutdowns Scheduled Over Next     6 Months (Type, Date and Duration     of Each):
N A
: 25.     If Shutdown   At End of Report Period, Estimated   Date of Start-up:
Ma   31   1990 Forecast              Achieved INITIAL CRITICALITY                           ~03 86               ~04 18 86 INITIAL ELECTRICITY                          ~06 86               05 20 86 COMMERCIAL OPERATION                          ~11 86                09 19 86 PDR R
            'DC 9006050337 9005$ i ADOCK 05000529 6
 
C l
I I}}

Latest revision as of 10:27, 29 October 2019

Errata to Monthly Operating Rept for Feb 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A862
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050337
Download: ML17305A862 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: ebrua 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 6 2 1 416 30 216
12. Number of Hours Reactor Was Critical 551 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 551 0 1 295 0 0 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 2 064 631 480 00 3 499 053
17. Gross Electrical Energy Generated (MWH) 26 800 1 12 500
18. Net Electrical Energy Generated (MWH) 683 616 1 614 008 23 996 820 I
19. Unit Service Factor 66 3s
20. Unit Availability Factor 66 3
21. Unit Capacity Factor (Using MDC Net) 83 3 93 4 65 0%

22 Unit Capacity Factor (Using DER Net) 80 1 89 8 62 5 Unit Forced

'3.

Outage Rate 0 0 0 0 9 9

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

Ma 31 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY ~06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 PDR R

'DC 9006050337 9005$ i ADOCK 05000529 6

C l

I I