{{#Wiki_filter:NRC MONTHLY OPERATING REPORT~~AMENDED~~DOCKET NO.50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 II"-"" Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe):~140 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): one Reasons For Restrictions, If Any: N A ll 12 13.14.15.16.17 18.19.20.21.22 23.24.This Month 44 Yr.-to-Date 2 160 1 295 0 0 0 1 295 0 61.2a Hours in Reporting Period Number of Hours Reactor Was Critical 0 0 Reactor Reserve Shutdown Hours 0 0 Hours Generator On-Line 0 0 Unit Reserve Shutdown Hours 0 0 0 0 Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 1 712 500 Net Electrical Energy Generated (MWH)0 1 614 008 Unit Service Factor 45.0a Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A Cumulative 30 960 20 546 1 0 0 20 042 2 0 0 3 499 053 25 682 370 23 996 820 I 63.3a 63.3a 63 5a 61 0%9 9a 25.If Shutdown At End of Report Period, Estimated Date of Start-up: June 09 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86 06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 9006050340 900531 PDR ADOCK 05000529 R PDC 6-0 gl I I I l i l l f}}
{{#Wiki_filter:~~       AMENDED   ~~
NRC MONTHLY OPERATING REPORT DOCKET NO.     50-529 DATE COMPLETED BY K F       Porter OPERATING STATUS 1.
2.
3.
4.
Unit Name:
II" Palo Verde Nuclear Generatin
                            ""
Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe):     ~140 Station    Unit  2
: 5. Design Electrical Rating (Net MWe): ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):       1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers       3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net     MWe):     one
: 10. Reasons For   Restrictions, If Any: N A This Month             Yr.-to-Date           Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44                    2 160                  30 960 Was Critical                                 0 0                 1 295  0              20 546 1
: 13. Reactor Reserve Shutdown Hours               0  0                    0 0                 0 0
: 14. Hours Generator On-Line                       0  0                 1 295  0             20 042 2
: 15. Unit Reserve   Shutdown Hours                 0  0                    0 0                 0 0
: 16. Gross Thermal Energy Generated (MWH)                                 0                                       3  499 053 17  Gross Electrical Energy Generated (MWH)                                 0                 1 712 500         25 682 370
: 18. Net Electrical Energy Generated (MWH)                                 0                 1 614 008         23 996 820  I
: 19. Unit Service Factor                                                   45.0a                 63.3a
: 20. Unit Availability Factor                                                                   63.3a
: 21. Unit Capacity Factor (Using MDC Net)                                                     61.2a                63 5a 22  Unit Capacity Factor (Using   DER Net)                                                                           61 0%
: 23. Unit Forced   Outage Rate                                                                   9 9a
: 24. Shutdowns Scheduled Over Next   6 Months (Type, Date and Duration         of Each):
N A
: 25. If Shutdown At End   of Report Period, Estimated   Date   of Start-up:
June 09 1990 Forecast                Achieved INITIAL CRITICALITY                           ~03 86                   ~04 18 86 INITIAL ELECTRICITY                              06 86                05 20 86 COMMERCIAL OPERATION                          ~11 86                  09 19 86 9006050340 900531                           6-PDR     ADOCK 05000529 R                   PDC
 
0 gl I
I I
l i l l
f}}

Revision as of 10:27, 29 October 2019

Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A863
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050340
Download: ML17305A863 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

Unit Name:

II" Palo Verde Nuclear Generatin

""

Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2

5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 1 295 0 20 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370
18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I
19. Unit Service Factor 45.0a 63.3a
20. Unit Availability Factor 63.3a
21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0%
23. Unit Forced Outage Rate 9 9a
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC